Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Modeling sidings and industrial Spurs (HO scale)

9541 views
9 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    November 2002
  • From: US
  • 2,455 posts
Posted by wp8thsub on Wednesday, November 16, 2016 10:49 PM

I often ramp down from "HO" to  "N" cork so passing tracks and industry spurs are lower.  In some cases I've also omitted roadbed under spurs entirely, installing track directly on the subroadbed for an even greater difference in height.

Here I used thinner cork for the industry track, along with smaller rail (code 55 vs. code 83 on the main).  Note also that weathering and ballast make a big difference in how the different tracks look.

From left to right in this photo of the BNSF in Lamar, CO are industry tracks, a passing siding, and the main.  Note again the differences in color, ballast texture, and sizes of rail, along with the changes in height.

This area has three different track levels, on HO cork, N scale cork, and none at all unde the Hudson Press spur.  The ramp leading down from the HO roadbed to the spur is visible at left.  I tapered it with a belt sander.  Codes 83, 70 and 55 track were used.

The same locale looked like this once it was completed.  The extra work is noticeable in the finished product, and visitors often comment on it.

Rob Spangler

  • Member since
    August 2006
  • From: Nashville, TN area
  • 713 posts
Posted by hardcoalcase on Wednesday, November 16, 2016 9:23 PM

I use the rolls of 1/8"cork sheet from Hobby Lobby for the track roadbed of sidings and yards.  I run the mainline roadbed (Midwest Cork) up to it and make the transition with a Sureform tool.  I save the resulting cork dust for landscaping and fill material.

Jim

  • Member since
    February 2013
  • From: Saginaw, MI
  • 205 posts
Posted by Bob Schuknecht on Wednesday, November 16, 2016 6:27 PM

My main line is on cork. All other tracks are on the layout surface.

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Wednesday, November 16, 2016 1:19 PM

Sidings range from, 'used every couple of hours' with spurs to all the adjacent buildings in the industrial/commercial park, to 'scruffy remains next to a business that now ships by truck.'  Obviously, two very different 'looks.'

My suggestion is to hunt up some local examples and go look at them.  A couple of hours on the public roads adjacent to the tracks should result in a camera-load of inspiration.  Supplement that with notes on rail height, ballast (or lack thereof, and what substitutes for it) ground cover...  The prototype is always the best guide.

As for how high roadbed can be stacked - here in Northeast Clark County, the UP (LA&SL) runs on a couple of feet of grey rock ballast on top of a yard-high earth embankment.  This is an area where Mother Nature has been known to deliver a year's 'average' rainfall in one twenty-minute feline and canine downpour.

Chuck (Modeling Central Japan in September, 1964 - to my own field notes and photos)

  • Member since
    August 2013
  • From: Richmond, VA
  • 1,890 posts
Posted by carl425 on Wednesday, November 16, 2016 1:16 PM

I use the Homasote roadbed from Cascade Rail Supply.  They have 18" and 12" scale thickness and transition pieces available.  I use the 18" for mainline, 12" for passing sidings, and industrial tracks are laid on the ground.

I have the right to remain silent.  By posting here I have given up that right and accept that anything I say can and will be used as evidence to critique me.

  • Member since
    June 2007
  • 8,892 posts
Posted by riogrande5761 on Wednesday, November 16, 2016 8:03 AM

What they said!

Rio Grande.  The Action Road  - Focus 1977-1983

  • Member since
    March 2002
  • From: Milwaukee WI (Fox Point)
  • 11,439 posts
Posted by dknelson on Tuesday, November 15, 2016 8:56 PM

As a rule sidings are at a lower level than the main (in part to prevent cars from rolling from siding to main).  So slightly lower siding, which can be done with using N scale sized roadbed versus the main.  Also, smaller rail.  Minimal to no ballast.   Weathering the sides of rail more on a siding; more vegetation on the track and between ties.  Wider tie spacing which can be done with flex track by removing a tie or two every six inches and then spreading the remaining ties out.  

Not often modeled but sidings with sharp curves often feature gauge rods which hold the rails together where they otherwise might be spread apart.

Dave Nelson 

 

  • Member since
    July 2006
  • From: Huntsville, AR
  • 1,251 posts
Posted by oldline1 on Tuesday, November 15, 2016 8:52 PM

Use a smaller code rail on the sidings along with the N scale cork.

Roger

  • Member since
    July 2006
  • From: Sebring FL
  • 842 posts
Posted by floridaflyer on Tuesday, November 15, 2016 8:47 PM

I would use N scale roadbed or no roadbed at all for the sidings. 

  • Member since
    September 2008
  • 216 posts
Modeling sidings and industrial Spurs (HO scale)
Posted by NILE on Tuesday, November 15, 2016 8:41 PM

I am probably moving within a year, which means a chance to build a new layout.   I think I would like to work on my track work.  I would like my sidings and spurs to look less used then the main line.  I have read about a few techniques on how to model this, one of them uses double layer of cork on the main.  That seems to put the track high off of the table.  What suggestions do you have?

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!