Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

My 8x8 HO Shelf layout...

31262 views
50 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    February 2002
  • From: Reading, PA
  • 30,002 posts
Posted by rrinker on Sunday, November 16, 2014 6:27 PM

 The site they were linked from has decided to stop allowing people to link images to other sites since it uses up their bandwidth. And you need to have a facebook account to see the others. The OP would be best off creating a Photobucket account and storing his pictures there. Then he could link them to any forum he would like.

                          --Randy


Modeling the Reading Railroad in the 1950's

 

Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.

  • Member since
    March 2010
  • 10 posts
Posted by beezer on Sunday, November 16, 2014 5:56 PM
was not able to access your attachments - all I get when I click on the X' is FORBIDDEN YOU DO NOT HAVE PERMISSION TO ACCESS THIS SITE Help !
  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Thursday, November 13, 2014 7:14 PM

Sorry but it looks like my pictures are not linked ot my thread anymore. Feel free to view my layout pictures at my Facebook Page. Thanks!

https://www.facebook.com/pages/JustN2Trains/1419173361683750

  • Member since
    January 2010
  • From: Chi-Town
  • 7,707 posts
Posted by zstripe on Wednesday, January 15, 2014 9:06 AM

Big Smile   Just for the record: In the Chgo area they also use the walking floor trailers for hauling garbage out to a dump site in Ind. A good friend of mine drove for an outfit and that is all they used them for. He used to talk about that floor all the time, about hydraulic fluid leaking, they were driven by pumps with a tank on the back of the tractor. Havn't thought about that guy in year's until I read this thread. Yes

Frank

  • Member since
    January 2014
  • 26 posts
Posted by slow-n-low on Monday, January 13, 2014 11:51 AM

hey man just to put your mind at rest they do use those trailers to haul grain... i used to haul grain with a hopper bottom and seen lots of the tall walking floors in feed mills... your doing a great job. and you put my mind at reat with your bridge. i to need to do this on my layout to give me some space to enter the room my layout is in. i thought about doing what you did with bridge so i dont have to duck under a 2 to 3 foot part of my layout and a lift out bridge would not work. but wasent sure if a small bridge would work.. now for a quiston what did you use for your  face bored on the layout

  • Member since
    October 2002
  • From: gig harbor, wa
  • 193 posts
Posted by GGOOLER on Friday, January 10, 2014 12:02 PM

its coming along real nice justin. i need to make a trip up to play on your layout for once, real soon here.

later

g

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 1:02 AM

I also picked up a new Semi for my grain elevator....I not sure it would be used for grain but more for wood chips...oh well.

Trucks N Stuff HO SPT3046 Peterbilt 389 Sleeper with Walking Floor Trailer, Joe Olson

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 1:00 AM

The Dremel makes for a super quick and clean cut.

 

I just used some self tapping screws to mount the UP5.

 

I also got a UT4 in the mail as well.

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:57 AM

Got two UP5's in the mail today...pretty excited...lol.

 

I don't have the facia on this piece of bench work yet but wanted to get it up and running. The hole needed is 1.5"H x2.5"W.

 

I used a Dremel MM20-03 to cut out the pocket, worked out really well.

 

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:53 AM

I also picked up BNSF yard tractor(Athearn) and a FJ40(forget what brand).

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:52 AM

Picked up an new Athearn covered hopper and TTX boxcar.

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:50 AM

Quick view on how I braced the radius.

 

View of my my wiring, I put a ziptie around the blue connector...I just didn't have one installed in this picture.

 

I nail in some hangers to keeping the wiring up and tight.

 

I will be adjusting the yard section a bit...I will make the right track isolated from the mainline so the yard switcher can move cars around and have the mainline clear.

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:46 AM

The height of the facia is 5.2, it gets a little thinner when it hits the bridge.

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:43 AM

I got some facia up and some track weathered.

 

I know, I used a few screws...lol.

 

On the bridge, the facia sits a little higher....incase of people bumping the bridge and causing a derailment or etc.

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:38 AM

hon30critter

Very interesting to follow your progress, and you have certainly made a lot of progress since your first post 10 days ago. Everything looks great!

Thanks for sharing.

Dave

 

Thanks! I haven't done all the work in the 10days...I have been working on this layout for about 2months. :)

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:37 AM

Kyle

Great work, it looks amazing!  I am planning on building a 8 x 2 switching layout.  It will be two 4 x 2 modules.  I am hoping to start track planning this week.  Thanks for the inspiration.

 

Wow, thanks a lot! Good luck on your layout! :)
  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Friday, January 10, 2014 12:36 AM

SWFX

Nice work and progress. Have you had any issue with the track and road bed bending or coming undone once applying the ballast because of the white glue?

 

Thanks! As for the track and road bed coming up after the glue....I don't add to much 50/50 glue/water mix, more the fact I don't want it dripping on the carpet..lol.
  • Member since
    July 2006
  • From: Bradford, Ontario
  • 15,617 posts
Posted by hon30critter on Monday, January 6, 2014 1:29 AM

Very interesting to follow your progress, and you have certainly made a lot of progress since your first post 10 days ago. Everything looks great!

Thanks for sharing.

Dave

I'm just a dude with a bad back having a lot of fun with model trains, and finally building a layout!

  • Member since
    September 2013
  • 918 posts
Posted by Kyle on Monday, January 6, 2014 12:24 AM

Great work, it looks amazing!  I am planning on building a 8 x 2 switching layout.  It will be two 4 x 2 modules.  I am hoping to start track planning this week.  Thanks for the inspiration.

  • Member since
    December 2011
  • 112 posts
Posted by SWFX on Saturday, January 4, 2014 12:05 PM

Nice work and progress. Have you had any issue with the track and road bed bending or coming undone once applying the ballast because of the white glue?

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 11:14 PM

Started on the ramp for the gravel road to the grain elevator....doesn't have to be too fancy....it will just get ballest on top of it later(just needs a sanding and maybe another coat of joint compound).

 

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 11:13 PM

Got the gravel parking lot at bit done in the scrap yard.

 

This will be a small mechanic shop.

 

 

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 11:11 PM

Doing some testing on the mainline.

 

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 11:10 PM

Few more shots of the dirt road.

 

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 11:08 PM

Got started on the road, and did some testing on the scenery.

 

I wanted to do something different for the access road to the Grain Elevator. Thoughts on the colored rock for the dirt road? Look ok?

 

Here is what I used for the dirt road, on the side of the road I just used dirt from the back yard.

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 11:07 PM

Few more views of the bridge.

 

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 11:01 PM

Few shots of me figuring out the road to the flour mill....the grain trucks will have their own dirt road that comes off this paved road.

I am going with a 2.8" wide road.

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 10:59 PM

This section will be a BNSF maintenance facility, holding gondolas, heavy equipment and extra stock.

 

 

  • Member since
    December 2013
  • 39 posts
Posted by JustN2Trains on Wednesday, January 1, 2014 10:58 PM

Here is the new location of the Grain Elevator.

Where the four covered hoppers are, there will be a Walthers HO 933-3026 Red Wing Flour Mill Kit

 

 

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!