well I see I'm behind the power curve on my post so here is your ansure the DNRR is DOING NUTIN RAIL ROAD ( MY wife's version DAVE AND NANCY RR ). as stated above the Building has been on hold my helper has been layed up with multi fracturs to her left leg. so i have been spending more time in Cal then in Reno Nv. Plus I've been working nigths driving all over Ca. The work that i have completed is going to be ripped out an lowered. The new plan will have three levels starting at 42" working it's way up to 60" (almost walk under). the main level will be at 48" all of this is subject to change. I have built some over head storage at the 8Ft level so I will need access to it, I also have a heater access door in the Middel of my space about 10ft above the floor . I plan on going to the new house this weekend and working on the rail road.
The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.
Whats DNRR?
Ian
Get the Garden Railways newsletter delivered to your inbox twice a month