Trains.com

Length of Approach for Descending?

666 views
4 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2001
  • From: Austin, TX
  • 10,096 posts
Posted by lionelsoni on Thursday, January 27, 2005 10:02 AM
If you never want to climb but always to descend, I suspect that you could get away with a much steeper grade, in the vicinity of 10 percent. I would then pay special attention to making the transition smooth, since couplers have a way letting go at abrupt changes in grade.

Bob Nelson

  • Member since
    September 2004
  • From: French Las Vegas
  • 129 posts
Posted by AlanRail on Thursday, January 27, 2005 6:24 AM
F53

take a look at Woodland Scenics Subterrian Incline system;

the stryafoam incline is premolded at 2%, 3% and 4%


Alan
  • Member since
    January 2005
  • 1,991 posts
Posted by Frank53 on Wednesday, January 26, 2005 10:38 PM
thanks BB - I think the train going under ground would be cool, and I also think there will lots of interesting scenery opportunities with a chasm to the lower level.
  • Member since
    December 2003
  • From: St Paul, MN
  • 6,218 posts
Posted by Big_Boy_4005 on Wednesday, January 26, 2005 10:31 PM
Frank, 125" of run would give you a grade of 4% to make your 5" drop. 4% is about the maximum practical grade for trains, real or model. The longer you can make the run the better.
  • Member since
    January 2005
  • 1,991 posts
Length of Approach for Descending?
Posted by Frank53 on Wednesday, January 26, 2005 9:33 PM
Would someone please let me know the amount of length I will need to decend 5" to a lower level?

I got a new monkey wrench thrown in the works, making it necessary for me to work in a narrow space. The layout I may end up using will be "J" shaped with the long end being 16' in length but only 35" wide. Perpindicular to one end I can add a 4x8.

I will be using only post war lionel and standard track with 31" radius curves and #22 switches.

I figure I can create a number of routes throughout the layout, but when I get down the 16' x roughly 3' stretch, I will only be able to come back with a reversing loop, as I want scenery area, as opposed to just running a "U" shape. I can share the reversing loop with a number of trains, but I can minimize the sharing by running another reversing loop under the main layout. I will need to descend to it and the train will re-emerge from it after navigating the lower loop. Hence, my question, how much descending approach will I need to get down the 5"?

I will have a lower level for a subway, so it is just a matter of building more platform to accommodate the loop and beginning ascent.

Any help is greatly appreciated.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

FREE EMAIL NEWSLETTER

Get the Classic Toy Trains newsletter delivered to your inbox twice a month