Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Turtle Field Railroad N scale Layout.

33320 views
99 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2010
  • 161 posts
Posted by dexterdog on Saturday, July 26, 2014 7:50 AM

Wow, excellent work Bubule!

  • Member since
    June 2011
  • From: Loveland, Colorado - Rural
  • 366 posts
Posted by rgengineoiler on Saturday, July 26, 2014 8:19 AM

Fantastic work Jean.  I hope my new build will look as beautiful as what you have shown all of us on the Forum.  You have given me a benchmark to progress too.  Wow!   Doug

  • Member since
    August 2006
  • From: Saskatchewan
  • 2,201 posts
Posted by last mountain & eastern hogger on Saturday, July 26, 2014 12:05 PM

Whistling

Hi Jean,

Very impressive modelling. I've really enjoyed all your pics and videos especially the CZ, wonder why ?

Your attention to detail is amazing and the work you did inside the truck terminal is fantastic especially when you realize it is in "N" scale. Then your rock mold work is real eye candy....

Keep up the great work and make yourself a regular here , I look forward to your further postings.

Johnboy out........................ Long live the CZ....   also glad to see you have some Western Pacific power on your layout.

from Saskatchewan, in the Great White North.. 

We have met the enemy,  and he is us............ (Pogo)

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Sunday, July 27, 2014 4:37 AM

Many thank's for the nice comments ! Embarrassed

 

 

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Monday, July 28, 2014 12:13 PM

hello !

Here is my lastest work : A F40PH D&RGW on a Call train kato base :

I have not found the correct "Ski Train" side logo, so i put smaller one. It does not have great importance for me. Geeked

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Tuesday, July 29, 2014 10:55 AM

Here is the diesel in action : Pulling the Ski Train on the Turtle Field

 

watch?v=g3GExcrTQbw

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Monday, August 11, 2014 1:36 PM

Hello all !

 

 Here is a new video staring double stack Kato & Deluxe Innovation :

 

watch?v=zq77aqpz1Gk

 

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Friday, August 15, 2014 4:30 PM

Hello all, so many thank's to you guys !!

 

I have bring back my tools in hands this week and i have stared a new project. It's a factory to fit the zone of the double briges.

 

The factory is full scratchbilt in 1mm thick carboard. The protoype that have inspired me is the Gates Rubber Co. in denver.

Of course my version will be much smaller, and have a quite different shape !!

 

Here is the first piece cuted since 1 year :eek::

 

 

This piece have been fitted with doors and windows from Ticchy train group.

Metal boarning is from evergreen :

 

 

Here is the inside view of the building, Corners are reinforced with sqare wood parts  :

 

   

 

Here is the building fully putted toger, ready for paint job :

 

 

 

To be continued, see you soon folks !:guitar:

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Wednesday, August 20, 2014 4:26 PM

Here is the first building of Gates Rubber factory painted and weathered :






Here is the prototype witch inpire me :

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Sunday, August 24, 2014 5:39 AM

Hi guys ! Painting job is nearly finished  :









Now i need to built the roof and technical equipments : Hvac, pipes, air and water tank ventilator ... And more.

So to bee continued

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, August 24, 2014 12:05 PM

Jean-Francois - you are certainly one of the most skilled model builder I have come across! Mind you, this is N scale! Keep those pictures coming!

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Thursday, August 28, 2014 1:08 AM

Thank you sir ... Embarrassed

 

Hello guys !

I am waiting for some scratch building supplies to go forwar on the "spirit of denver" modules, so i will do a little flash back on the construction of some scenery elements on the Turtle Field part to wait ! :o

First i propose you a zoom on the S. GONZLES speed towwing and repair garage. It is the place to repair or feed in fuel all rolling vehicules in the Turtle field town.

To make the gas tank i used a tank rail car. I have remove chassis an made with plastic a retention. I also scratchbuilt the pump and brass pipes. The valves are comming from the tank car :

  







The primer from alclad II have been sprayed with an air brush :




I choose to affect the garage to the texaco gas supply company (love the star logo). I have paint with mask the white circle :



And now applying the mask of the star and painting the red, So the star will stay white  :



The retention have been painted in concreate and some whethering done :





I will post some more details on the construction of the S. Gonzales  Building.

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Sunday, August 31, 2014 4:56 AM

Thank's !




To continue on the S. Gonlales Speed towing garage (Arriba, Arriba ! Ay caramba grosso mineto !  ;) )  , i will show you the contruction of the junk yard behind the garage.

I have wheathered some cars and trucks for it. i have used a decoration paint with two componements. One is an iron charged paint, the second is an oxidizer paint to transform the iron in the first paint into rust. Transformation take a day and is is a natural process you did not know how it will bee before realizing the process ... The result is surprising :

  







Here they are in place on the layout :



The garbage dumpster, and the loading dumpster mecanism of the Ford truck are scratch built.

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, August 31, 2014 7:54 AM

My eyes must be deceiving me. You are doing unbelievable work in N scale, Jean-Francois! I wish I had your talent and skills!

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Sunday, August 31, 2014 8:31 AM

Thank you so much Ulrich.Embarrassed

I have just seen that you were modeling Japanese prototype. I have just puschase a tomytec T100 japanese tram to design my RDT ligth rail line for my layout. ( will help me for design radius, ramps and gauge).

I have bring the decision to built a part of Denver ligth rail on my layout when Kato/lemke announced theyre Bogestra DüWag in n scale :

It will be a good base to built RTD siemens SD100 or SD160. I have mailled Lemke The Model will be availabe in mid 2015 :

So for the testing of the RTD ligth rail line, i have purchased a tomitec T101. The video is in french but you can see the model, replacement of false chassis by motorised chassis, the digitalisation pocess and at 13min30 you can see the test on my layout ... amazing slow speed performance with the digitrax DZ 123 decoder :

 watch?v=ner458ryYc&list=UUdiu8Syl5wuLnXd59tBtiqA

 

  • Member since
    July 2006
  • From: Central Vermont
  • 4,565 posts
Posted by cowman on Sunday, August 31, 2014 6:38 PM

Jef,

Beautiful layout and very nice videos.  It had been a l ong time since I stopped in with the first comments, because, though I had seen the thread come up again and again, I knew I had visited it and did't check back.  My loss, you  have added much to it since then.

I wonder if more folks would see your great work if you posted it on the WPF (Weekend Photo Fun), as there are those who might not check in to a thread with just the name of the railroad on it.

Just a thought.  Beautiful work, keep posting it somewhere, as it is obvious those of us who have found it are enjoying it very much.

Have fun,

Richard

  • Member since
    October 2001
  • From: US
  • 973 posts
Posted by jmbjmb on Monday, September 1, 2014 1:46 PM

Stunning, your craftsmanship is absolutely stunning.  Love the short painting lesson on how you did the Texaco star.

 

jim

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Sunday, December 21, 2014 5:39 AM

Hello all,

A friend of mine (Bernard FABRON) comes today at home to test his Kato Mikado Eqquipped with a Micro V4.0 ESU loksound decoder.

Here is some views of the installation :

Bernard have drilled the Tender chassis to allow the sound to go out.





Here is the wiring of the locomotive, motor have been isolated :





Details of the 3 poles micro plug:





The suggar cube speaker :





The decoder in the tender :





Here is a video of the test on the Turtle Field Railroad :

 



Seen ya !!

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Sunday, December 21, 2014 6:10 AM

Hello all !

I have started the construction of the RTD ligth rail line juste behind my future Engine Facilities.

First part of the line a 25" long and curved bridge. The ligth rail run above and pass over the turnning triangle.
It's a two track bridge. It is fully scratchbuilt in styrene card and tripes.

First i have bent the I beam and sticked them on the base (cutted in one piece in styren sheet) :





Here is my prototype inspiration :



The second part is to made the poles. Poles are pairs big square bars sawed, sticked togever, Filled, mastiquated an sanded :





A tube for the pole :



Slater hand-rail and styren walkway complete the upper part :



The scratch built abutment :





The line with paltform of the future elevated station under construction :



To be continued ....

  • Member since
    December 2010
  • 161 posts
Posted by dexterdog on Sunday, December 21, 2014 10:01 AM

That is some outstanding work. You seem to be a very meticulous craftsman, all the more impressive seeing as you model in N scale! I am looking forward to seeing more of your light rail project as it progresses!

Merci beaucoup, joyeaux Noel et bonne annee!

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Friday, March 27, 2015 3:54 PM


 Hello all.

Today i am starting a new project : A glass and steel building

To start the construction a was needing  ...  tinted glass.

After two week of research, i have found the way to do that :  tinted glas film for tunning cars applyed on clear styrene sheet from evergreen.

Quite simple when you have found this way but some technics needed to aplly the film. Glad if the Tip can help someone.

Here is a video of the tip. Sorry it's in french but you will see clearly how it work's :




I also have made an acces rampe in styrene for the tramway station :





To be continued ...

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Sunday, March 29, 2015 8:49 AM

An overall view of the layout :

And the main face of the glass building :

 

  • Member since
    July 2006
  • From: west coast
  • 7,670 posts
Posted by rrebell on Sunday, March 29, 2015 9:42 AM

This is the finest N scale layout I have ever seen!!!!!!!!!!!!  You have got to be one of the top 1% in that scale.

  • Member since
    April 2012
  • From: Denver, CO
  • 771 posts
Posted by middleman on Sunday, March 29, 2015 10:25 AM

I very much enjoyed the video,and look forward to seeing more.You're doing a great job of capturing the look of Denver's light rail.

Thanks for posting.

Mike

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Monday, March 30, 2015 12:58 PM

Many Thank's these comments comes directly to my hart ! Embarrassed

Today some views of the construction of the main face of the glass building. It is the lighter structure whitch hold the windows. An heavier will comme later to hold the entire building.

I start to realise to templates symmetrically opposed to create the structure. Here is the putting togever of the square of .080 :



Here is the putting togever of the I beams of .080 :



Here is the putting togever of the square of .030 whitch are in contact to the glass:



Here is some details :

 

  • Member since
    October 2007
  • From: Fullerton, California
  • 1,364 posts
Posted by hornblower on Tuesday, March 31, 2015 5:35 PM

Jean-Francois

Very nice modeling work and your videos are quite nice, too.  I just wish I could get my son, Jean-Paul, interested in model railroading. Keep up the great work!

Christopher Jean 

 

Hornblower

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Monday, April 6, 2015 3:20 PM

Thank you Embarrassed

Here is the construction of the base of the building: the base has got 2 levels with a ramp and a stair between the two.
It's realized in 2mm thick styrene sheet for hardness.



The future concrete is engraved with wide rectangles at 45° of angle.



Realization of the stairs. Stairs are difficult to realize because the size of the steps need to be very precise to looks good. Here the steps are adjusted at 1/10th mm:





  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Saturday, April 25, 2015 1:47 AM

I just have finished the basement of the new building. It's take three weeks and 100 hours of work to put together and engrave the 179 pieces of this model.

It's in french, but you will see the globality of the basement. I think it is a better way to present this basement with a video because this model have a quite complex shape. It's HD720p so you can watch it on utube in full screen.
hope you will enjoy it.

 

  • Member since
    May 2013
  • 67 posts
Posted by Bubule on Saturday, May 2, 2015 1:42 PM

The first face of the building is now putted-togever and painted :

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!