Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Two track ballast edge?

3767 views
11 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2010
  • 126 posts
Posted by grinnell on Saturday, February 8, 2014 1:07 AM

I've had trouble operating on some other layouts where it is hard to determine which track is the "siding". I have a hard time seeing the difference between code 83 and code 70 rail or if the roadbed was slightly depressed (except in photographs). A schematic diagram on the fascia or in a timetable would work, but it requires guest operators to find and read the instructions (a map in this case). It may or may not be prototypical, but on my layout if the dispatcher says "take the siding", you'll know to head for the cinders.

It turned out that once I had the dark ballast firmly glued down and dry on the siding, it was not a big deal the next day to use a brush to remove stray bits of lighter ballast that had wandered over the dark before gluing down the lighter ballast on the main.

Grinnell

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Friday, February 7, 2014 6:36 PM

[quote user="mactier_hogger"]

 

BroadwayLion

Passing sidings should be built to the same specs and ballast as the mane lion.

 

I agree. Here in Northern Ontario the sidings and the mainline are ballasted with the same slag.

/quote]

 

And I disagree.  When I lived in Peagram, TN, I watched a CSX MW crew reballast and realign the track passing through town - the MAIN track.  The siding, except for the hundred feet or so from the turnout frog to the clearance point at each end, got a look, a lick and a promise.  The middle 95% of the siding is at least a foot lower than the main and ballasted with a different grade of stone, so I doubt that it's been maintained to mainline standard any time recently.

OTOH, my prototype maintained both tracks to the same standard at places where one track became two tracks.  Since the paired tracks were operated directionally (and connected at the ends by spring switches) neither was a 'siding.'

Chuck (Modeling Central Japan in September, 1964)

  • Member since
    December 2008
  • From: Bracebridge, ON
  • 235 posts
Posted by mactier_hogger on Friday, February 7, 2014 5:19 PM

BroadwayLion

Passing sidings should be built to the same specs and ballast as the mane lion.

 

 

I agree. Here in Northern Ontario the sidings and the mainline are ballasted with the same slag.

Dean

30 years 1:1 Canadian Pacific.....now switching in HOSmile

  • Member since
    July 2006
  • From: west coast
  • 7,656 posts
Posted by rrebell on Friday, February 7, 2014 1:06 PM

My way is a bit different. I first paint a line of white glue approx where I want the ballast to end and add ballast (started doing this more for the turnouts). Once dry I vacuum up the excess and then put in the ballast and matt medium it with a pipette. I then vacuum up the excess and then lay in anything I want like plants or stray colors along with other scenery near the mainline and a the same time fix any edging that needs a bit more and then do a matt spray (left out the details of wet water etc for a shorter post). Some of this may seem like extra work but you end up with a groomed main.

  • Member since
    November 2002
  • From: US
  • 2,455 posts
Posted by wp8thsub on Friday, February 7, 2014 1:03 PM

BroadwayLion
Passing sidings should be built to the same specs and ballast as the mane lion.

That's highly variable.  For my prototype, sidings were mostly lower than the main, and usually had different ballast.  Sometimes it was the same color as the main, but finer material that didn't drain as well.  In others it was completely different.  Speed restrictions on sidings are usually much lower due to the quality of rail, ties, roadbed etc.  Industry and other company tracks are often rougher still.  Modern sidings on heavily traveled routes can be built to higher standards, as BNSF in ND like you cited.

Rob Spangler

  • Member since
    July 2006
  • From: North Dakota
  • 9,592 posts
Posted by BroadwayLion on Friday, February 7, 2014 12:26 PM

Passing sidings should be built to the same specs and ballast as the mane lion. Sidings into wayside businesses and industries are usually of lower quality. This of course does not always hold true. The Bakken Oil Express terminal is fully heavy weight and as well ballasted as the main line. Ditto the sidings at the Ethanol plant in Richardton, but the ballast and color is different since it was put in by a different contactor and the stones came from a different source.

 

ROAR

The Route of the Broadway Lion The Largest Subway Layout in North Dakota.

Here there be cats.                                LIONS with CAMERAS

  • Member since
    July 2004
  • From: Weymouth, Ma.
  • 5,199 posts
Posted by bogp40 on Friday, February 7, 2014 12:21 PM

You've been given great ideas to accomplish this.  The critical part to make the scene more realistic and appealling is how the mainline gray ballast "feathers" along the division between the two tracks. This may be a bit more trial and error to suit the look you desire. Many times, I as well as others have done this in a close proximity as finishing off the change, only to have to touch up places so not to create such a sharp contrast between the two.

Lay the darker cinder on the siding but allow to extend to the main, then ballast the mainline. Set/ glue at this time and don't worry about the stray mainline grains at this point. After dry, go back and add (even if done by minute pinches to drop ballast) to get that feathered/ scattered look. Keep looking at different angles and distances for the look you like. If too much happens to get placed and not happy, just vaccumn up and do again. Then secrure it down.

Not as much contrast to dark cinder you're doing, but shows difference to less or little used/ maintained sidings.

During final scenery  touch up, ballast and ROW done w/ staining between rails, weeds and fresh ballast. Some spots are done a few times (diamond/ junction ballast not decided at this point) some want differt other don't- so it stays bare for now

Modeling B&O- Chessie  Bob K.  www.ssmrc.org

  • Member since
    March 2002
  • From: Milwaukee WI (Fox Point)
  • 11,439 posts
Posted by dknelson on Friday, February 7, 2014 10:35 AM

Visually, you are more likely to see stray ballast from the main show up here and there on the siding than you would be to notice any stray cinders on the main.  Another reason to do siding first, then main line and not get too hyper about a few grains of mainline ballast ending up near or on the siding.

Dave Nelson

  • Member since
    July 2010
  • 126 posts
Posted by grinnell on Friday, February 7, 2014 10:21 AM

OK, I'll press on. Those are nicely done scenes, good contrasting ballast types.

Grinnell

  • Member since
    July 2006
  • From: Central Vermont
  • 4,565 posts
Posted by cowman on Thursday, February 6, 2014 4:52 PM

I think you are on the right track (pun intended) with doing the siding first.  I think that the the siding would receive less maintenance and the reballasting of the main would occur more  often, so it would drift onto the secondary ballast.  Don't see a need to apply it differently, as stated above, they do get mixed on the prototype when they are side by side.

Have fun,

Richard

  • Member since
    November 2002
  • From: US
  • 2,455 posts
Posted by wp8thsub on Thursday, February 6, 2014 3:57 PM

I just do all the ballast at once.

For my prototype and era, the dark smelter slag ballast was used on the main with other materials elsewhere.  Sometimes a finer grade of the same dark mainline ballast was also used on passing sidings.  Between the main and industry track at right there is some overlap of the two types into each other, as typically occurs due to maintenance and switch crews walking through the stuff.

Here's another location with different types of track usage side-by-side.  There are long stretches where two or more colors meet, and I mostly let the ballast end up wherever I deposit it using a spoon.  Here and there I may reapply one color or the other to make a neater edge, although I'm modeling the era of machine maintenance where ballast margins weren't as tidy as in earlier times.

Rob Spangler

  • Member since
    July 2010
  • 126 posts
Two track ballast edge?
Posted by grinnell on Thursday, February 6, 2014 3:18 PM

I'm using a light gray ballast for the main line and dark cinders for the yard and industrial tracks. Now I'd like to do a passing track with cinders on the siding and lighter ballast on the main. I'm looking for techniques for applying the two different colors along the long edge between the two tracks.

My initial thought was to apply the cinders to the passing track and let dry. Then brush on the glue (matte medium) to the adjacent slope for the main line. Maybe use it full strength so it is less "runny" and less likely to wick up on the dark ballast side?

How do you all handle this?

Grinnell

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!