QUOTE: Originally posted by HAZMAT9 Thanks Joe for the info, should I lay a base of 1/4" or so plywood beneath the 2" foam or use the existing cradle method and just attach a small plywood section for the river/canyon? Thanks, Steve
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.