Login
or
Register
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Home
»
Model Railroader
»
Forums
»
Layouts and layout building
»
Tracklaying
Tracklaying
942 views
1 replies
Order Ascending
Order Descending
challenger3802
Member since
November 2004
From: Kent, England
348 posts
Posted by
challenger3802
on Monday, January 10, 2005 12:53 PM
Putting in switch machines is certainly far easier when the track is not glued down, however you will need to have it in temporary position, a good way I've found is to use drawing pins to pin the track down to the cork roadbed (you can tell what I'm using as a roadbed can't you!) With the track pinned down it's easy to see where switch machines need to go, wiring can also be done at this stage.
For the power connections to the track I solder 16/0.2mm wires to the sides of the trackwork (outside edge), channelling the wires down holes drilled in the trackbed 2 or 3 tiebars back.
Signal positions and on-track detection systems can also be put in at this time, before the glueing down happens. In this way if you need to reposition the track for any reason, or to drill extra holes, it is a lot easier to do.
As for occupancy detection in a helix and hidden storage yard, I'd want extra detectors at the entry and exit to a helix and more inside, relayed back to LEDs on the control panel. In this way I'd be able to see which way a train is facing in the helix at any given time, as the LEDs will light and extinguish with the movement of the train. (Although I like going over the top!)
Hope this helps you
Ian
Reply
Anonymous
Member since
April 2003
305,205 posts
Tracklaying
Posted by
Anonymous
on Monday, January 10, 2005 11:58 AM
Hi, I'm just about ready to start laying track, and I saw on another thread that putting in Tortoise Switch machines before laying the track is much easier.
I was also wondering what else can be put in as well before putting the track down? I plan on going the full nine yards with signalling systems, occupancy detection, crossing signals etc.
Also, I'd like to put in occupancy detection in a hidden helix and staging yard. Is this recommended and at what point do you locate it in the helix (beginning and end or in the middle as well)?
Regards
Reply
Edit
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Users Online
There are no community member online
Search the Community
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter
See all
Sign up for our FREE e-newsletter
and get model railroad news in your inbox!
Sign up