New poles for prototype pole lines get delivered by NS on bulkhead flats to a team track area for the local utility. Makes for an interesting load and operation twist for modelers. Questioon though. How do you model something like that. That is not dead straight and tapers in some but not others. Any ideas i have been bouncing this around for a while
Wolfie
A pessimist sees a dark tunnel
An optimist sees the light at the end of the tunnel
A realist sees a frieght train
An engineer sees three idiots standing on the tracks stairing blankly in space
Mel, great technique. I have seen the loads that the OP mentions, on some of the live cams I watch.
I've also used a battery powered drill for a lathe, for small stuff, but the drill press is an excellent idea, for "longer" projects.
Mike.
My You Tube
Have considered making some pole loads or piles awaiting distribution near the power plant. Like your idea for the wires Mel.
I have clamped my battery drill to my bench for several projects. Could use one or even a corded one to turn the dowels while sanding. (My drill press is a long way from the layout.)
Good luck,
Richard
Like Mel, I made my poles from dowel, chucked in a drill and tapered using sandpaper. Mine weren't for a pole line, though, at least not immediately.
Instead, they need to be delivered, and so, I made them into a gondola load, based on a prototype photo...
Wayne
I have a small odd shaped spot with odd requirements to make operation possible and clearences for arms and such to operate. Utility pole unloading is perfect for that spot, prototypical, and fits nicely with clearences.
wolfie