Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Rolling stock for layout operations

1307 views
5 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2019
  • 1 posts
Rolling stock for layout operations
Posted by SRRL Ron on Saturday, December 28, 2019 11:32 AM

Does anyone remember a article in a past MR that discussed the best number of freight cars for smooth operations based on specifics of your own layout?

I seem to remember that you put into a formula information about your layout's track and it would suggest a number of freight cars for smooth operations... not too many, but yet enough.

Looking for author name, issue number or title etc.

Thanks.  Ron

  • Member since
    December 2015
  • From: Shenandoah Valley
  • 9,094 posts
Posted by BigDaddy on Friday, January 3, 2020 8:30 PM

Welcome to the forum.  Initial posts are moderated, so it may have taken a while for this post to appear.

I don't know how anyone could calculate that because yards, staging track, mainline and sidings are all different lengths, but I will give your post a bump.

Henry

COB Potomac & Northern

Shenandoah Valley

  • Member since
    January 2017
  • From: Southern Florida Gulf Coast
  • 18,255 posts
Posted by SeeYou190 on Friday, January 3, 2020 8:35 PM

I figured mine out myself.

.

I added the capacity of all staging tracks, storage drawers, and half the yard and industries. I came up with 165 freight cars needed.

.

I now have over 200, and I am building more... so... I say why bother. You will just end up with too many anyway... we all do.

.

-Kevin

.

Living the dream.

  • Member since
    June 2003
  • From: Culpeper, Va
  • 8,204 posts
Posted by IRONROOSTER on Saturday, January 4, 2020 12:35 AM

The general rule of thumb I have seen is to add up the capacity of all your yards and sidings.  Add in the number of average number of cars per train that operate at the same time.  Add in staging capacity.  Divide the total by 2.  And that's the optimum number.

Of course this formula is really only a starting point.  A lot depends on what kind of operations you're planning.  For example if you run mainline trains from one staging yard to another with no switching along the way, you'll probably want more.  If you're operating a shortline, you may want less.

And then there's the mix.  If you like running long coal drags you'll want a lot of hoppers.  If your shortline has no coal dealers then maybe no hoppers.  And so forth.

Paul

If you're having fun, you're doing it the right way.
  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Saturday, January 4, 2020 1:04 AM

IRONROOSTER
The general rule of thumb I have seen is to add up the capacity of all your yards and sidings. Add in the number of average number of cars per train that operate at the same time. Add in staging capacity. Divide the total by 2. And that's the optimum number....

I skipped that rule completely, as I wanted enough home road cars (freelanced) to be the predominant ones in most trains, then added all sorts of interesting cars with prototype roadnames to allow me to replicate, more-or-less, the trains I saw in my hometown, which were literally from almost every common-carrier railroad in North America.

In the photo below, all of the boxes are for rolling stock...most have one car, but a lot have two and many of them hold four.  There are others, not shown, stored under the layout, and the ones under construction or only on my list of stuff-to-build are in my shop...

 

I did sell-off a couple hundred cars which were too modern when I backdated my layout, though, which helped to pay for what's in the photo.

Wayne

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Saturday, January 4, 2020 7:31 AM

I did some searching around in the Archives, and I did find an article by Roy F. Dohn, pages 46-48, in the June 1968 issue.  The article is loaded with formulas on number of rolling, how much a yard should hold, how many cars being switched, all kinds of formulas.

Not sure if that's what your looking for.

There is a lot to search, and it takes lots of time.

As others have, I developed my own traffic because I knew what industries I would have on my layout, and how often switching ops would be needed.

Then of course, there's more cars for run through trains.

I don't think it's that hard to figure out how much rolling stock your going to need.

Mike.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!