I have three track plans in my head for my next HO scale layout
first is a single town with staging tracks. Passenger station, a branch line, a couple industries to switch. the layout is continuous
second is the end of a line of a secondary subdivisio. Layout is terminal to staging (no continuous running)
The third is a switching layout, no mainline. Train comes to the harbor, works industries, and back to staging.
which one to pick? I feel I'd be happy with either one.