Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Two Levels: Height and Spacing

1106 views
4 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Two Levels: Height and Spacing
Posted by SpaceMouse on Friday, March 4, 2005 8:09 AM
IF I were to build a two level layout. What should my heights be and what should the spacing between the top and lower levels? Also for shelf widths I was thinking 30" and 20".

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    September 2002
  • 7,486 posts
Posted by ndbprr on Friday, March 4, 2005 8:22 AM
The widths are ok but what scale? In HO a minimum of 12" up to about 18" for height is typical subject to the first level height. If you start at 48" base that makes the top level somewhere between 60" and 66" so it will be hard for short people to see it. Conversely if you are tall and you lower the base level you won't be able to see all the way to the back. of the lower level I suspect these rules apply to N also.
  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Friday, March 4, 2005 8:29 AM
Sorry it is HO.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

  • Member since
    March 2002
  • From: Elgin, IL
  • 3,677 posts
Posted by orsonroy on Friday, March 4, 2005 8:42 AM
It really depends on what you can realistically manage (grades, mostly) and what looks acceptable to you. I've seen layouts with as little as 8" between decks, and as much as 30". My own triple level layout ranges from 8" to about 16", with 13" being about average. the areas of 12"-14" look fine to me.

If you're building a multilevel with a helix, getting more space between decks isn't that big of a deal. Just add another loop to the helix. But if you go for a helix-less design, you'll either need a long run, or have really steep grades and a shorter space between levels.

Ray Breyer

Modeling the NKP's Peoria Division, circa 1943

  • Member since
    December 2004
  • From: Rimrock, Arizona
  • 11,251 posts
Posted by SpaceMouse on Friday, March 4, 2005 8:51 AM
I'm planning a modified helix. It is basically the mountain to Hogwarts will have a increasing smaller loops that go in and out of tunnels at increasingly higher elevations. With these old steamers, I'm trying to keep the grade under 2%.

Chip

Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!