Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
Layout Design GalleryLayout Design Special Interest Group
QUOTE: Originally posted by puristpilot2 One More Question, what size turnouts would be appropriate for the industrial spur, and what size would work for the mainline track? Thanks
QUOTE: Originally posted by puristpilot2 This is one idea for a 2X6 industrial switcher but I odn't know how good it is.