Login
or
Register
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Home
»
Model Railroader
»
Forums
»
Layouts and layout building
»
Hand laid or pre-made track?
Hand laid or pre-made track?
1297 views
7 replies
Order Ascending
Order Descending
bsteel4065
Member since
January 2001
From: United Kingdom
552 posts
Hand laid or pre-made track?
Posted by
bsteel4065
on Thursday, November 25, 2004 1:25 PM
So, after learning from all your mistakes in building your last layout.... What would you do next? Hand build your track or buy pre-made and lay? I've always used Peco and I'm considering the new US Code 83, (sorry guys, but the current dollar rate means it's cheap for me in the UK) but I've got this haunting feeling that I should try to hand lay on my next layout.
Does anyone wi***hey had built their own or does anyone wi***hey had bought ready made? Which looks the best? Is it worth the hassle?
[8)][:)][^][V]
Reply
SteelMonsters
Member since
November 2003
From: Michigan
227 posts
Posted by
SteelMonsters
on Thursday, November 25, 2004 3:35 PM
The problem with handlaid track is that it is not as detailed as most flex track. Not only that, it is also more difficult to lay and do superelevated track and so forth. The major advantage is that you can form turnouts and crossovers to your track design as opposed to designing your trackplan around premade turnouts and crossings.
The number of people that handlay track is going down with time, to easier and usually more realistic flextrack.
-Marc
Reply
CP5170
Member since
October 2009
129 posts
Posted by
CP5170
on Thursday, November 25, 2004 4:11 PM
I am in the process of designing a new layout. On the last one, I handlayed a turnout and was quite pleased with the results. I am seriously considering handlaying all the turnout so that I can get the flow that I want. I will use flex-track for the rest.
Hope this helps...Ken
Reply
ericboone
Member since
January 2002
From: Minnesota
659 posts
Posted by
ericboone
on Thursday, November 25, 2004 8:47 PM
If you want detailed handlaid track, goto www.proto87stores.com. They sell photoetched tie plates and all of the other parts necessary for realisticly detailed handlaid track and turnouts. I am strongly leaning towards this route, mainly because I would like to do finescale trackwork, but it would work for standard trackwork too. I may still use Micro Engineering flex track though.
Reply
mcouvillion
Member since
August 2003
From: Northeast Houston
576 posts
Posted by
mcouvillion
on Friday, November 26, 2004 12:20 AM
bsteel4065,
I guess it depends on what is important to you and how much track you intend to lay. Hand-laying, to me, seems awful labor-intensive, especially for a large layout. If you want to do some for the experience, or to say that you did it, great, do it in a highly visible area of your layout and use ready-made on the rest. Do you prefer to go through the motions of building the layout for an extended period or do you want to run trains? I prefer to run trains, so I'll go with the best ready-made track I can afford. I learned how to hand-lay turnouts quite a few years back. OK, now I can say that I did it, but I sure would not want to do the whole railroad. Maybe a special switch that I can't purchase, but it would be the exception.
Whatever you decide, it's still your railroad!
Mark C.
Reply
Jacktal
Member since
October 2002
From: City of Québec,Canada
1,258 posts
Posted by
Jacktal
on Friday, November 26, 2004 4:12 PM
Although I admire the dedication and skills of those who do handlay their trackwork,I wouldn't even think about it unless I had a very special layout design problem that absolutely required this solution.Building and detailing a layout is already so time consuming that I'd like to have some spare time left for operations.
Reply
IRONROOSTER
Member since
June 2003
From: Culpeper, Va
8,204 posts
Posted by
IRONROOSTER
on Friday, November 26, 2004 7:37 PM
I have done some handlaying. While it is fun to do, it takes longer and with today's track products IMHO I don't think it looks better. Surprisingly, it costs about the same (more if you use tie plates) than using a quality flex track such as Shinohara. You can shade the cost factor in favor of handlaying if you only spike every 5th or 6th tie (which doesn't look prototypical), make your own tie plates from thin plastic sheets (or omit them), and/ or glue the rail to the ties and paint the spike heads on the rail.
Turnouts are a different story, here you can save money by making your own even with commercial tieplates.
The real question is how much hobby time do you have and how to you want to spend it?
On my current layout (S scale), I am using Shinohara code 100 track and turnouts. I plan to hand lay some code 83 sidings for the contrast (code 83 is not available in S).
Enjoy
Paul
If you're having fun, you're doing it the right way.
Reply
Anonymous
Member since
April 2003
305,205 posts
Posted by
Anonymous
on Saturday, November 27, 2004 12:18 AM
I'd do pre-made on mainline and branchline service. Hand-laid for some branchline, industrial, logging and mining operations as these ties usually had a wider spacing and are sometimes not as uniform. Also it depend on what part of the scene the track plays. The work of hand-laid in a multi-track freight yard would get lost so would be an effort best restricted to the turnouts if used at all. The track would have more of an impact for the logging, industrial and mining layout.
Reply
Edit
Subscriber & Member Login
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Login
Register
Users Online
There are no community member online
Search the Community
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter
See all
Sign up for our FREE e-newsletter
and get model railroad news in your inbox!
Sign up