Hello All,
I have been reading in some of these forums about the use of concrete for a road bed. Can any one tell me how thick to make the road bed and how wide the road bed should be? How can i keep the track from sliding off the cement? Due to the outside weather i thought that screwing the rack to the cement would be the wrong thing to do because of the expansion and contraction of the track.
It looks like i will have to use either r-1 or r-2 curved track due to my lay out space limitations. Also can the shorter double wheel train cars run on the r-1 curved track?
My starter set rolling stock has only the european style cars that have only one wheel per side on each end.I want to change to the early american train cars and steam loco's.
Thanks for your help,Rick M.....La Crescenta,Ca.
I would agree with Mike on this, why do you want to go the trouble of using concrete(cement)? i wouldn't unless i had good reason to. I would not fasten the track to anything, rather have it "float" on and in the ballast, i use quarry fines. I would not put stones into the fines but if i did i would be very careful what i used. Look at my posting on an impossible situation in the general section before you do anything like that.
If you have LGB rolling stock, European or American it will go around any R1 curve but it will look a bit funny if your stuff is too big. If you have too many of these curves all together and in different configuration you will have nothing but trouble with bigger stuff.
Rgds ian
I did my first railroad with the old trench and ballast method and had problems with wash outs in heavy rains. Our land is in the hills and we can get significant run-off.
For the "big" layout in back I used a concrete roadbed for the initial loop as it was on flat ground and easy to do. I made the roadbed about 3/4" wider than the ties to give my self enough room to hold the ballast. The track still floats in the ballast as I'm in south Texas and the summer sun will cause significant expansion and contraction of the track.
Besides the fact that I no longer have to worry about wash-outs, the concrete sub-roadbed has other advantages. I don't have to worry about settling in the sub-roadbed, the hard surface makes for trains that roll easily and it was very easy to insure the track was level when I initially put it in.
The concrete roadbed is easier than it looks to put in. I just trenched the ground and made a moving form out of plastic garden edging. While the concrete was setting in the form, I would trench the next section. When the concrete had come to a good set, I'd move the form up to the next trenched section and repeat the process. A little ballast springled on the setting surface of the concrete assured a rough enough surface where the final ballast would not move.
For laying the track, I'd put it down on the concrete, cover it with ballast and then lift the track a bit to insure a good bed of ballast between the ties and the subroadbed. If you use a ballast with a significant amount of fines such as crushed granite, the track will be solid but still able to breath with the weather changes and normal use. It's been down for several years and only requires a bit of touch up now and then despite the weather and a big dog.
It has required far less maintenance than the original trench and fill method I used on the first layout.
Not for everybody but it worked for me on the flat area of my layout. I do use a different method of roadbed (Split Jaw Roadbed) on the newer sections of my layout that is more "topographically challenged" as the concrete method is harder to do when faced with grades and curves.
The depth of the concrete will vary depending on your location. I don't have to worry about frost heave so I made the subroadbed only a couple of inches deep with no internal rebar. In areas of the country where frost heave is significant, one should consider a deeper trench and rebar.
Try Marty Cozad's article on myLargescale.com. Very straight forward info.
http://www.mylargescale.com/articles/articles/concreteroadbed/roadbed01.asp
Tom Trigg
E-mail me on the side
cozy6z@yahoo.com
I can better fill you in. ITS far less work than the trench methods and has much better maintance free life.
Many folks who have visited here have gone home and done concrete to their RRs.
I had one guy tell me it took him6 hours the first try, then after a few runs he was done to 2 hours per section.
Is it REAL? or Just 1:29 scale?
Long live Outdoor Model Railroading.
Rick.
That guy Marty was talking about was me [at least I have said that, too - true story].
With concrete roadbed, you just run. Marty's URL posted above is good advice. Also, I have posted threads on my use of concrete and ladder roadbed in your "Switch track" thread.
Jim Carter
Hi Thanks for your advice on the cement road bed ideas. But can you tell me how to do the "splitjaw method?" I also am faced with grades in order to cross over the bottom track and switch tracks for depots and passing sidings that are on a grade as well.Some of these intail curved track as well.
Thank's Again...Rick Manalia ..La Crescenta,Ca. e-mail .......r56@pacbell.net...:)
The best explanation can be found on Split Jaw's web page. It goes in just like they say it does.
Try;
http://www.gardenrailwayproducts.com/howdoi.html
Have fun with your trains