Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Open grid bench work

9836 views
24 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Posted by BATMAN on Wednesday, April 3, 2019 11:36 AM

I put my grid together using lap joints. It was easy to do, I just clamped the boards together and ran them through the saw. Three advantages of doing that are it all goes together quickly being perfectly spaced, is much stronger as each joint was glued and screwed. The third reason is, I can cut out a board and it doesn't affect the strength of the table.

Image result for lap joints

  

 

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Wednesday, April 3, 2019 11:25 AM

dknelson
but actually depending on how you do things the grid need not be the lowest point for terrain.  You could have a canyon or lake bed or other deep feature between grids that extends down below them and is supported by "reverse risers."  (Sinkers?)  But I have not seen many people do that.

Yes.  I would only do that if I didn't provide sufficient depth between the risers and the top of the open grid for the needed terrain feature.  The cross beams needed for structural strength in the grid would probably limit things such that ideally you would want to plan the elevation to avoid having to do that.

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    March 2002
  • From: Milwaukee WI (Fox Point)
  • 11,439 posts
Posted by dknelson on Wednesday, April 3, 2019 10:22 AM

Doughless

Jim, every time I see those photos, I'm always impressed with your precise work with the cardboard strips.  Hardly anything left to do with the plaster after all of that hard work. Smile

 

 
They are like works of art, aren't they?  Seems a shame to cover them with anything.
 
To get back to the topic: it was stated that the grid, not the riser, is your lowest point, but actually depending on how you do things the grid need not be the lowest point for terrain.  You could have a canyon or lake bed or other deep feature between grids that extends down below them and is supported by "reverse risers."  (Sinkers?)  But I have not seen many people do that.  Whatever it would be, it would be narrow.  And you'd have to wire around it.  And perhaps create the ultimate in under-the-layout duck (crawl?) unders.
 
Dave Nelson
  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Wednesday, April 3, 2019 9:00 AM

Doughless

Jim, every time I see those photos, I'm always impressed with your precise work with the cardboard strips.  Hardly anything left to do with the plaster after all of that hard work. Smile

 

I decided to actually use the cardboard stips to create fairly specific landforms rather than just a basic blob.  It's going to have to be done at some point so I figured cardboard and hot glue is one way to do it.  The alternative is cutting and shaving foam (lots of shreddys) or carving plaster etc.

I see it a bit like (to use a computer graphics term) raster scanning where the "picture" or scenery is drawn/created one slice at a time.  I liked how it worked so I'm thinking I'll probably do it again on a future layout.  The one change I will make is to make sure the track is above grade.  Last time it wasn't.

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    November 2002
  • From: US
  • 2,455 posts
Posted by wp8thsub on Tuesday, April 2, 2019 8:41 PM

Here's the process on my layout.

Lakeview Blue

by wp8thsub, on Flickr

This shot of early construction progress shows roadbed on risers.  The yard at left is elevated above the benchwork grid, and also has some 1X3" material secured under the plywood to keep it straight.  You can see the beginning of fascia on the right, with a piece of hardboard secured with a clamp.

Cedar Hill Ballast 4

by wp8thsub, on Flickr

The same location looked like this with all of the fascia and basic scenery in place.

Lakeview Aisle View 2

by wp8thsub, on Flickr

A view from the opposite direction illustrates how scenery extends above and below the roadbed.

Rob Spangler

  • Member since
    December 2008
  • From: Heart of Georgia
  • 5,406 posts
Posted by Doughless on Tuesday, April 2, 2019 6:30 PM

Jim, every time I see those photos, I'm always impressed with your precise work with the cardboard strips.  Hardly anything left to do with the plaster after all of that hard work. Smile

- Douglas

  • Member since
    February 2004
  • From: Central Ohio
  • 570 posts
Posted by basementdweller on Tuesday, April 2, 2019 6:18 PM

Thank you Riogrande.

  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Tuesday, April 2, 2019 7:36 AM

Yes, your open grid benchwork surface will be at the lowest elevation you anticipate terrain being at.  Even if the track does not need to climb or descend, it can be at an elevation such as 2, 4 or 6 inches or whatever, above the benchwork surface on rises.  Then you build the terrain to meet the track subroadbed.

Here is a photo showing my subroadbed on risers above opengrid benchwork.

 

Then you can use scenery methods to fill in the open area between the edge of the benchwork and the subroadbed which is above, such as foam or cardboard strips with hot glue, which is what I usesd here:

 

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    February 2004
  • From: Central Ohio
  • 570 posts
Posted by basementdweller on Tuesday, April 2, 2019 5:36 AM

Thank you, the grid is the lowest point, I knew  had my terminology mixed up. Now I have that straight more things start to make sense. 

  • Member since
    August 2013
  • From: Richmond, VA
  • 1,890 posts
Posted by carl425 on Monday, April 1, 2019 10:50 PM

basementdweller
What I am realizing now is the the risers are the lowest point

No, the grid is the lowest point.  The risers are what raises subroadbed above the grid.  The name "riser" should be a clue as to what they do.

I have the right to remain silent.  By posting here I have given up that right and accept that anything I say can and will be used as evidence to critique me.

  • Member since
    February 2004
  • From: Central Ohio
  • 570 posts
Posted by basementdweller on Monday, April 1, 2019 8:35 PM

I appreciate all the input and suggestions. Dave, thanks for hitting the nail on the head. 

What I am realizing now is the the risers are the lowest point, from there I will see where I need my road bed and set it accordingly. Just so I am clear I don't wish my roadbed to have much elevation change only the scenery, highways, and towns and around it

  • Member since
    March 2002
  • From: Milwaukee WI (Fox Point)
  • 11,439 posts
Posted by dknelson on Monday, April 1, 2019 11:00 AM

basementdweller
One look I want to achieve is having the mainline with cuts and fills, rather than just flat on the bench work, another look is having highways with more of a rolling look (even city streets climb and dip) again rather than just flat. Like one of you said it does not take a lot of room to make that elevation change. Maybe I am just over thinking it.

No no, you aren't over thinking it, not one bit.  Most layout builders come to regret not doing more to plan in advance for overall topography, particularly that which is below track level.  I thought I'd planned enough for it but soon came to see I was wrong.  It is not easy to foresee what the absolute "ground zero" is supposed to be on a layout, even a nominal "flat land/prairie" layout.  We start with the fact that most track is elevated above the land around it.  Sometimes just a few feet, sometimes many feet.  We know there are culverts below the tracks, and on most layouts the culverts are way too high, too close to the ties; we know the water goes into ditches below the culverts.  But the water in those ditches goes somewhere, too.  The ditch grains into a creek which drains into a river, and so on. I've seen layouts where the ponds or lakes or rivers are higher than the culverts and ditches.  Hmmm.

Even without water features per se, if one track goes over another, or if the track goes over a road, we (hopefully) plan for that.  But what is below that lower track or that lower road?  More culverts, more drainage ditches.  Leading to where that is lower still?  OK, we cannot model it all, but what is the absolute lowest point we want our scenery to go to so that it is realistic?  Find that (or think of that) point and plan upwards.  

I read of a huge O scale PRR railroad layout where all the track is elevated 8 (real) inches above the base it is laid on.  That seems incredibly high but in 1/4" scale those 8 inches are just 32 feet.  32 feet is not incredibly high.  Given elevated roadbed, realistic culverts and ditches (the Pennsy had very precise standards for roadbed elevation and depth of trackside ditches), the normal rise and fall of surrounding countryside, roads, even residental yards, those 32 feet get used up pretty darn fast!

The perfect time to be thinking of this is when you are staring at a blank slate.  Even if you have to compromise over and over, at least you thought about it.

Dave Nelson

  • Member since
    July 2006
  • From: west coast
  • 7,667 posts
Posted by rrebell on Monday, April 1, 2019 9:51 AM

basementdweller

I am needing to get my head around open grid bench work. My previous layout was built as a flat table with2" foam over a layer of hardboard. While I could carve ditches etc the overall effect was that it still resembled a billiard table. 

My plan is one side of the new layout is to be a yard, and I have no problem with the yard still being built as a billiard table. The switching side of the layout however, while the railroad would have minimal elevation changes I am wanting the terrain around it to be anything but flat and level. 

So I have built my bench work framing which is 1"x4"'s on edge, I think obviously I do not want to cut into those 1" x 4"'s for terrain below track level so do I add another layer of 1"x4"'s perpendicular to the frame work and then I can cut into them? obviously there needs to be support for the scenery, but carving those 1"x4"'s seems a difficult method for scenery below track level. 

Or is another method to elevate the track bed above the benchwork in some fashion similar to a cookie cutter type construction and then go with a mesh / screen or cardboard lattice to support the scenery / industries? Then it seems I had better have a solid track plan. 

I certainly realize I can blend different types of construction. I appreciate any comment and suggestions, most info I have read seems aimed towards first time model railroad builders. Thanks.

 

Why change, you want elevations, you just add more foam to build mountains, I did, in one place from bottom to top was over 3'.

  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Monday, April 1, 2019 8:17 AM

basementdweller
My plan is one side of the new layout is to be a yard, and I have no problem with the yard still being built as a billiard table. The switching side of the layout however, while the railroad would have minimal elevation changes I am wanting the terrain around it to be anything but flat and level. 

So I have built my bench work framing which is 1"x4"'s on edge, I think obviously I do not want to cut into those 1" x 4"'s for terrain below track level so do I add another layer of 1"x4"'s perpendicular to the frame work and then I can cut into them? obviously there needs to be support for the scenery, but carving those 1"x4"'s seems a difficult method for scenery below track level. 

I built all of my last layout as open grid.  You can put whatever you want on top.

Here is construction photo:

If you want the terrain to go below the track work, you simply build the benchwork at a lower elevation (legs) and use risers.  Then you can run the track from the table top directly to the risers, which are built above the benchwork at a level as needed.

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    February 2008
  • 2,360 posts
Posted by kasskaboose on Monday, April 1, 2019 7:46 AM

Batman's pictures and description is simliar to my layout.  I have the entire layout on 2" foam on top of open benchwork.  That arrangment works for me.  As others mentioned, using 2" foam provides a lot of latitude for creating elevation. 

Some might call my layout "boring" by being one elevation.  Guilty.  I much prefer smooth operations than creating a roller coaster with steep inclines/declines.

  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Sunday, March 31, 2019 7:21 PM

What you described, yard on one side on a flat table, and scenic'd area on the other, subroadbed on risers on open grid benchwork.  It works.  I recommend it.

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    February 2004
  • From: Central Ohio
  • 570 posts
Posted by basementdweller on Sunday, March 31, 2019 6:29 PM

I appreciate all the replies, photos and various comments. Each of you gave me a little better understanding of how it all works going from that open grid to the finished scenery. 

One look I want to achieve is having the mainline with cuts and fills, rather than just flat on the bench work, another look is having highways with more of a rolling look (even city streets climb and dip) again rather than just flat. Like one of you said it does not take a lot of room to make that elevation change. Maybe I am just over thinking it. Thanks again.

  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Posted by BATMAN on Sunday, March 31, 2019 2:15 PM

rrinker
If you are trying to represent a track running on a ledge blasted halfway up a canyon wall, then you want a reasonably tall riser to the track sites some distance above the canyon floor which basically can't go any lower than the open grid supporting the whole thing.

I have my canyon going to the floor.

  

 

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Sunday, March 31, 2019 2:00 PM

 Unless your layout is 100% mountains, or 100% flatland, a mix of techniques is probably the best. The track base for hilly areas is lifted up on risers, allowing scenery to freely go both above and below the track level. Do not think it terms of a solid continuous base. In general, everythign except an area wide enough for the track is left open. How high you make these risers depends on just what you have planned for the area. If you are trying to represent a track running on a ledge blasted halfway up a canyon wall, then you want a reasonably tall riser to the track sites some distance above the canyon floor which basically can't go any lower than the open grid supporting the whole thing.

 For a large flat area like a yard, it is usually easier to just lay out flat material over the area, right on the grid. And no one says all the grid has to be at the same height - you can have a section higher than the adjoining sections.

                                       --Randy


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Sunday, March 31, 2019 1:46 PM

The main level of my partially double-decked around-the-room-layout is all 1"x4" open grid, supported atop a 2"x4" structure of enclosed shelves used for storage. 
The support structure is about 31" high, while the main level's height, on risers of varying lengths, ranges between 36" and 44"....

The climb to the partial second level (the start of which is seen in the last of the photos above) is on a peninsula, also on a support structure of the same height. even though the track at its upper end is 59" above the floor.  Here's a partial view of the grade...

The now-in-place partial upper level is also on open grid, but it's a combination of 1"x4" members at the front and ends of each section, with 1"x2" cross- and rear-members.  It's all supported atop welded steel brackets, lag-bolted to the wall studs, and since I didn't want any major grades, the entire top is covered in plywood.  I'll eventually add some scenic landforms, probably using foam, to add some visual interest....

If you want scenic features below the level of your track, simply put the roadbed on risers - the track could be done all at the same height, or you could use grades, up or down, to create different various levels. 

Byron's photo illustrates the use of risers well.

Wayne

  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Posted by BATMAN on Sunday, March 31, 2019 1:21 PM

I have a little of everything on my layout.

  

  

  

  

  

With two inches of foam you can go down a fair way for streams, lakes etc. If you want something really deep you might be able to glue a second piece of foam underneath between the girders and stratigically place what ever it is to be at that spot.

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

  • Member since
    December 2001
  • From: Northern CA Bay Area
  • 4,387 posts
Posted by cuyama on Sunday, March 31, 2019 9:51 AM

Typically, the open grid framework goes below everything else, and then the plywood or foam subroadbed is supported by risers (often 1X2). IMHO, even in yard areas, short risers are helpful for levelling and providing space for wiring, etc.

"Build bridges, not tables" -- Linn Westcott

Google image search string

  • Member since
    November 2015
  • 723 posts
Posted by UNCLEBUTCH on Sunday, March 31, 2019 9:33 AM

As stated the 1X4s are your support, you don't want to weaken them.

 On my layout; I use the open grid,and 2in foam. If I cut the foam down to the 1X4 I get a <HO 14ft> drop. thats enough for ''my'' area.

On my last layout I had 2ft spaceing at spots allowing me to go lower for a longer distent.

Or you could build the foam up, add 3/4 or more, getting the track higher.Be the same as using risers.

How deep or high do you need/want it ?

  • Member since
    May 2010
  • From: SE. WI.
  • 8,253 posts
Posted by mbinsewi on Sunday, March 31, 2019 8:15 AM

basementdweller
So I have built my bench work framing which is 1"x4"'s on edge, I think obviously I do not want to cut into those 1" x 4"'s for terrain below track level so do I add another layer of 1"x4"'s perpendicular to the frame work and then I can cut into them? obviously there needs to be support for the scenery, but carving those 1"x4"'s seems a difficult method for scenery below track level. 

There should be no reason to "cut into" the risers (what you call perpendicular 1x4's).  The risers support the track bed.  The higher the risers, the deeper your scenery can be.

The area between the risers, you fill in with the screen, or foam, or whatever, to get your land profile.  You can also go higher than the risers.

Maybe do some searching around for open grid benchwork, there's lots of info and pictures.

Mike.

  • Member since
    February 2004
  • From: Central Ohio
  • 570 posts
Open grid bench work
Posted by basementdweller on Sunday, March 31, 2019 7:42 AM

I am needing to get my head around open grid bench work. My previous layout was built as a flat table with2" foam over a layer of hardboard. While I could carve ditches etc the overall effect was that it still resembled a billiard table. 

My plan is one side of the new layout is to be a yard, and I have no problem with the yard still being built as a billiard table. The switching side of the layout however, while the railroad would have minimal elevation changes I am wanting the terrain around it to be anything but flat and level. 

So I have built my bench work framing which is 1"x4"'s on edge, I think obviously I do not want to cut into those 1" x 4"'s for terrain below track level so do I add another layer of 1"x4"'s perpendicular to the frame work and then I can cut into them? obviously there needs to be support for the scenery, but carving those 1"x4"'s seems a difficult method for scenery below track level. 

Or is another method to elevate the track bed above the benchwork in some fashion similar to a cookie cutter type construction and then go with a mesh / screen or cardboard lattice to support the scenery / industries? Then it seems I had better have a solid track plan. 

I certainly realize I can blend different types of construction. I appreciate any comment and suggestions, most info I have read seems aimed towards first time model railroad builders. Thanks.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!