These last two weeks my better half was on a business trip (Penang) so I had some uninterrupted time to do some heavy rock work. I started with 10 tons of contaminated (dirty) basalt 4-8 inch which actually had a fair amount of 2 and 3 inch stuff as well. I back filled with mortar to "glue" it all together so the grout wouldn't show. Anyway here are some pictures:
The rock pile
The bridge and helix
I even rocked some of the steps. I do plan to put a tunnel portal face on both sides of these steps.
Gold mine loop looking North
Rex
Nice work Rex. My back aches just looking at that 10 ton pile !
-Brian
Get the Garden Railways newsletter delivered to your inbox twice a month