please explain why a dedicated experimental freight locomotive had
passenger diameter drivers 77" did they expect it to work i mean thats a handicap right out of the gate
thomas81z Please explain why a dedicated experimental freight locomotive had passenger diameter drivers 77"? Did they expect it to work? I mean thats a handicap right out of the gate!
The Pennsy was aiming for a dual-purpose locomotive.
Some discussion here:
https://cs.trains.com/ctr/f/3/p/271182/3079799.aspx?page=17
Regards, Ed
thomas81zdid they expect it to work
thomas81zplease explain why a dedicated experimental freight locomotive had passenger diameter drivers 77" did they expect it to work i mean thats a handicap right out of the gate
Everyone that designs and builds something, believes it will perform to the level they designed it for - or they would not have built it.
Reality can be different.
Never too old to have a happy childhood!
If the PRR hadn't wasted years and money building new, unproven locomotives, they could've ordered good diesels in a systematic plan and not had to order "everything from everybody" because they were years behind others.
PRR wasn't the only road to wind up with a hodgepodge of diesel models on their roster because they started late. it may have been more visible because of the rather spectacular failure of playing catch-up with somewhat exotic steam designs that came about because they stuck with K4, L1 and other old designs.
BackshopIf the PRR hadn't wasted years and money building new, unproven locomotives, they could've ordered good diesels in a systematic plan and not had to order "everything from everybody" because they were years behind others.
B&O was one of the leaders in dieselization and they had some units from each of the manufacturers that existed in the late 40's and early 50's. The started with EMC EA's, EMD FT's and after the War they got Alco FA's and FB's, they also go Baldwin sharknoses. In yard power they got power from every manufacturer, including Fairbanks-Morse, though they never got any FM road power.
After several years of use the B&O/C&O the maintenance stats were clear and most locomotive purchases were from EMD until the formation of CSX in 1980.
Overmod Backshop If the PRR hadn't wasted years and money building new, unproven locomotives, they could've ordered good diesels in a systematic plan and not had to order "everything from everybody" because they were years behind others. And you don't think B&O, as poor as a bunch of church mice compared to the mighty PRR, didn't have their share of experiments -- the first true high-speed simple articulateds, the first simple 4-4-6-2 compared to ATSF's first Mallet 4-4-6-2, the first of the Duplexes with many of the 'warts' of the Q1, four sets of Hudsons with a couple as high-speed a locomotive as PRR built at the time; a lovely 4-4-4 express locomotive (and a Cor-Ten train for the high speed locomotives to pull), ALL those Emerson watertube boxes, an experiment with over seventy front-end stokers that ended up so bad the report of it was scotched on a grand scale, and of course a Besler constant-torque that got as far as the boiler and a couple of motors built for testing.
Backshop If the PRR hadn't wasted years and money building new, unproven locomotives, they could've ordered good diesels in a systematic plan and not had to order "everything from everybody" because they were years behind others.
And you don't think B&O, as poor as a bunch of church mice compared to the mighty PRR, didn't have their share of experiments -- the first true high-speed simple articulateds, the first simple 4-4-6-2 compared to ATSF's first Mallet 4-4-6-2, the first of the Duplexes with many of the 'warts' of the Q1, four sets of Hudsons with a couple as high-speed a locomotive as PRR built at the time; a lovely 4-4-4 express locomotive (and a Cor-Ten train for the high speed locomotives to pull), ALL those Emerson watertube boxes, an experiment with over seventy front-end stokers that ended up so bad the report of it was scotched on a grand scale, and of course a Besler constant-torque that got as far as the boiler and a couple of motors built for testing.
It's worse than that. PRR had wanted a pair of E's prior to 1941, and had to delay getting them until committing to the T1 production orders. (Of course you know my opinion on why the T1 was 'spun' as such an abject, colossal failure when it really wasn't...)
In fairness, a lot of the late PRR development appeared to be geared towards handling heavy wartime traffic better in a time of resource constraints. Consider the amount of copper that would go into the 1943 electrification expansion vs. the amount that would have been available through the WPB for diesels. Much of the PRR experimentation in the '30s (Steamotive, the Steins locomotives, the proposed E8 Atlantic) was oil-fired; oil that became scarce in the early war years thanks to the 'happy times'. So we got duplexes and mechanical turbines as the Great Thing, which had its rationale pulled out by VJ day, and most of the duplex advantage either gone by '47 or replaced by diesels as the place to put the motive-power investments.
The reports on that F unit by the motive-power department survive at the Hagley and make interesting reading. So do the announced reasons why the V1 was not built, either in the mid-Forties or as briefly revived in 1947.
Two great comments, thanks,
Clessie Cummins, in his biography, mentions that there was serious interest at PRR in internal-combustion power, both small and the promise of large, up until 1927. That year, the major 'champion' of oil-engine power supposedly died, and with it the interest in large or fast locomotives vs. steam.
This if true mirrors the problem J.P. Morgan had when his 'expert' on railroad practice died suddenly in 1906, and there was no one like him for a replacement.
This would help explain the relative lack of interest in high-speed motor trains, and why the PRR's initial 'answer' to lightweight high speed was a Milwaukee-style Atlantic on steroids...
There is also that curious business of the Bowes drive. By 1947, PRR had revived the V1 turbine as a high-speed design using this, instead of mechanical transmission. At about this same time, Ingalls Shipbuilding was starting to promote a 2000hp passenger locomotive that we now know was designed to use this same type of transmission. It seems peculiar that PRR, in their haste to dieselize with decidedly weird types of power -- but not the Essl design from Baldwin -- did not take up this design at least to test it.
I'm not a "serious PRR historian" but that timeframe coincides with the electrification of the NEC. Even the PRR had limited resources and designing and building the electric locomotives probably took up much of Altoona's engineering time. That's also why they missed the whole Superpower generation of steam, except for J1, courtesy of the C&O. They didn't have the man-hours and they had a glut of older steam that was displaced from the NEC. Most don't know that Wilmington was originally a steam shop.
Backshopthat timeframe coincides with the electrification of the NEC. Even the PRR had limited resources and designing and building the electric locomotives probably took up much of Altoona's engineering time.
So PRR went into the Depression with not only electrification of the dense-traffic areas, but an enormous glut of rapidly-obsolescent power. Note that they could only finish the NEC south to Washington with RFC funds, and never got the important part of the main (over Horse Shoe and around Pittsburgh) electrified at all.
What I think happened instead was that PRR got entranced with the wrong 'modern' technology. Once they get clear of the worst of the two Depressions, they've spent 3.5 million iron men on, basically, subsidizing Baldwin, Alco, and Lima to build an enormous Buck Rogers rocket ship of a 'Locomotive of the Future!' that can't even get through Pittsburgh station, they're watching the Steamotive development with great interest, and... as we have already observed... when they go to design other 'modern' power they went straight to low-augment overweight weirdness, to get measurably "better capacity" than they had.
Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!
Get the Classic Trains twice-monthly newsletter