QUOTE: Originally posted by Leon Silverman The packaging is the cost driver, not the wire. Must take an awfully long time to measure and cut the ends of the wire.
Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.