Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

What comes first?

1400 views
6 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    March 2009
  • 108 posts
What comes first?
Posted by derf on Monday, November 27, 2023 4:03 PM

I haven't pinpointed the exact buildings I plan to use on my layout yet. Do you wait to install the ground cover before or after deciding your buildings footprint?

Thanks, Fred

  • Member since
    March 2017
  • 129 posts
Posted by Canalligators on Monday, November 27, 2023 4:36 PM

I plan the structures and roadways first, with consideration for desired earth shape.  If you do ground form and cover first, you'll end up "excavating" a lot of it, just like real life.

In construction, I install a piece of fom-cor for building foundations and roofing shingle for roadways.  Then I fill the rest of the area with my earth fill of choice.

Genesee Terminal, freelanced HO in Upstate NY
  ...hosting Loon Bay Transit Authority and CSX Intermodal.  Interchange with CSX (CR)(NYC).

CP/D&H, N scale, somewhere on the Canadian Shield

  • Member since
    February 2008
  • 2,360 posts
Posted by kasskaboose on Monday, November 27, 2023 6:31 PM

Plenty do either one.  I prefer buildings first and then add the ground cover.  Many of my buildings are in industrial areas, so ground foam isn't an issue.  The one exception is a farmhouse and barn, which is not on foam painted to mimic concrete.  I put it in and then the ground cover.  

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,281 posts
Posted by richhotrain on Monday, November 27, 2023 6:46 PM

On my layouts, ground cover comes last after ballast, roads, structures.

Rich

Alton Junction

  • Member since
    December 2004
  • From: Bedford, MA, USA
  • 21,484 posts
Posted by MisterBeasley on Monday, November 27, 2023 8:42 PM

richhotrain

On my layouts, ground cover comes last after ballast, roads, structures.

Rich

 

I do ballast last, but buildings are late in my process, too.

It takes an iron man to play with a toy iron horse. 

  • Member since
    July 2006
  • From: west coast
  • 7,670 posts
Posted by rrebell on Tuesday, November 28, 2023 7:34 AM

Depends, some buildings have to be planned for like stations etc. It also depends on terrain, had one water tower that I had planned for but did not allow enough space, had to escavate.

  • Member since
    February 2008
  • 327 posts
Posted by AEP528 on Tuesday, November 28, 2023 8:29 AM

derf

I haven't pinpointed the exact buildings I plan to use on my layout yet. Do you wait to install the ground cover before or after deciding your buildings footprint?

Thanks, Fred

 

I wait even longer - I use the actual building to mark the locations for the surrounding scenery because building footprints can change during construction. 

After the first couple of times I had to cut out or, even worse, extend driveways and parking lots I decided to stop trying to install them ahead of time.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!