Trains.com

153-C Contactor Solution ?

1040 views
7 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    January 2006
  • From: Florida
  • 2,238 posts
153-C Contactor Solution ?
Posted by traindaddy1 on Wednesday, November 19, 2014 8:16 AM

Well, here we go again!  (Attempted to post a  picture but my "@#$%$#&" computer is not cooperating)

Have several road crossings spanning three 027 tubular tracks.  When a train approaches from either direction on any of the three tracks, the crossing guards on both sides of the road come down.

Here's the problem: The crossing guards don't stay down long enough until the particular train completes its passing. They reset to the upright position. We are constantly adjusting and re-adjusting the contactors.

Question: To the best of your knowledge, is there a real (cost-effective) solution?

As always, many thanks.

  • Member since
    December 2001
  • From: Austin, TX
  • 10,096 posts
Posted by lionelsoni on Wednesday, November 19, 2014 8:21 AM

Yes.  Insulate an outside rail along the length of track where you want the crossing gate to operate.  Connect one terminal of the crossing gate to that insulated "control rail".  Connect the other crossing-gate terminal to the voltage supply that you want to use to operate the gate.  This supply should have its common connected to the outside rails of the track generally.  You can use the track voltage or a fixed accessory voltage.

Bob Nelson

  • Member since
    January 2006
  • From: Florida
  • 2,238 posts
Posted by traindaddy1 on Wednesday, November 19, 2014 10:49 AM

Bob:  

Thanks, so much for the reply.

I'll give it a try, that is, as soon as my hands warm up. Been a "bit" cool here in Orlando.

I always learn something about the hobby from you. Thanks, again.

  • Member since
    December 2005
  • From: Hopewell, NY
  • 3,230 posts
Posted by ADCX Rob on Wednesday, November 19, 2014 12:48 PM

Lionel has a good reference HERE for setting up insulated track sections.

Rob

  • Member since
    July 2014
  • 184 posts
Posted by Plate Rail on Wednesday, November 19, 2014 4:42 PM

For realistic operating gates or banjo signals, expand on the simple single insulated track method .  If room permits, insulate one outer rail on 4 or 6  adjoining sections  ( or an entire 36" section ) with the road crossing positioned mid way along the sections.  Wire this as you would the single section diagram.   In this way the gates drop before the engine reaches the crossing and raise well after the last car crosses.  Just like the real thing.

A three track crossing?  Multiply by 3.

Bruce

  • Member since
    July 2009
  • 951 posts
Posted by servoguy on Wednesday, November 19, 2014 5:24 PM

The best idea I have heard for making insulators for the modified sections of track is to use gasket paper which is available at a car parts store.  Vinyl tape does not work very well.

  • Member since
    January 2006
  • From: Florida
  • 2,238 posts
Posted by traindaddy1 on Wednesday, November 19, 2014 8:48 PM

Rob; Bruce; Servoguy:   Appreciate it. Thanks.

  • Member since
    December 2005
  • From: Hopewell, NY
  • 3,230 posts
Posted by ADCX Rob on Wednesday, November 19, 2014 10:35 PM

servoguy
The best idea I have heard for making insulators for the modified sections of track is to use gasket paper which is available at a car parts store...

Or the fish paper center rail insulators from scrap track sections.

Rob

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

FREE EMAIL NEWSLETTER

Get the Classic Toy Trains newsletter delivered to your inbox twice a month