David
I really enjoyed your video and the front coupler. Your layout is great with the space you have and helps me because I'm going to work with a small foot print also. What are the radius on the curves, they look small and seem to work well? Do you have a picture of your layout from above to see all the sidings and such?
Thanks
Train-ODave, Your layout functions smoothly, are you a special effects artist for the motion picture industry, or a mechanical engineer? Ralph
Dave.....I always enjoy both your video and pictures. I've got your youtube links saved and watch them over and over.
Jack
IF IT WON'T COME LOOSE BY TAPPING ON IT, DON'T TRY TO FORCE IT. USE A BIGGER HAMMER.
wm #734 Here's a question: Do you ever have to worry about the coupler mount touching the middle rail, causing a short?
Here's a question: Do you ever have to worry about the coupler mount touching the middle rail, causing a short?
Very impressive and a nice job on the coupler! I might have to try that. I just got a rotary snowplow and realized the only steam engine I had w/ an operating front coupler was the 1615!
Bob
Tucson, AZ (aka the Ol' Pueblo)
Home of the Mt. Graham & Arizona Eastern Boiler Shops
Here are some tips I came up with when running a LONG train.
1. Shorter heavier cars toward the front (longer lighter to the rear). If you are running steam, always use a heavy whistle tender or add weight to the tender.2. Lubricate all wheels (unless you are running modern needle point bearings)3. Back up the engine before going forward and start out slowly. This relieves the sudden tension that can cause engine wheel slippage and stringlining (just like real trains).4. The tighter the curve, the easier it is to stringline.5. If you have inclines, this will also reduce the number of cars that you can pull even if the engine isn't slipping. Stringlining will always occur at the first curve at the top of an incline, this is the most stressfull spot on any track layout.6. Repair couplers that uncouple under heavy load or lock them in place. 7. Sometimes when cars uncouple you will find that both couplers are still closed. This is the result of couplers that are not vertically aligned or are not rigid. This allows one coupler to ride up and over another coupler without uncoupling. Watch each coupler as the train goes by and you might see ones that are starting to ride up.
Here is a photo of what stringling looks like. Cars that are too light or under too much load will tip toward the inside of the curve. This almost always occurs toward the front of the train where the stress is greatest.
LocoPops Dave, Beautiful job. Congrats. Have you also altered the 2018 smoke stack? It look a little different.
Dave,
Beautiful job. Congrats.
Have you also altered the 2018 smoke stack? It look a little different.
I added couplers to the front of two Lionel modern 4-4-2s with the can motors in them. One I cut the cowcatcher off of and attached it via Erector set sheet metal attached to the underside above the front axle. Very rough looking it works o.k. but I would do it differently next time. 2nd one I started with 1/2" wide aluminum attached to the frame the two front axles attach to. It has an "S" bend going under the cowcatcher then bends 90 degrees going straight up to the dead coupler made out of cut open aluminum tubing in the shape of a short and fat letter "J". It basically rests on top of coupler of the front engine. The bottom part has electrical tape on it so it does not short out the track. If anyone can post it here I can email you pictures.
dsmith your front coupler looks a lot better than mine.
Modeling the "Fargo Area Rapid Transit" in O scale 3 rail.
Dave:
Thanks very much for the instructions and excellent photos. You make it sound so reasonably straight forward that I may try it myself; although it will probably be a bit more difficult than you suggest.
Thanks,
runtime
David,
Thanks for the info & the extra video!! The only cop&hobo I ever saw was the one where they just chase each other around an open gondola. I'll have to keep an eye out for one like yours.
Charlie
Very neat video Dave. The coupler bracket is very clever too. I may try that out. Thanks for posting the instructions! Looks quite a bit simpler than what I did with my 2025.
J White
dsmith I recently added a front coupler to a Lionel postwar 2018 steam engine so that I could couple to a second steamer. Then I tried to see how much both would pull and 23 freight cars seems to be about the limit on my 5' x 9' layout with 027 curves. Using all postwar freight cars, I put the heavy ones toward the front. After adjusting and repairing several of the freight car couplers, I achieved reliable operation. Here is a video showing the 2018 and 2035 2-6-4 steamers pulling 23 postwar freight cars. http://www.youtube.com/watch?v=0mCX8Lt06qA
I recently added a front coupler to a Lionel postwar 2018 steam engine so that I could couple to a second steamer. Then I tried to see how much both would pull and 23 freight cars seems to be about the limit on my 5' x 9' layout with 027 curves. Using all postwar freight cars, I put the heavy ones toward the front. After adjusting and repairing several of the freight car couplers, I achieved reliable operation. Here is a video showing the 2018 and 2035 2-6-4 steamers pulling 23 postwar freight cars.
http://www.youtube.com/watch?v=0mCX8Lt06qA
Oh man, I love it.
I had resisted even reading this thread because I couldn't bear to see a video of Lionel. Too bad they weren't AF engines, but no matter. I really loved the man on the box car, never saw anything like that before.
Before starting to restore my American Flyer stuff I few months back, I have been concentrating my efforts on my HO layout. Plenty of diesel consists but I have never double headed two steamers. You have inspired me to try it.
Incidentally, someone mentioned the need to sychronize the reversing units when double heading, Is that a problem?
Rich
Alton Junction
Dave, I noticed your video a few days ago before you even mentioned it here. I was one of the first 5 viewers. I like checking out YouTube and I search for "Lionel Trains 027." The visual impression of the two smoking locos is great.
You have a very neat layout and trains. Almost makes me want to get one of those Hydraulic Maintenance cars, fantasy or not.
Heck, just for your thinking, scale trains with "crew talk" are just as much fantasy. Out of the thousands of real trains I have watched in my life, never once have I heard engineers talking. And especially louder than the motor sounds the locomotive is making. Full scale and correct rivets, talking trains are as real as any fastasy operating train car. So you see Dave, even us 027 guys are at the pinnacle of prototypical realism.
I guess great minds think alike. I did what you did years ago, only with a plastic body steamer so I could easily cut away the cow catcher, make visual modifications and add the coupler to the front guide truck. The trouble I had, as mentioned, was with mechanical e-units. Now that I run DC, I should try this again as synching the locos would be no problem at all.
brianel, Agent 027
"Praise the Lord. I may not have everything I desire, but the Lord has come through for what I need."
dwiemer Dave, I enjoyed that video. The two locomotives looked great together. How did you mount the coupler? Dennis
Dave, I enjoyed that video. The two locomotives looked great together. How did you mount the coupler?
Dennis
Remove the front set of trucks (the 2 from the 2-6-4). The advantage of attaching the coupler to the front truck is that the coupler will follow the curves (see the second photo). At most hobby shops there is a rack of brass tubing and sheet brass. Purchase a sheet of brass that is .032 x 3/4" x 12". Attach the brass sheet to the bottom of the 2 wheel truck (I sued a flathead bolt and hotmelt glue) and cut and bend to shape. Obtain a metal coupler knuckle and drill a hole for a 2-56 bolt and attach to the brass sheet. Hold the knuckle closed by inserting a small screw where the closing pin would go. That's the basic idea, tolerances are very close so you might need to bend and rebend the brass sheet. It took me a couple of tries before I got everything in exactly the right postion. Finally wrap the brass sheet that is closest to the center rail with black electical tape and then paint all the exposed brass with flat black paint.
TCA#09-63805
Nice video, of a nice collection of postwar freights, headed by a nice looking pair of steamers.
Would really like more infor on how you did the front coupler conversion.
wyomingscout Very nice. You have really packed a lot on 5x9 layout. Would you give some info on the blue 'surfer' boxcar? Never heard of that one. wyomingscout
Very nice. You have really packed a lot on 5x9 layout. Would you give some info on the blue 'surfer' boxcar? Never heard of that one.
wyomingscout
http://www.youtube.com/watch?v=UeSC9HZdNVM
I really loved the video. If you put a coupler on the front engine and added a couple more cars, you could connect them all into a continuous ring
Terry Thomann Fredericksburg, Virginia That is me on the left. My brother got the train TCA 09-64381
Did this with two KLine pacifics. Hardest part is gettong the E-units in sync.
Our community is FREE to join. To participate you must either login or register for an account.
Get the Classic Toy Trains newsletter delivered to your inbox twice a month