Trains.com

Time spent?

2407 views
12 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2006
  • From: Florida
  • 2,238 posts
Time spent?
Posted by traindaddy1 on Sunday, October 15, 2017 2:15 PM

As a modeler at home and when participating at the modeler club, my sessions, at times, stretched on. Now as a player, they vary depending on if it is solo (just me) or with visitors.

Was wondering, how long would you guess your average running/playing/modeling sessions run?

As always, many thanks.

  • Member since
    August 2010
  • From: Henrico, VA
  • 8,955 posts
Posted by Firelock76 on Sunday, October 15, 2017 7:47 PM

Running sessions? Oh, about a half-hour to 45 minutes.

Modeling/building sessions, time as needed, maybe an hour to two hours.

Then a running session!

  • Member since
    January 2006
  • From: Florida
  • 2,238 posts
Posted by traindaddy1 on Wednesday, October 18, 2017 9:57 AM
Firelock76...Thanks.
KRM
  • Member since
    January 2011
  • From: North Bluff above Marseilles IL
  • 6,506 posts
Posted by KRM on Wednesday, October 18, 2017 10:07 AM

A lot of times when I am working on repairs of a train I have the trains running at the same time. Playing with them when the grand-kids are here about 1/2 hour before they change direction on me. Laugh

As for modeling sessions I am pretty nuch done with the layout so not much these days. When I was building I would spend about an hour at a time.

Joined 1-21-2011    TCA 13-68614

Kev, From The North Bluff Above Marseilles IL. Whistling

 

  • Member since
    January 2006
  • From: Florida
  • 2,238 posts
Posted by traindaddy1 on Wednesday, October 18, 2017 4:14 PM
KRM.....Thanks.
  • Member since
    August 2010
  • From: Henrico, VA
  • 8,955 posts
Posted by Firelock76 on Wednesday, October 18, 2017 5:29 PM

You're welcome, Traindaddy!  I'm surprised this subject hasn't generated more interest and responses.

  • Member since
    July 2014
  • 184 posts
Posted by Plate Rail on Thursday, October 19, 2017 5:26 PM

An operating session is usually combined with a bit of layout tweeking.  Generally about 1 1/2 hours.  Sometimes a work session can last all day.  Today's was spread over 4 hours.

Bruce

  • Member since
    January 2006
  • From: Florida
  • 2,238 posts
Posted by traindaddy1 on Friday, October 20, 2017 10:19 AM
Bruce: Thanks
  • Member since
    April 2005
  • From: South Carolina
  • 9,713 posts
Posted by rtraincollector on Friday, October 20, 2017 12:23 PM

Not having a layout at present I can't really comment. Things have changed since I last had one, some for the better some not. I had a 14' x 14' room when had my last layout and had a 8' x14' layout. on plywood. Now I have a room about 8' x 11' and I have no room for a layout due to furniture in here including my desk. I'm looking at 1 removing a piece to the garage and two rearrange the rest of the area to give me a 5' 8' area I can build on. 

But to answer your question zero running and probably about 5 hours adau trying to figure how to do things.

Life's hard, even harder if your stupid  John Wayne

http://rtssite.shutterfly.com/

  • Member since
    February 2008
  • 318 posts
Posted by robmcc on Friday, October 20, 2017 5:34 PM

For me lately, not enough! :(  When I have the time, I usually fall in the 45 minutes to an hour range. It varies depending on the time of year. I hate to think of myself as a "seasonal" model railroader, but I tend to have more time during the winter than the summer. It doesn't mean I don't run my trains during July, but it is a lot less frequent.

Rob

  • Member since
    January 2006
  • From: Florida
  • 2,238 posts
Posted by traindaddy1 on Friday, October 20, 2017 6:39 PM
Rob: Thanks
KRM
  • Member since
    January 2011
  • From: North Bluff above Marseilles IL
  • 6,506 posts
Posted by KRM on Sunday, October 22, 2017 2:40 PM

Rob, Nothing wrong with "seasonal",, truth be know I bet we, at least us with winter are all somewhat "seasonal" model railroaders. I make a point to run them in the summer but it is not even close to winter run time. Wink

Joined 1-21-2011    TCA 13-68614

Kev, From The North Bluff Above Marseilles IL. Whistling

 

  • Member since
    March 2015
  • 392 posts
Posted by phrankenstign on Monday, October 23, 2017 4:51 PM

I'm pretty much a seasonal runner now too.

I have small, permanent switching layout patterned after a 10' x 2' one in a book published by Atlas entitled "Six HO Track Plans You Can Build".  I changed it a little bit by adding a scissors crossing in the front.  A couple of times a month I'll mess about with it, but not too often.  I'll rearrange cars in different orders every once in awhile.  I've always wanted to connect it to a proper layout where the trains I put together can run free!  I can't do that with my switchyard.

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

FREE EMAIL NEWSLETTER

Get the Classic Toy Trains newsletter delivered to your inbox twice a month