Who's layout has the steepest grades

3196 views
14 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    August 2003
  • 6,434 posts
Who's layout has the steepest grades
Posted by FJ and G on Tuesday, March 15, 2005 6:48 AM
Or should I say ruling grade?

My entire layout is built on a 2.25% grade. That means I cut or fill for the spurs.

BTW, if you wi***o see a nice grade, check this out. Also, look closely at the turnout.

  • Member since
    December 2003
  • From: St Paul, MN
  • 6,218 posts
Posted by Big_Boy_4005 on Tuesday, March 15, 2005 6:54 AM
That's called a stub switch Dave.
  • Member since
    August 2003
  • 6,434 posts
Posted by FJ and G on Tuesday, March 15, 2005 6:59 AM
Hi Elliot,

Yes, I made one but am not currently using it on the layout. Must have taken a lot of effort to push it over. I don't see any switch stand so I think it took a couple of people with strong backs.

It is believed that this photo was taken about 50 years ago somewhere in West Virginia
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Tuesday, March 15, 2005 11:13 AM
I've never seen a switch that looked like that before. Why would a railroad use that kind of switch instead of a normal one?

Tony
  • Member since
    August 2003
  • 6,434 posts
Posted by FJ and G on Tuesday, March 15, 2005 11:28 AM
Tony,

The other option is what is called a "split switch". However, it is more complex, with shaved point rails, switch rods, head blocks. Why hassle with that when you've got tough lumberjacks who can manhandle the stub into place?

Note the lack of ballast as well and note that the track simply follows the lay of the land
  • Member since
    December 2004
  • 3,176 posts
Posted by csxt30 on Tuesday, March 15, 2005 11:45 AM
Hi Dave, I Like that picture & maybe that RR didn't have much funds available at the time for ballast & better switches. I have a 2inch rise in 12 feet on my layout, don't know what % grade that is, but seems to work ok. Thanks, John
  • Member since
    February 2005
  • From: Vancouver Island, BC
  • 23,330 posts
Posted by selector on Tuesday, March 15, 2005 12:12 PM
Hi, Gents. My grade is near 3.7%, and looks it. I use it solely for a Lifelike Heritage 0-6-0 to pu***wo empty ore cars up it , and when half-way, it enters a timber tunnel portal and spirals up to a mine.

The loco is not large, nor is it powerful, as you would anticipate, so it struggles. If the track is the least bit dirty, it will spin and not make it up the grade.

i will attempt to add some weight to the loco when I add decoders.

I'm sure others have grades considerably steeper.
  • Member since
    December 2003
  • From: St Paul, MN
  • 6,218 posts
Posted by Big_Boy_4005 on Tuesday, March 15, 2005 3:53 PM
Actually the throwing mechanism for that is just a big lever standing upright with the fulcrum down low. The travel distance is not that great, and the fact that the stub ends are resting on those plates makes for less friction. The mechanical advantage and a little muscle will get the job done.
  • Member since
    December 2003
  • From: St Paul, MN
  • 6,218 posts
Posted by Big_Boy_4005 on Tuesday, March 15, 2005 4:09 PM
QUOTE: Originally posted by vitabile

I've never seen a switch that looked like that before. Why would a railroad use that kind of switch instead of a normal one?

Tony


Tony, a couple of reasons. First it is cheaper, less material, and no tapered points. Second, it is easier to keep clean in areas with heavy snow.

I suspect this is a narrow gauge logging railroad, and judging from the grade it used some kind of geared locomotive like a Shay, Climax, or Heisler. Because the grade is steep in both directions, this is probably a tail for a switchback.

  • Member since
    March 2002
  • From: Tucson
  • 336 posts
Posted by webenda on Saturday, March 19, 2005 11:04 PM
QUOTE: Originally posted by csxt30
I have a 2inch rise in 12 feet on my layout, don't know what % grade that is, but seems to work ok.


John,

I checked back to see if anyone revealed the secret formula for calculating grade. Here it is...

---------------------SECRET---------------------
Grade in Percent = 100 x Rise / Run
---------------------SECRET---------------------

NOTE -- Rise and Run must be in the same units (inches, feet, meters, etc.)

Your run of 12 feet is 144 inches, therefore,
Grade in Percent = 100 x 2 / 144 = 1.4%

Don't tell anyone how you got the answer.[;)]

Wayne

 ..........Wayne..........

  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Sunday, March 20, 2005 12:22 AM
I have a 3.125% grade into an elevated crossing with the same grade down on the other side. Causes an appreciable slowing until the engine crosses the hump and starts down the other side.
  • Member since
    December 2004
  • 3,176 posts
Posted by csxt30 on Sunday, March 20, 2005 6:14 AM
[:)]Thanks Wayne & I did come up with that figure before, but wasn't sure, so thanks! Doug, I have that speed control on my new MTH eng. & it stays a constant speed on the inclines. I forget sometimes & go to compensate & then remember I don't have to! Thanks, John
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Monday, March 21, 2005 5:03 PM
I think I win, hands down. My BEEP goes straight up!
  • Member since
    July 2003
  • From: North Texas
  • 5,707 posts
Posted by wrmcclellan on Tuesday, March 22, 2005 10:51 AM
Vitable,

Stub switches were the common switch used by RRs in the 19th century when rail and trains were lighter and trains were slower. They were eventually outlawed for class 1's I believe. But many still exist - particularly on narrow guage. BTW - a stub switch is the best way to build a 3-way switch.

Here is an interesting web link for turnouts that also addresses stub switches.

http://www.du.edu/~jcalvert/railway/turnout.htm

Regards,
Roy

Regards, Roy

  • Member since
    February 2005
  • 1,821 posts
Posted by underworld on Tuesday, March 22, 2005 2:34 PM
Wow! That is a crazy grade in the pic. Looks more like roller coaster material!

underworld

[:D][:D][:D][:D][:D]
currently on Tour with Sleeper Cell myspace.com/sleepercellrock Sleeper Cell is @ Checkers in Bowling Green Ohio 12/31/2009 come on out to the party!!! we will be shooting more video for MTVs The Making of a Metal Band

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

FREE EMAIL NEWSLETTER

Get the Classic Toy Trains newsletter delivered to your inbox twice a month