Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
Dave H. Painted side goes up. My website : wnbranch.com
Roger Hensley= ECI Railroad - http://madisonrails.railfan.net/eci/eci_new.html == Railroads of Madison County - http://madisonrails.railfan.net/ =
Simon Modelling CB&Q and Wabash See my slowly evolving layout on my picturetrail site http://www.picturetrail.com/simontrains and our videos at http://www.youtube.com/user/MrCrispybake?feature=mhum
QUOTE: Originally posted by jsalemi "Ground" level is around 50", with tracks running to about 6-7" above that and about 4-5" below (staging).
QUOTE: Originally posted by ebriley Table top is 50 inches above the floor
Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.
Ray Breyer
Modeling the NKP's Peoria Division, circa 1943
https://tstage9.wixsite.com/nyc-modeling
Time...It marches on...without ever turning around to see if anyone is even keeping in step.
There is no such thing as a bad day of railfanning. So many trains, so little time.