Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

walthers 130ft modern turntable programming

3557 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    October 2006
  • 39 posts
walthers 130ft modern turntable programming
Posted by soofan on Wednesday, June 3, 2009 9:59 PM

I have just installed the newly released 130 ft turntable. It moves smoothly and looks good. I have two questions: 1) In programming, the instructions ask you to press the "set" button as you maneuver the bridge into each desired location. I press "set" and then the arrow requested and nothing happens. If I move the bridge to a stop I want to set, then press "set", it places the position into memory but when I move to my stops in normal operation, they are off mark a bit. 2) If a loco enters the turntable facing forward on a service track, and I need to turn the table to meet a radial track, with the loco facing the same direction, the "position" light flashes when I set the position, indicating I am too close to a previously selected stop. My roundhouse is directly across from the service tracks with the "no tracks" portion of the pit at right angles as specified. Does this mean I cannot program the radial tracks and if so, why not? I Am I missing something??

John

  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Thursday, June 4, 2009 12:14 AM

This is a cut and paste of the instructions I have for my 90'er, and they should be identical for your larger TT:

PROGRAMMING YOUR

TURNTABLE

Initializing the Turntable

Begin by plugging in the power

pack. With the power pack turned

off, press the SET and ZERO buttons

down at the same time. Now,

turn on the power and hold both

buttons for four to five seconds.

When the POWER light stays on,

the unit is ready to use. Press the

ZERO button until the POWER

light flashes, then release. The

turntable will move to the zero

point.

Programming New Stopping

Positions

1) Move the bridge from the zero

point to the first track you’d like to

program by pressing and releasing

either ARROW button.

Two stop positions are programmed

into the unit for testing

at the factory.
Don’t remove these

until you have programmed two or

three of your own tracks!
You can

also use these to test the operation

of your unit at this time – simply

press and release either the LEFT

or RIGHT ARROW keys. The

bridge will move in the direction

selected until it locates a factory

setting. The table will over-run the

stop position slightly when turning

counterclockwise — this is normal

— then back slowly into position.

2) Move the bridge to your first

desired position and stop the table

about 1/8" (3mm) from the right

hand rail. (If you go too far, press

and release the LEFT ARROW button;

touch and release either

ARROW button to stop, then move

the bridge counterclockwise with

the RIGHT ARROW button.)

3) Hold the SET button and gradually

inch the bridge rails into a 90°

alignment by pushing and releasing

the RIGHT ARROW key as

needed to move the bridge counterclockwise

— use the outside

edges of the rails as a guide to

check that all rails are perfectly

aligned.

(If the POS light comes on before

the track is aligned correctly, clear

the setting by pressing and holding

the SET key until the POS light

goes off.)

4) When the tracks and bridge are

aligned to your satisfaction, press

and hold the SET button until the

POS light comes on to show the

stop position is programmed into

the memory.

Repeat steps one through five for

each stopping position.

Important Note: Although tracks

may be directly across from each

other, you must program a separate

stopping position on each end

of the bridge."

Sorry, this is how it appears with the software here.  Anyway, did you follow the initial power-up sequence as described above?  When the power light stayed on after first power and the double simultaneous pressing of the two buttons indicated, did you hold the Zero button down until the power light flashed and then let it up?  Did the bridge move on its own to the Zero optical window?  Had you removed the tape covering of that optical window?

Follow the clearing procedures and start over from first plug-in to get it to the zeroing point.  I assume your zeroing point is somewhere within five or six inches either side of your approach track?  That is where mine is....out of the way.

-Crandell

  • Member since
    February 2001
  • From: Poconos, PA
  • 3,948 posts
Posted by TomDiehl on Thursday, June 4, 2009 4:54 PM

There are several things to consider when setting up your roundhouse and garden tracks:

1) Each track or stall has to be square to the turntable. When the table is set to that position, you should be able to sight along the track and across the turntable and the track should appear as a straight line. Very important for the next two considerations.

2)  Each track has to be programmed for both ends of the turntable.

3) To save programming, I set my 9 stall roundhouse (about a 1/4 circle) in place and programmed both ends of the turntable for each stall (18 program points). I then aligned an open (garden) track directly across from each stall, keeping point #1 in mind (no additional program points). I did the same thing with my two approach tracks (four more program points). Remember, you're limited to 60 positions. I have 32 tracks, plus two approach tracks. Programming both ends of the table for that many tracks if they didn't align would leave me a few positions short.

By following point #3 above, you eliminate the problem with trying to program a point too close to another (which is actually the track/stall almost directly across the table). Make them directly across to save yourself headaches with alignment and programming.

PS to Selector: you didn't have to do a cut and paste, the whole instruction sheet is available on line at the Walthers site:

http://www.walthers.com/instructions/0933/09330000002829.pdf

 

Smile, it makes people wonder what you're up to. Chief of Sanitation; Clowntown
  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Thursday, June 4, 2009 7:15 PM

Thanks, Tom.  That is where I found what I placed here...I just didn't know it would take up 50 vertical inches!  I wanted to provide the relevant instruction part in case he had somehow missed it.

-Crandell

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!