QUOTE: Originally posted by Dock_661 Is it ok to use entire pieces of Flex track through out a lay out as curves!
QUOTE: what should the distance in wireing be! how many inches or feet? as a good rule of thumb!
QUOTE: where should I sauter(SP?) the wiring to the rails? should it be where they conect?
Tom
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.