Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Blueline M1a derailing.

1217 views
13 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2006
  • 3,312 posts
Posted by locoi1sa on Saturday, May 8, 2010 10:09 AM

  Big hammer, Chain saw, duct tape, wire coat hangers, and a 250 amp welder will fix just about anything. (Does replacing the destroyed parts count as fixing?)

    Pete

 I pray every day I break even, Cause I can really use the money!

 I started with nothing and still have most of it left!

  • Member since
    May 2008
  • 4,612 posts
Posted by Hamltnblue on Saturday, May 8, 2010 8:41 AM

 I do keep several sizes of hammer to match the job, it isn't just random Big Smile

My other favorite is the Sawsall. 

Springfield PA

  • Member since
    July 2004
  • From: Carmichael, CA
  • 8,055 posts
Posted by twhite on Friday, May 7, 2010 7:00 PM

hamlton:

Congratulations on your rather unique problem solving.  If it had been me, I would have immediately blamed the locomotive, packed it up, sent it back to the Mfgr and said "IT'S BROKE!  FIX IT!" 

Well, not really, LOL!  Tongue

But it's funny how those little Track Gremlins suddenly decide to appear, isn't it?   I had that happen in my engine terminal this spring.  The track has been there for eight years and suddenly I seemed to have a 'hump' yard, the latter part of last month.  Right now, I'm in the process of re-laying half of the track and realizing that the language some of my high school students use really has a PURPOSE!  

Shoulda thought about that hammer of yours, LOL! 

Tom Big Smile

  • Member since
    March 2007
  • 2,751 posts
Posted by Allegheny2-6-6-6 on Wednesday, May 5, 2010 11:43 PM

 I can honestly say that I don't even have a BFH in my model trains tool box. I have had similar situation with turnouts like that before and those tow little guys one on each shoulder keep showing up. Hit it with a really big hammer, no take it up and fix it right. BIG HAMMER-NO FIX IT RIGHT! I have come to realize if it's something from the Rube Goldberg School of engineering it's usually not a good idea to be sued on a model railroad

Just my 2 cents worth, I spent the rest on trains. If you choked a Smurf what color would he turn?
  • Member since
    May 2008
  • 4,612 posts
Posted by Hamltnblue on Monday, May 3, 2010 9:08 PM

 The track in question was ballasted but I think that the entire section was built since I last ran any steam. Either way I see it as a bent piece of metal that needed straightening. I consider it straightened for now anyhow. I love this hobby. Big Smile

Springfield PA

  • Member since
    July 2006
  • 3,312 posts
Posted by locoi1sa on Monday, May 3, 2010 8:43 PM

selector
Nothing moves....ever.

 

  That 20 pounder will get it to move! Mischief

       Pete

 I pray every day I break even, Cause I can really use the money!

 I started with nothing and still have most of it left!

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Monday, May 3, 2010 8:16 PM

It wouldn't have been my first resort unless I were thoroughly cheesed off and had run out of ha-ha. 

I have either lifted the affected areas and shimmed when I have detected a dip in one rail (usually a new engine does that for me), or I lift the rail slightly and run a small file up and down and sideways for about 10 swipes before I restore the ties down to ground level. 

However, I ballast my tracks, and I find they don't move....period.  They are ballasted after being held in place by a thin layer of latex caulk atop their spline roadbed.  Nothing moves....ever.

-Crandell

  • Member since
    May 2008
  • 4,612 posts
Posted by Hamltnblue on Monday, May 3, 2010 5:50 PM

 Yeah and flying ballast.  My "repair" isn't even noticeable.  I learned to fix things that way in the Navy.

Springfield PA

  • Member since
    July 2006
  • 3,312 posts
Posted by locoi1sa on Monday, May 3, 2010 4:57 PM

 Rich.

 SRY didn't think the sledge would allow constant running. I think it works better on the point to point layouts. Instead of plug and play we can say swing and swear. Just be mindful of whats over your head when you swing! Watch out for ricochets too.

  Pete

 I pray every day I break even, Cause I can really use the money!

 I started with nothing and still have most of it left!

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,280 posts
Posted by richhotrain on Monday, May 3, 2010 4:12 PM

locoi1sa

 If that don't work get a bigger hammer! I was swinging my 20lb sledge on the crusher last week. I must be getting old. I could only get 5 or 6 hard whacks and had to rest a minute before swinging again. I am thinking 1 good one on your layout would take care of all its problems. Just remember one thing. If force wont do it, heat will. Everything yields to heat.

Mischief

       Pete

Pete,

Several weeks ago, when you told me to "fix the hump", you didn't mention the 20 lb. sledge.  That would have cut my repair time from 8 hours to 8 seconds.  Grumpy

Rich

Alton Junction

  • Member since
    July 2006
  • 3,312 posts
Posted by locoi1sa on Monday, May 3, 2010 3:46 PM

 If that don't work get a bigger hammer! I was swinging my 20lb sledge on the crusher last week. I must be getting old. I could only get 5 or 6 hard whacks and had to rest a minute before swinging again. I am thinking 1 good one on your layout would take care of all its problems. Just remember one thing. If force wont do it, heat will. Everything yields to heat.

Mischief

       Pete

 I pray every day I break even, Cause I can really use the money!

 I started with nothing and still have most of it left!

  • Member since
    May 2008
  • 4,612 posts
Posted by Hamltnblue on Monday, May 3, 2010 3:45 PM

 So far so good.  If there are any problems later I'll replace it but whatever was causing it is now crushed or dust.

Springfield PA

  • Member since
    September 2004
  • From: Dearborn Station
  • 24,280 posts
Posted by richhotrain on Monday, May 3, 2010 3:33 PM

Hamltnblue

 This last weekend I started running my M1a after an extended period on the shelf. The loco would derail at the same spot every time around.  After filing, etc with no luck I used the zoom of the camera and could see that the outside rail had a small hump that the loco was finding. Not wanting to rip the track up at the spot  I figured what do I have to lose.  I pulled out a 2 pound hammer and 4 good whaps the problem is gone Big Smile.  I ran for  over an hour without any further problems. 

If needed I could make a how to video but don't think it's necessary. 

Oh my!

I had a few humps that I finally took the time to fix by leveling the rails but never with a 2 pound hammer.

Seems to me that would damage the rail but not permanently fix the hump.

That hump is caused by something under the rail, not the rail itself.

Rich

Alton Junction

  • Member since
    May 2008
  • 4,612 posts
Blueline M1a derailing.
Posted by Hamltnblue on Monday, May 3, 2010 3:19 PM

 This last weekend I started running my M1a after an extended period on the shelf. The loco would derail at the same spot every time around.  After filing, etc with no luck I used the zoom of the camera and could see that the outside rail had a small hump that the loco was finding. Not wanting to rip the track up at the spot  I figured what do I have to lose.  I pulled out a 2 pound hammer and 4 good whaps the problem is gone Big Smile.  I ran for  over an hour without any further problems. 

If needed I could make a how to video but don't think it's necessary. 

Springfield PA

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!