You need lots of room and must like slow train operation for point to point. You can have both. Put loops at the end of your points to give continuous point to point.

Charlie
  • Member since
    February 2004
  • From: Chesterfield, Missouri, USA
  • 7,214 posts
Posted by siberianmo on Thursday, March 3, 2005 2:32 PM
Mine is not an "either - or" answer to this. I prefer both and have that on my HO "Can-Am" railroad. The overall dimensions are 35 ft in length and 15 1/2 ft wide at the widest point - most widths vary down to 7 ft or so. The layout features a double track mainline - a rather large passenger terminal with 8 covered train platforms (all filled, of course!) and a mountain point-to-point line for my RDC's to make their journey. There really isn't anything fancy or novel with the way I've constructed this - perhaps the exception being that the RDC's come to a stop on their own when they enter their respective sidings at either end of the run. Toggle switches and insulated rail joiners work for me.

So, I run two trains in opposite directions on the main level - usually one VIA Rail and one Amtrak. The mountain run features BC Rail RDC-3's or VIA Rail RDC-2's (2 per consist).

I should point out that my passenger terminal and city area is set aside from the mainlines - kind of like an addition to a house; an add-on if you will.

So with three trains running, I then can run some trains in my passenger yard - make up or beak up, while "things are happening" on the main lines.

You know what? I spend just as much time simply looking at the layout with all of the divergent aspects built into it as I do operating the trains. The way this turned out gives the viewer so many different vantage points in my walk-around layout arrangment. You really cannot see it all from one place - for the mountains do a good job of concealing what is right around the corner or on the other side.

That's my contribution!
Happy Railroading! Siberianmo
  • Member since
    August 2003
  • 6,434 posts
Posted by FJ and G on Thursday, March 3, 2005 12:36 PM
I've got a quick takedown device I have invented to change point to point to continuous, made of PVC. I'll share the plans w/you at a later date.
  • Member since
    September 2004
  • From: Middle o' Nowhere, MO
  • 1,108 posts
Posted by palallin on Thursday, March 3, 2005 11:09 AM
Unless your layout is built in a blimp hanger, you don't have enough room for a prototypical point-to-point layout. In O, 110 feet equals One Mile. A (generous) 20' point-to-point layout equals a Whopping 960 real feet of track. 960 feet of track is enough to store a train made up of a steam loco, 18 small boxcars, and a caboose--a fairly short prototypical train. Unless you are modeling the industrial trackage on a single, SMALL business' property which only shunts around a car or two, a loop is no less prototypical than point-to-point.
  • Member since
    November 2002
  • From: US
  • 4 posts
Posted by docflhs on Thursday, March 3, 2005 11:00 AM
Loops are easy and conveinent and I use them for most trains. However, I also use point to point for trolleys and RDC's. I use DZ station stops with these. I wi***hey or someone would come up with a component that would not only run the point to point with station stops but also run switches so that as 1 train pulls out another can pull in on the other side of the station. That would be great with the new subway sets by MTH and allow us to run a lot more trains at the same time on the same loop or point to point set-up.
docflhs
  • Member since
    August 2003
  • 6,434 posts
Posted by FJ and G on Thursday, March 3, 2005 10:16 AM
as far as I can tell, my layout is the only point-to-point toy train layout that ever existed. You can tell that I'm into switching and track puzzles.
  • Member since
    December 2003
  • From: St Paul, MN
  • 6,218 posts
Posted by Big_Boy_4005 on Thursday, March 3, 2005 10:16 AM
QUOTE: Originally posted by Sask_Tinplater

I like having continuous loops so that I can just let my trains run and watch them go without having to touch the controls. Switching isn't really my thing.


Mitch, I think I told you when you visited, things change as you get older. Switching isn't your thing, YET. Just wait, at your age it wasn't my thing either.[swg]
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, March 3, 2005 10:08 AM
I like having continuous loops so that I can just let my trains run and watch them go without having to touch the controls. Switching isn't really my thing.
  • Member since
    March 2004
  • From: Over the Rainbow!
  • 760 posts
Posted by eZAK on Thursday, March 3, 2005 9:18 AM
Although I don't have one there may be some avantages to a point to point.

One would be that it could be put into a narrow space.
Only 10 to 12" wide with a passing siding.
With a few relays you could run two small trains simultaneously.

You could also add industry for more switching fun!

I think this type of layout would be ideal for a home office or back of garage were the front end of a car can fit under.
Relax, Don't Worry, Have a Home Brew!</font id="size2"> Pat Zak</font id="size3">
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, March 3, 2005 9:09 AM
I like to operate like the pritotype.,but the continues loop is there. You just have to let that baby srectch it's legs once in a while.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Thursday, March 3, 2005 8:54 AM
I'd do a point to point if I had the room.

There was a thread or two on the OGR forum recently about setting u O gauge layouts outdoors. Doing so would give you a very long run, by O scale train standards, depending on the size of your backyard. That could certainly be set up point to point, if you wanted to.

I have 1/3 acre, and I haven't measured anything, but the thought of setting up a garden railroad has occurred to me. I was gonna do it with G scale trains, but maybe I'll stick with O. I have to measure everything out, too.

If I did this, I'd probably still have it be a continous loop.

Tony
  • Member since
    July 2003
  • From: Crystal Lake, IL
  • 8,059 posts
Posted by cnw1995 on Wednesday, March 2, 2005 9:18 PM
I like loops for the same reasons Roger and Big Boy indicated - it can run by itself when I want it to do so.

Doug Murphy 'We few, we happy few, we band of brothers...' Henry V.

  • Member since
    December 2003
  • From: St Paul, MN
  • 6,218 posts
Posted by Big_Boy_4005 on Wednesday, March 2, 2005 8:58 PM
As much as I wanted my layout to follow the prototype, I have made a provision for the main line to secretly loop back on itself. Very sneaky, because one end is in a hidden yard, and the other end has a switch coming from behind the backdrop, and will be covered by a highway overpass. The train will simply go into a tunnel, and pop out in a different place, bypassing almost 200 feet of mainline.
  • Member since
    April 2003
  • 305,205 posts
Posted by Anonymous on Wednesday, March 2, 2005 8:29 PM
Roy,

Thank you for your input. I've built several continuous loop layouts but never a point-to-point system. I am most interested in prototypical operation and thought point-to-point might better facilitate that. However, your point about having the option of leaving the train to run continuously is well taken.

Again, thank you

Ralph
  • Member since
    July 2003
  • From: North Texas
  • 5,707 posts
Posted by wrmcclellan on Wednesday, March 2, 2005 7:12 PM
Ralph,

First of all - [#welcome]

I prefer continous loop. If I want the train to run unattended, I can. If I do operations, then I do not care about the loop, but at least I have it.

I have purchased or subscribed to MR magazine for nearly 40 years. Many layout builders, even those heavily focused on prototypical operation, either have some reverse loops or connectors for continuous running or wi***hey had one.

Regards,
Roy

Regards, Roy

  • Member since
    April 2003
  • 305,205 posts
point-to-point vs continuous operation
Posted by Anonymous on Wednesday, March 2, 2005 4:37 PM
What are your feelings about point-to-point railroading versus continuous loop operation?

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

FREE EMAIL NEWSLETTER

Get the Classic Toy Trains newsletter delivered to your inbox twice a month