Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
FEBT Rockhill Sept. Work Session Report
Edit topic
Updated your discussion topic below.
Subject
Enter a subject for your topic. Maximum 150 characters.
Post Body
Enter your post below.
Report on FEBT Rockhill Work Session of <br />September 27-28, 2003 <br />Report by Lee Rainey <br /> <br />The eighth Rockhill work session of 2003 was held Saturday and Sunday, September 27-28, 2003. We had 25 volunteers on both days, making it our largest session ever. Fred and Kevin Kuhns of Memphis, TN again took the distance prize, narrowly edging out John and Barbara Morgan from Ontario. <br /> <br />Those participating included Fred Kuhns, Kevin Kuhns, *** Ullery, Dean Mellander, Charlie Wootton, Jim Bacon, Chris Coleman, Pat Coleman, Ginny Rainey, John Morgan, Barbara Morgan, Alan Cupp, Jim Vliet, Bill Adams, Shawn Stauffer, Tom Kozub, Tom Diehl, Dennis Marquette, Wade Woodcock, Bob Goldby, Bud Goldby, Dan Cupper, Jim Sucke, Doug Linebaugh, Steve Jacobs, Don Schultz, Jane Clarke, Pete Clarke, Reggie Arford, and Lee Rainey. <br /> <br />TRACK 3 <br />The crew finished inserting new ties into the trenches already dug, completed the spiking of all new ties, and made a start at leveling and aligning the track. In the meantime, an RTY crew put the switch at the south end of the track back into operation. The session ended by running the M-7 over all the new track to demonstrate what the crew had accomplished. <br /> <br />ELECTRICIAN'S SHOP <br />Working around torrential rains Friday and Saturday night, the crew installed the roof eave trim and south-end battens that had been prepainted at the last session. Final work was done on several windows. The surface preparation was completed and the building received a white primer coat on Saturday and a finish red coat on Sunday. <br /> <br />GLASS CREW <br />The glass crew as always was busy salvaging glass for the repairs in the main shops. <br /> <br />MAIN SHOPS <br />Some work was done at the double door of the main shops to prepare to insert the repaired sash. Chris Coleman finished installing this sa***he day before the Spectacular. <br /> <br />All in all, with the help of the largest crew we have ever had, we met our two stretch objectives and finished our showcase projects for the Spectacular. It is quite a sight to see 25 people swarming over the yard working on various tasks and it's a sight we hope to repeat in the future! <br /> <br />The final East Broad Top Rockhill work session of 2003 will take place on Saturday and Sunday, November 1 and 2. <br /> <br />http://www.febt.org
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
E-mail Subscribe
Check the box below if you want to receive e-mail notifications when replies are made to this thread.
Receive notifications
Update Discussion Topic
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy