Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

How Many Here Have Lift/Drop gates/bridges On Curves?

3407 views
15 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
How Many Here Have Lift/Drop gates/bridges On Curves?
Posted by Capt. Grimek on Tuesday, June 3, 2008 8:25 PM
I may have to seriously consider a drop/lift/gate/bridge on a single or maybe double mainline.
Do any of you have one? Any pics and techniques to share that make them work dependably? I've read about cutting the gap on the rails at
an angle but nothing else pertinent.
Thanks.

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    March 2007
  • 247 posts
Posted by BCSJ on Tuesday, June 3, 2008 8:49 PM

Yep. The BC&SJ has a swing bridge across the room entrance way with a 40" radius curve on it. No problems so far. I drove #4 flat head wood screws into the plywood subroadbed on both sides of the 'fault lines' and soldered the rails to them for stability.

It's been working faithfully for the last three years.

Here's a photo of the rails crossing the fault zone at the swinging end of the bridge.

Regards,

Charlie Comstock 

Superintendent of Nearly Everything The Bear Creek & South Jackson Railway Co. Hillsboro, OR http://www.bcsjrr.com
  • Member since
    January 2004
  • From: Canada, eh?
  • 13,375 posts
Posted by doctorwayne on Wednesday, June 4, 2008 1:56 AM

Mine is a lift-out, rather than a swing bridge, but the track is curved on both sides and through the lift-out, too.  Here's a thread that discusses the issue , and if you follow it through, there are photos of mine and a diagram for wiring it so that trains are prevented from using the approach tracks if the "bridge" is out.

Charlie, your idea of soldering the rails to the screws in order to maintain the track alignment is a good one. Wink [;)]

Wayne 

  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Wednesday, June 4, 2008 3:25 AM
Thanks very much, Charlie and Wayne. Other than cutting the rail gaps at an angle are there any other
special circumstances involving curved track over straight? The pics and link very very helpful!

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    February 2002
  • From: PtTownsendWA
  • 1,445 posts
Posted by johncolley on Wednesday, June 4, 2008 10:53 AM
Hi, Jim, coincidence I found this one this morning. I hope you got my long note. I occasionally operate on a neat 3 level layout here in PT and the one level that is mid-height has a swinging gate that works very well. The top level is a fairly high duckunder and presents no problems even though the owner is about 6' 3". The gate is well engineered and formed out of cabinet grade plywood. If you send me your address online I will mail you some sketches, OK? Or I can bring them with me to Chilliwack. jc5729 John Colley, Port Townsend, WA
jc5729
  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Wednesday, June 4, 2008 11:08 AM

I have two situations where multiple curved tracks cross a fault line at an angle (not gates, but yard throats removable as units for maintenance.)  Since the rail joints are offset from each other, I installed guard rails on the inner side, opposite the gap in the outer rail.  That seems to have eliminated the few problems I had with some longer cars wanting to climb the (wider than usual gap) outer rail.

Mine are on hidden track.  On visible track, I'll probably put in some kind of roadway to justify the guard rail and help to disguise the fault line.

Chuck (modeling Central Japan in September, 1964)

  • Member since
    September 2004
  • From: Germany
  • 1,951 posts
Posted by wedudler on Wednesday, June 4, 2008 3:27 PM

It's in a curve and grade:

 

Wolfgang 

Pueblo & Salt Lake RR

Come to us http://www.westportterminal.de          my videos        my blog

  • Member since
    July 2006
  • From: Southern California
  • 47 posts
Posted by BurbankAV on Wednesday, June 4, 2008 5:37 PM

Well, kind of...  I plan to have one in the very near future, once I actually get some track down.

Obviously, reliability hasn't been an issue... yet. Whistling [:-^]

Peter

  • Member since
    August 2005
  • From: Ontario, Canada
  • 180 posts
Posted by Ballantrae Road on Wednesday, June 4, 2008 8:15 PM

I don't have a curved gate . I tried to avoid it for the nightmare adjustments it would require. So I made a straight gate and followed the recent swing gate instructions I saw on MR.It's made of 3/4" pine. The ends of the gate top are not solid. There is a space between the top and bottom pine board at the last 1 inche.There was an initial major warpage problem in the beginning from humidity changes. So I use a screw to adjust vertical height. Screw out to lift, screw in to drop. The horizontal adjustment seemed to be more of a challenge.I decided to screw a 90 degree bracket onto the door frame , tapped 2 holes in it and now the 2 hex screws (with soldered levers) can be turned in or out for horizontal alignment. Works like a charm.Of course you have to have a dead accurate alignment at the pivot point of the gate. Otherwise this would be almost impossible to work properly. Good luck on your project.

Tom

  • Member since
    February 2002
  • From: PtTownsendWA
  • 1,445 posts
Posted by johncolley on Tuesday, June 10, 2008 10:05 AM
FWIW Dept: One tip I found useful is that a modelling razor saw is the thinnest blade you can get, so after you have installed and checked out the gate for swing, lock it in place with a barrel bolt in the closed position, then lay your track all the way across it and extending past the joints. When you have it down pemanently use the razor saw to carefully cut through the track and ties at the two fault lines. Wire the track(s) with flex at the hinge end. jc5729 John Colley, Port Townsend, WA
jc5729
  • Member since
    October 2005
  • From: Nashua, NH
  • 430 posts
Posted by Cannoli on Tuesday, June 10, 2008 10:11 AM
My new layout will feature a liftout on a curve to allow for display running. I will primarily be running it as a point to point will have the ability to insert the curved lift out to allow for display running during tours or if I just want to watch the trains go round 'n' round. Smile [:)]

Modeling the fictional B&M Dowe, NH branch in the early 50's.

  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Wednesday, June 11, 2008 1:22 PM
The initial reason I posted the question (as OP) was that I've always heard that curved gates (especially for double tracks) were a nightmare. Are you all finding that it isn't as "scarey" as everyone makes it out to be?
That is not THAT much harder to keep things aligned than for a straight track (double track) gate?
I've been overjoyed to say the least that not only am I getting great info. and pics here that really help, but that it isn't nearly the uncommon thing I've always believed it to be!

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    March 2007
  • 247 posts
Posted by BCSJ on Friday, June 13, 2008 12:48 PM

I can't remember having any derailments going on or off my curved (single) track swing bridge since it was installed 3 years ago. Perhaps the 40" radius helps - maybe it would be less reliable with an 18" curve...  FWIW

The key is to make sure both ends of the bridge can be securely and accurately locked in place, provide a means of locking down the track at the edge of the chasm (and allow for expansion and contraction on the bridge track - use two pieces of track with an unsoldered joint in the middle). 

One end of my bridge is located with 3 decent quality door hinges, the other end swings back and forth and rests on a shelf when it's closed. I made an alignment pin out of brass tube and round stock. After getting the benchwork aligned originally I clamped it and drilled a 1/8" hole through the bridge into the shelf below. Then I drove pieces of 1/8" tubing into both holes. Finally I made a pin out of brass round stock that tightly fits into the tubing.

I could have skipped the tubing but by using it if the pin remove/replace cycles end up weaing the hole I can pull and replace the tubing sections.

I also put a micro-switch below the pin location. This switch turns off track power for a long ways on both sides of the bridge to avoid either driving or backing a train into the gorge of eternal perial (actually the entire Oakhill area adjacent to the bridge loses power when the pin is pulled).

Once the benchwork is swinging nicely, I drove eight 3/4" #4 flat head wood screws into the support wood next to the gaps, one under each rail. The heads were slightly below the bottom of the rail.

Then I laid the rail across the gaps. I glue flex track down with paintable latex caulk. Once the caulk set up I soldered the rail bottoms to those #4 flat head wood screws then I used a cutoff disk in a dremel to gap the rails directly above the gaps in the tectonic plates (benchwork).

I opened it up to make sure everything slid sideways nice and easy without hanging up and made a few passes with a file to clean burrs off the ends of the rails leaving 'em nice and smooth.

If the rails every need realignment (they haven't so far) I can heat up the solder joint on that #4 wood screw, move the rail then resolder. Simple. Anchoring the rails reduces the likelihood that a shirt sleeve will snag a rail and yank it out by accident.

With careful construction and attention to alignment details there's no reason why you shouldn't be able to build a reliable bridge too. For tighter curves perhaps adding some guard rails might be a good idea. I've built 3 swing bridges (only one curved) so far and none of them needed the guard rails.

Hope this helps,

Charlie Comstock 

Superintendent of Nearly Everything The Bear Creek & South Jackson Railway Co. Hillsboro, OR http://www.bcsjrr.com
  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Friday, June 13, 2008 12:52 PM
Thanks Charlie! That was a great step by step set of directions. No wonder they made you Superintendent!
The Tectonic Plate thing was pretty funny too :-)

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

  • Member since
    March 2007
  • 247 posts
Posted by BCSJ on Monday, June 16, 2008 8:30 PM

 Capt. Grimek wrote:

The Tectonic Plate thing was pretty funny too :-)

Not so funny if you lived trackside. The locals complain that every time one of the freakin' giants the railroad or Hillmovers Construction uses for construction work opens or closes the bridge, all their best china ends up on the floor and half the time the gold fish takes a swim in the dog's water dish. I dunno if I should believe 'em but there are rumors of a class action suit brewing. The railroad is trying to get the giants to be real gentle-like and slow and easy when operating the bridge but you know how clumsy giants tend to get...

If you like malarky you might find more looking at the South Jackson Gazette

Regards,

Charlie Comstock 

Superintendent of Nearly Everything The Bear Creek & South Jackson Railway Co. Hillsboro, OR http://www.bcsjrr.com
  • Member since
    March 2008
  • From: Seattle Area
  • 1,794 posts
Posted by Capt. Grimek on Monday, June 16, 2008 8:47 PM
Now that's my brand of malarky! I'll have to read the "paper" more often! :-)

Raised on the Erie Lackawanna Mainline- Supt. of the Black River Transfer & Terminal R.R.

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!