Trains.com

Joiners for a lift-out "bridge"?

4075 views
11 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2003
  • From: S.Easton , Mass.
  • 593 posts
Posted by smcgill on Monday, September 28, 2009 1:15 PM
pic?

Mischief

  • Member since
    June 2008
  • From: N. California & Nevada
  • 448 posts
Posted by g. gage on Saturday, September 26, 2009 11:23 PM

Howdy Ed, if I understand your question I believe you could use what modular railroaders call a “Spanner” a piece of track with the tie under cut at one end. Make your bridge track a spanner, undercut a tie on one end, slide the regular joiners back enough to install the track on the unmodified end then slide the joiners on the modified end into place. I double feed power from both ends; I install two spanners on my railroad every time I run and have never had trouble with them.

 

Good luck, Rob

 

  • Member since
    August 2003
  • From: Collinwood, Ohio, USA
  • 16,367 posts
Posted by gmpullman on Saturday, September 26, 2009 11:43 AM

Thanks for all the ideas!

I like the option of just having a slide over joiner since all I need is mechanical alignment. I'll be using a polarized plug to keep electrical continuity to the rails.

The NS (NYC) lift bridge over the Cuyahoga River here in Cleveland has pneumatic locks to insure the bridge is in place and aligned so there really is a prototype—sort of—for this kind of thing!

The Split Jaw ball-spring deal looks nice but I'd be afraid of water getting in there and freezing which has caused some rail joiner damage on my layout.

Thanks again,

ED

  • Member since
    August 2005
  • From: North Coastal San Diego
  • 947 posts
Posted by Greg Elmassian on Friday, September 25, 2009 7:48 PM

 A new item for SJ, and the site only lists 332 size, but they do make a line of 250 clamps. My opinion is that it's worth an email to them.

I went to the Hillman site, and they have code 250 bridge clamps. I have a set of theirs and they work fine in 332.

Regards, Greg

Visit my site: http://www.elmassian.com - lots of tips on locos, rolling stock and more.

 Click here for Greg's web site

 

  • Member since
    September 2003
  • From: Centennial, CO
  • 1,192 posts
Posted by kstrong on Friday, September 25, 2009 1:51 PM

I just use the slide-over rail joiners since they don't have to conduct electricity. I had bought some clamps for that purpose, but found it easier just to slide the joiners than deal with tightening and loosening the clamps every time.

Greg, do you know if Split Jaw makes the ones you use for code 250? That sounds like an even simpler way to do business, and will work well once I redeck the bridge with proper bridge ties (losing the ability to slide the joiners).

Later,

K
 

  • Member since
    August 2005
  • From: North Coastal San Diego
  • 947 posts
Posted by Greg Elmassian on Thursday, September 24, 2009 9:43 PM

 SJ has the profile of Aristo SS worked out well, I have all Aristo SS... the hillmans I have also work well, I managed to get some nickel plated ones.

Regards, Greg

Visit my site: http://www.elmassian.com - lots of tips on locos, rolling stock and more.

 Click here for Greg's web site

 

  • Member since
    February 2004
  • From: North, San Diego Co., CA
  • 3,092 posts
Posted by ttrigg on Thursday, September 24, 2009 8:41 PM

Years back I had a lift out bridge on an N scale layout.  Before laying track, I built the bridge (plywood base); at each end I used copper pop-rivets.  I separated the copper “nails” from the rivets.  Two copper nails in each end of the bridge with electrical connections to be attached later to the rails.  In each abutment, I put two copper rivets with electric leads to connect the rails on the layout.  After the rough wood work was in place and stable I began laying tracks.  I used flex rail so that there would be no joint at the bridge ends.  After ensuring things ran properly I then cut the rails using a dremel tool.  The copper rivets provided stability and proper rail head alignment as well as electrical continuity.  I never needed rail joiners for the three years that layout existed.  You might consider something larger along that line.  If you can achieve proper stability and alignment you might not need joiners.

Tom Trigg

  • Member since
    January 2005
  • From: Slower Lower Delaware
  • 1,266 posts
Posted by Capt Bob Johnson on Thursday, September 24, 2009 2:41 PM

Greg, do they fit Aristo SS track better than the other brand did???

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Thursday, September 24, 2009 9:56 AM

Greg, Do you have a picture?

Dave

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    August 2005
  • From: North Coastal San Diego
  • 947 posts
Posted by Greg Elmassian on Wednesday, September 23, 2009 2:49 PM

 Split Jaw also makes them now.

Buy the ones made for this purpose, they have spring-loaded plungers to hold the track in place. I have them. They work.

Regards, Greg

Visit my site: http://www.elmassian.com - lots of tips on locos, rolling stock and more.

 Click here for Greg's web site

 

  • Member since
    June 2006
  • From: Oakley Ca
  • 1,407 posts
Posted by dwbeckett on Wednesday, September 23, 2009 9:01 AM

This is how I did mine.

 

Dave

The head is gray, hands don't work , back is weak, legs give out, eyes are gone, money go's and my wife still love's Me.

  • Member since
    August 2003
  • From: Collinwood, Ohio, USA
  • 16,367 posts
Joiners for a lift-out "bridge"?
Posted by gmpullman on Wednesday, September 23, 2009 12:36 AM

Hello all

I'll be expanding my empire soon and will be needing a lift-out bridge section so that lawn equipment, etc. can pass through the layout extention. I plan to use a piece of aluminum wire trough, which for all of you not familiar, is a strong but lightweight channel made of aluminum for laying heavy industrial wiring in — and, for my purpose, will be ideal to act as a stable yet easy to remove "bridge".  I probably would only have to remove it once a week... if that.

Now my question... I'd like to use a sliding joiner to align the rails when the track is in place yet be able to slide the joiner back to lift out the section. I am familiar with Hillman® clamps and perhaps this would be the way to go but I wondered if anyone had a better solution?

I could provide track power with a jumper and plug so electrical conductivity is not an issue. Ideas?

Thanks, ED

Search the Community

FREE EMAIL NEWSLETTER

Get the Garden Railways newsletter delivered to your inbox twice a month

By signing up you may also receive occasional reader surveys and special offers from Garden Railways magazine. Please view our privacy policy