I'm not sure why they built the trestle that way.  Typically, there would be diagonal timber bracing from bent to bent on the outer pilings, and also across the width of each bent, on each side of each bent.  I assume that this visible part of the trestle has never been filled, and that they drove the pilings into existing soils, so there would be no need to compact that soil.

But going back to the creation of new fills by constructing a fill trestle:  I think there is a good chance that this type of fill was left uncompacted with the idea that it would just settle with the rain, and that would be good enough.  I have seen photos showing the process called "jetting" whereby a high pressure water hose was used to break up the fill chunks and make the fill material flowable.  That has long been considered to be a form of compaction.  But it leaves the soil fully saturated, and such a degree of saturation means that the soil is too wet to properly compact with horses, sheeps' foot rollers, vibratory drum rollers, steel track dozers, or vibratory plate compactors.

To use any of means of compaction, the saturated soil would have to be left to dry out for many months.  And even then, the whole height of the fill would be in place, and any compaction would be limited to only the top couple feet.  Proper compaction would require compacting one 6" fill layer at a time.  So if the fill was 60 feet tall, it would require adding and compacting the fill in one layer at a time, so that would be 120 individual layers of fill.   

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Sunday, November 13, 2022 7:12 PM

Euclid
For new track, the fill trestle was of relatively light material because it did not have to last long, and it was typically only supporting narrow gage dump cars and locomotives. 

 

The following crude sketch shows what they did here in 1911  to grade separate the mains through our downtown. Roughly raising the track 10 feet, and dropping the pavement 5.

 

Based upon other items present in the source image, I'd guestimate these timbers about 16" square.

Absence of cross bracing would seem to accomodate compaction?

  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Sunday, November 13, 2022 6:28 PM

Convicted One

I believe that one of the things that took me off on a tangent was when someone posted earlier about burying a wooden "trestle" as part of an engineered fill design, the vision that came to mind was of a trestle sporting horizontal and diagonal braces between the verts. And my biggest concern was with how those braces would span, and stand in resistence to settling and compaction.

What I've since seen, "trestles" that more resemble rows of 16" square timbers driven vertically into the ground like piles,  each row spanned by a similarly  dimensioned  horizontal "header" that the track bed rests upon....gives me less reservation.

 

I think I understand what you are saying.   You had understood the filled trestle concept as being a structural combination of earth fill and a timber structural framework.  So both the earth fill and the embedded timber framing would work together to increase the ability of the fill to support a load.  It would be similar to how steel rod is embedded into wet concrete in order to make the concrete stronger. 
 
But in this buried trestle concept, there is no purpose for the trestle besides allowing a train of dump cars to span the low ground being filled, and gravity dump straight down into the low ground. 
 
For new track, the fill trestle was of relatively light material because it did not have to last long, and it was typically only supporting narrow gage dump cars and locomotives. 
 
A distinctly alternate function of burying trestles in earth fills was for already existing railroads.  In this case, the trestles were filled for the purpose of eliminating their constant need of maintenance and their being a fire hazard that can cause a loss of service and/or a loss of lives.  However, in the earlier period of railroad construction, using the most primitive means of earthmoving, building wooden trestles was cheaper than building earthen fills. 
 
But as earthmoving art advanced with power equipment, railroad companies also filled their trestles just to get rid of them.  Here again, advantage was taken of the pre-existing trestle for supporting the dump cars and dumping directly into the fill area.  But these pre-existing trestles were not the rickety construction of narrow gage dump trestles built to advance new track over virgin ground.  The pre-existing trestles were built to main line standards to handle full time train traffic.  
 
I am not aware of any reason why a such a filled trestle would be partly motivated by making filled trestle stronger or more durable than just the un-filled trestle alone, but there may have been such a motivation in some cases. 
 
  • Member since
    January 2001
  • From: MP CF161.6 NS's New Castle District in NE Indiana
  • 2,148 posts
Posted by rrnut282 on Sunday, November 13, 2022 5:55 PM

I seem to recall a section of the original Santa Fe in callifornication has a fill on top of a layer of straw so the entire fill floats.  

I was rebuilding a city street a couple of years ago and found a series of logs sitting cross-wise to the road in a low (soft) spot.  

Mike (2-8-2)
  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Saturday, November 12, 2022 3:00 PM

I believe that one of the things that took me off on a tangent was when someone posted earlier about burying a wooden "trestle" as part of an engineered fill design, the vision that came to mind was of a trestle sporting horizontal and diagonal braces between the verts. And my biggest concern was with how those braces would span, and stand in resistence to settling and compaction.

What I've since seen, "trestles" that more resemble rows of 16" square timbers driven vertically into the ground like piles,  each row spanned by a similarly  dimensioned  horizontal "header" that the track bed rests upon....gives me less reservation.

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Saturday, November 12, 2022 2:59 PM

northeaster
Euclid: Back in the 1960's, when I was young and living on a hill farm in remote Vermont, my Road Commissioner described to me how he would fix a dirt road going through a swampy section: cut down a bunch of spruce trees and spread the branches along the wet road bed and cover it with a gravel/soil mix. The new surface would "float" on the bed of spruce branches and do just fine.

Right up to the time that a heavy load gets on top of the floating surface and sinks it. 

Never too old to have a happy childhood!

              

  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Saturday, November 12, 2022 2:30 PM

northeaster
...how he would fix a dirt road going through a swampy section...

When they were building I-81 through my area, they had a spot that was swampy, but apparently thought they could deal with it.

There's still a large piece of construction equipment buried in the muck...

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    May 2010
  • 189 posts
Posted by northeaster on Saturday, November 12, 2022 2:16 PM

Euclid: Back in the 1960's, when I was young and living on a hill farm in remote Vermont, my Road Commissioner described to me how he would fix a dirt road going through a swampy section: cut down a bunch of spruce trees and spread the branches along the wet road bed and cover it with a gravel/soil mix. The new surface would "float" on the bed of spruce branches and do just fine.

  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Saturday, November 12, 2022 11:01 AM

Compaction is important for building hard surfaced roadways because their asphalt or concrete pavement will break up with any differential settlement which is bound to occur with uncompacted fill.  It may be somewhat less important for railroads because their ballast and trackwork spreads the wheel loading out over a broader area than road loading.  Compaction is vital to building foundation footing support, and ultra-critical to dam construction.  Proper compaction is performed by filling in relatively thin layers of say 6”, and then compacting just that layer.  Then that process is repeated one layer at a time until final grade is reached.  The uncompacted layer is called a “loose lift.” 

Compaction cannot be properly performed by simply adding enough weight to the height of a high fill, such as using a heavy locomotive to run over track laid on say 20 feet of loose fill.  The result will be the greatest compaction at the top and successively less compaction as the depth increases.  Even if you used a heavy enough locomotive to achieve adequate compaction at the base of the fill, it will be progressively over-compacted in the higher regions of the fill.  The over-compacted fill will slowly rebound over time and raise the finish grade. 

Another factor is the penetration of ground freezing in winter.  As the ground freezes, its water content expands and increases the fill volume.  As the frost penetrates deeper, the finish grade rises with a force that will lift buildings, trains, and highway traffic higher.  The seasonally rising and falling soil may not do so uniformly due to variations in the frost action due to variations in the ground cover or soil type.  In any case, soil that rises in winter will be “fluffed up.”  Then as it resettles in summer it will not return to its original compacted density that it had achieved by being properly compacted with equipment.

The lifting and settling of frost affected soil will also vary as the soil and its conditions vary.  So, the lifting and falling finish grade may not be uniform over a given area.  That is why you see wooden shims driven under the tie plates of railroad track in winter to lift the rails in order to match their degree of frost lift that occurred nearby.  So, buildings are not allowed to have their foundation footing supported by soil that will freeze from winter frost penetration.   But, roads and railroads will rise and fall with the ground frost action.   

There is another problem for roadbed fill stability besides compaction.   That is the type of soil under the intended fill.  Pioneering railroad routes encountered lots of peat bogs and similar organic soil.  These soils never stabilize.  Not only are they fundamentally un-compacted in situ, but they are also incapable of being compacted.  So, if you place a fill on these organic soils, the weight of the fill alone is likely to cause settling by displacing the underlying organic soil.  The organic soil will push out at each side and heave upward in response to the weight of the fill.  It is like stepping on toothpaste. 

The only way to build a successful fill on these organic soils is to remove them down to stable sub-soil and replace them with good fill material.  This is called soil correction.  It can add considerable cost because the organic soil might be 10-40 feet thick.  Furthermore, removing the organic soil often requires digging in water because organic soil is often found in boggy areas.  And then once the organic soil is removed, you have open water to receive the new proper fill. 

Filling the good material into water makes it impossible to properly compact it.  Certainly you can’t fill in lifts and compact each one, because it would require working under water.  The only way to overcome this problem is to fill into the water with the most ideal granular material.  This type of material will displace the water as it falls into place and become stable as the dry fill adds weight as it is place atop the wet fill. 

This type of soil correction was mostly out of the question in the 1800s.  So the new fill was simply laid on top of the organic and saturated soil.  When the fill sank, more was added.  Generally a lot of earthmoving continued after the railroad was built.  Dirt was hauled to low areas on trains of flatcars and dumped off the sides.  When the steam shovel era dawned, the steam powered Lidgerwood Unloader was invented.  It was a big cable winch on a special car that dragged a sort of “V” plow down the decks of a train of flatcars, and the plow pushed the dirt off of the cars on each side.    

With original railroad beds, there are stories of railroad companies trying to stabilize sinking fill by dumping logs and trees into the morass until the sinking stopped. 

 
 
 
 
  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Saturday, November 12, 2022 8:40 AM

Murphy, I was 28 in 1960 and would work for Santa Fe until 1990 when I was offered a buyout that was so good, I could not refuse. But I would do it all again if I were young once more.

  • Member since
    May 2005
  • From: S.E. South Dakota
  • 13,569 posts
Posted by Murphy Siding on Friday, November 11, 2022 11:38 PM

diningcar

The BNSF Southern Transcon is currently the fastest and most reliable route between Pacific water and Chicago; and it became this way by many changes from original construction; like Abo Canyon recently. Without a doubt the greatest contributor was the Williams - Crookton line change in the Arizona mountains in 1959 -60. 

The original 1882 construction was 49 miles of single track, with a second track created (in steps) in the 1920's. Some of the segments had 2.6% grades and curves of up to 10 degrees. It was a 20 MPH operation in many locations. 

The relocated line was 44 miles in length, with maximum 1% grades and one degree curves. To accomplish these parameters there were rock cuts up to 110 feet deep, with the longest being 13,000 feet. The highest fill was 122 feet and the longest was 6000 feet.

The design also avoided slack action. From Williams Junction the line descended  32 miles on 1% grade where it intersected a 0.85 % ascending grade. This was designed with a 10,000 foot vertical curve making the change .085 per 100 feet. 

It was superelevated with spirals on each curve end which would permit 70 mph freight trains and 90 mph passenger trains. 

The most amazing thing is that this was all accomplished in sixteen months. The contractor - Morrison-Knudsen - worked two nine-hour shifts six days a week. The first train - Santa Fe's The Chief went over the line on December 19, 1960.

I had the honor and pleasure of being one of Santa Fe's engineering technicians who set all the stakes and control points for the contractor.

  

 

 

) t

That first train went over the line the day I was born. Cake

Thanks to Chris / CopCarSS for my avatar.

  • Member since
    January 2019
  • 1,686 posts
Posted by Erik_Mag on Friday, November 11, 2022 9:13 PM

As you noted, dealing with settlement of a fill underneath a railroad is easier than dealing with settlement under a paved road. I have a vague recollection reading that fills under RR tracks take about 5 years to fully settle.

OTOH, I do remember seeing a picture of an NP Yellowstone lying on its side with explanation that it was being used to help compact a filand tipped over when passing a soft spot. A million pound steam locomotive could be counted on to produce a robust vibration of he subgrade.

  • Member since
    March 2011
  • 188 posts
Posted by dpeltier on Friday, November 11, 2022 2:52 PM

Convicted One

And, I'd think that the framing members would really interfere with compaction.  Isn't "compaction" the alpha and omega of site prep?

Not in the 1910's and earlier. I don't believe compaction wasn't really a common practice until the 1930's.

Compaction does two things: it reduces initial settlement, and it increases soil strength. I'm not sure how well the strength part of that was understood prior to the genesis of modern soil mechanics in the 1920's. The settlement piece was probably better understood but just not that critical for railroad track.

I recall reading the following claim in some engineering text, although I can't recall which one and I can't vouch for it's accuracy:

Railroad engineers noticed early on that high fills across a valley would develop a sag in the middle over time, as the highest part of the fill (in the middle) settled more. They responded by building fills with a camber, so that it would eventually settle into a smooth surface. (Yes, there probably was some differential settlement... In the days of 20-man section gangs,  it was no big deal to occasionally tamp up the low spots.) This worked fine for gravel roads as well. However, as paved rural highways became more common, this approach did not work so well, as the pavement would crack when settling. So highway engineers, taking advantage of new equipment that hadn't existed before, adopted compaction as a standard practice.

Dan

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Friday, November 11, 2022 2:52 PM

Now I'm starting to wonder if perhaps in those documentaries where you see an imported fill earthen dam start to fail  with a small trickle just before the deluge, if perhaps there might be a rotting wooden trestle nested within?

Whistling

  • Member since
    December 2001
  • From: Northern New York
  • 25,020 posts
Posted by tree68 on Friday, November 11, 2022 1:06 PM

I'd imagine there was a sort of a natural compaction of the dirt, falling (at first) some 100' in some cases.

I've seen pictures of the process as well, but don't recall where.

LarryWhistling
Resident Microferroequinologist (at least at my house) 
Everyone goes home; Safety begins with you
My Opinion. Standard Disclaimers Apply. No Expiration Date
Come ride the rails with me!
There's one thing about humility - the moment you think you've got it, you've lost it...

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Friday, November 11, 2022 12:28 PM

Euclid
As such, gradual settling will occur.  When it does, they just haul more fill to the site and build up the the settled areas.   Therefore, many fills are being gradually perfected over time.  

I found a wonderful picture of them performing the trestle-fill operation in my own town back in 1911 when the mains were grade seperated. Unfortunately I do not hold the rights to said picture, and do not want to set off  the IP alarmists.....but it's a great picture showing the fill operation in progress.

SO yeah, it obviously was "done that way"...but again I personally don't have a lot of confidence that the rot, the settling, and the refilling will happen at uniform rates.  Heart wood rots  differently from  the layers around it in my experience, open grain versus closed, etc etc too many variables.

But, as I mentioned earlier, most of the "bouncing track" instances that I have witnessed personally, are on those raised embankments....particularly where they abutt bridges and other viaducts....so perhaps those buzzards ARE coming home to roost.

 

And it never really ocurred to me previously why when I  periodically see the thermite crews at work, it was usually on the raised embankments right next to one of those bridges. So, this is a definite "ah haaa" moment for me. Cool

  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Thursday, November 10, 2022 5:03 PM

Convicted One

 

 
Murphy Siding
, and as that slowly happened, the fill would work it's way into the voids.

 

If I was a deep pocket, I don't know how cozy I would be making the assumption that the settling and filling would happen uniformly?

 

The filled dirt would work its ways into voids left by rotting timbers over time.  But it is not much of a practical problem.  Even if a void forms, that does not mean that gravity will readily fill it with fill dirt from above, and work the void upward like a sink hole that finally breaks through the surface. 

Soil that has filled around the pole that evenually rots has a fair amount of bridging ability, so many formed voids will simply remain undisplaced with setting fill. 

Also, this was in the 1880-1920 era when filling trestles was most common.  People then were not necessarily looking for the perfect solution.  The effect of leaving sizable voids is not much different than simply failing to compact the original fill with anything beyond horses or related equipment.  

As such, gradual settling will occur.  When it does, they just haul more fill to the site and build up the the settled areas.   Therefore, many fills are being gradually perfected over time.  

  • Member since
    December 2006
  • 1,754 posts
Posted by diningcar on Thursday, November 10, 2022 2:49 PM

The BNSF Southern Transcon is currently the fastest and most reliable route between Pacific water and Chicago; and it became this way by many changes from original construction; like Abo Canyon recently. Without a doubt the greatest contributor was the Williams - Crookton line change in the Arizona mountains in 1959 -60. 

The original 1882 construction was 49 miles of single track, with a second track created (in steps) in the 1920's. Some of the segments had 2.6% grades and curves of up to 10 degrees. It was a 20 MPH operation in many locations. 

The relocated line was 44 miles in length, with maximum 1% grades and one degree curves. To accomplish these parameters there were rock cuts up to 110 feet deep, with the longest being 13,000 feet. The highest fill was 122 feet and the longest was 6000 feet.

The design also avoided slack action. From Williams Junction the line descended  32 miles on 1% grade where it intersected a 0.85 % ascending grade. This was designed with a 10,000 foot vertical curve making the change .085 per 100 feet. 

It was superelevated with spirals on each curve end which would permit 70 mph freight trains and 90 mph passenger trains. 

The most amazing thing is that this was all accomplished in sixteen months. The contractor - Morrison-Knudsen - worked two nine-hour shifts six days a week. The first train - Santa Fe's The Chief went over the line on December 19, 1960.

I had the honor and pleasure of being one of Santa Fe's engineering technicians who set all the stakes and control points for the contractor.

  

 

  • Member since
    December 2001
  • From: Denver / La Junta
  • 10,820 posts
Posted by mudchicken on Thursday, November 10, 2022 2:48 PM

The "scoop" Bucky is talking about is the ubitquious "Fresno Scraper" that started in 1883 and were still in use past WW1 until Holt Tractor/CAT really got into the picture. They could be anything from half a pony-keg up to half a 55 gallon drum in size. They contributed much to later bulldozer and motor grader designs plus the horses' hooves added excellent compactive effort. 

Railroad standards have evolved over the years as railroads and regular civil engineers began to better understand soil properties and slope stability issues. 1:1 slopes gave way to 2:1 and now 3:1 in places. It all depends on how soils hold together  and the mix of fines to everything up to cobbles in the made fill. Gap graded materials tend to fail depending on what you've got.

Jeff: intimately familiar with the BCR&N west of Superior. Kinda sad what happened there. (Uncle Pete demanded a siding on the resulting shortline and would not allow the shortline to interchange at Superior not helping was the fact was UP/CNW did not own the underlying R/W and the people that did were not railroaders - ugly/greedy arrangement that ulimately killed the line.)

I will come back and verify the construction dates and original railroads. Not hard to do if you know what ICC GO-20 is and where to find those submittals. The ROCK lines were all part of the fabled CRIP "bow and arrow country" that were all low density lines that were not high speed and not well taken care of.

UPDATE:

BNSF/MILW = McGregor & Sioux City Ry. (Graded 1878) taken over by Sioux City and Dakota Railway in 1879 and completed.

CRIP (abandoned line) Cedar Rapids, Iowa Falls and Northwestern RR (BCRN of Iowa) 1886......Abandoned 12-29-70 FD-26470...removed by 1973

Mudchicken Nothing is worth taking the risk of losing a life over. Come home tonight in the same condition that you left home this morning in. Safety begins with ME.... cinscocom-west
  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Thursday, November 10, 2022 1:31 PM

Murphy Siding
, and as that slowly happened, the fill would work it's way into the voids.

If I was a deep pocket, I don't know how cozy I would be making the assumption that the settling and filling would happen uniformly?

  • Member since
    March 2003
  • From: Central Iowa
  • 6,901 posts
Posted by jeffhergert on Thursday, November 10, 2022 1:20 PM

After my post, I looked up some info.  The BCR&N reached Sioux Falls October 25, 1886.  It was under control of the RI at that time.

Speculation at the time was that RI, through BCR&N, was going to build to Bismarck ND and a connection to the NP.  This was through the line that ended at Watertown SD.  The Sioux Falls branch came off this line at Ellsworth MN.  IIRC, a bridge went out in the early 1970s and the branch, now originating out of Estherville IA was cut back to Rock Rapids IA.

The line from Estherville to Superior IA is still operated by UP.  The line west of Superior is gone.  See this discussion from days of yore. https://cs.trains.com/trn/f/111/t/229115.aspx

Jeff

  • Member since
    May 2005
  • From: S.E. South Dakota
  • 13,569 posts
Posted by Murphy Siding on Thursday, November 10, 2022 12:44 PM

This is a reply to several posts on this thread.

The line is in Sioux Falls SD next to Southeastern Avenue, north of 41st street. The Milwaukee line is probably graded the same as it was when built. The Rock Island line went out in the 70s. It makes sense that a Milwaukee main line was built to higher standards than a Rock Island branch line. It seems like RI got into the state after the better routes were taken.

Thanks to Chris / CopCarSS for my avatar.

  • Member since
    May 2005
  • From: S.E. South Dakota
  • 13,569 posts
Posted by Murphy Siding on Thursday, November 10, 2022 12:36 PM

My first thought was that the wood underground would rot away slower than wood out in the open, and as that slowly happened, the fill would work it's way into the voids.

Thanks to Chris / CopCarSS for my avatar.

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Thursday, November 10, 2022 11:21 AM

BaltACD
I would imagine that operating trains continually over the trestle that has been made into a fill would aid in the compaction process as the trestle structure will be subject to vibratory forces with every train the moves across it.

Perhaps those  are the same vibratory forces and collateral subsidence that induce "bouncing" track structure?

 

Perhaps that helps explain why I see the MOW guys so frequently with their little thermite doo-hickey in the vicinity of the   yellow arrow?  Pirate   (CWR)

  • Member since
    June 2009
  • From: Dallas, TX
  • 6,952 posts
Posted by CMStPnP on Thursday, November 10, 2022 10:26 AM

I have to comment though since one of the railroads mentioned has a pretty good reputation in my view.    Milwaukee road drained a swamp in Menominee valley in Milwaukee and built a series of drainage / shipping canals as well as a railroad shop complex on it.    They also did pretty well traversing more than one swamp West of Milwaukee on the way to the Twin Cities and in Brookfield with the branch to Waukesha.     I would venture to guess they were fairly good about building on swamp land.

  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Thursday, November 10, 2022 10:19 AM

BaltACD

 

 
Convicted One
 
Euclid
the rotting will cause fill subsidence over time, 

That was my first thought. I guess my surprise is with the expectation that subsequent remedial action will be "little".  I mean if you are talking about a 25' fill, you are gonna have trestle members rotting 25' beneath the surface,

And, I'd think that the framing members would really interfere with compaction.  Isn't "compaction" the alpha and omega of site prep?

 

I would imagine that operating trains continually over the trestle that has been made into a fill would aid in the compaction process as the trestle structure will be subject to vibratory forces with every train the moves across it.

My understanding is that oxygen is required in the decay/rotting process.  The deeper timbers get buried in the fill, the less oxygen is available to sustain the process. 

 

 
That is very true.  Trains will deeply compact the fill over time, especially due to their impact vibrations from rail joints.  And timbers buried deep will have rot resistance due to a lack of oxygen.  Either too little oxygen or too little moisture will impede rotting.  That is why wooden fenceposts first rot through at ground level where the combination of oxygen and moisture is just right.  
 
C.O., You are right that compaction is the alpha and omega of site prep for structures.  But nevertheless, it has always been compromised, especially going back in time of earlier railroad construction.  But while the excavating/grading I describe was state of the art back then, today it has been replaced by motor scrapers, push cats, backhoes, off-road dump trucks to handle the cutting and hauling.  Then the material is unloaded at the fill site, and pushed into the fill with a dozer, and graded out into 6" loose lifts, with each lift being power compacted to the compaction specification, which is tested periodically to make sure it complies.  
 
So today, a railroad fill would be thoroughly engineered from top to bottom.  Not only would compaction be assured, but also the soil would be of the proper grade of soil type and moisture content to assure that the soil is ideally compactable.  A blend of gravel and some clay content is ideal.  Soil composed of pure clay is horrible, and so is organic soil such as black dirt topsoil. 
 
 
  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Thursday, November 10, 2022 9:21 AM

Convicted One
 
Euclid
the rotting will cause fill subsidence over time, 

That was my first thought. I guess my surprise is with the expectation that subsequent remedial action will be "little".  I mean if you are talking about a 25' fill, you are gonna have trestle members rotting 25' beneath the surface,

And, I'd think that the framing members would really interfere with compaction.  Isn't "compaction" the alpha and omega of site prep?

I would imagine that operating trains continually over the trestle that has been made into a fill would aid in the compaction process as the trestle structure will be subject to vibratory forces with every train the moves across it.

My understanding is that oxygen is required in the decay/rotting process.  The deeper timbers get buried in the fill, the less oxygen is available to sustain the process. 

Never too old to have a happy childhood!

              

  • Member since
    April 2007
  • 4,557 posts
Posted by Convicted One on Thursday, November 10, 2022 8:32 AM

Euclid
the rotting will cause fill subsidence over time,

That was my first thought. I guess my surprise is with the expectation that subsequent remedial action will be "little".  I mean if you are talking about a 25' fill, you are gonna have trestle members rotting 25' beneath the surface,

And, I'd think that the framing members would really interfere with compaction.  Isn't "compaction" the alpha and omega of site prep?

  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Thursday, November 10, 2022 7:15 AM

Erik_Mag

 

 
tree68

One extremely large fill on the MA&N probably still has a trestle under it.  The chief reason for building the trestle was to reach a spot on the other side from which fill could be obtained.

 

 

A perhaps even more important reason was that it was easier to create the fill by dumping carloads of dirt from the trestle, than doing it lift by lift with material carted in. One strong incentive to cover a trestle with fill was to elminate the possiblity of the trestle burning down.

FWIW, the Central Pacific had a number of trestles that were filled in after the transcontinental line was finished.

 

That was the reason for filling the trestle.  If filled without a trestle, dump cars would have to be dumped one by one at the starting edge of the fill, and then horse/ scraper scooped up, skidded out into the fill area, and dumped one scoopful at a time.
 
For a new line, the trestle had to be built from scratch with considerable labor and materials, even though the materials and construction were of low quality because they had no purpose after the fill was made.  Essentially the temporary trestle was like a template for placing the dirt fill without any need for spreading it and grading it in lifts.  As the trestle was filled, the fill soil was often water jetted to consolidate it as a form of compaction.  
 
Also if the fill was dumped at the edge of the fill zone the dump cars would typically arrive in a short train, so the dumping would need to extend the train-length back from the edge of the fill zone. 
 
In other cases, there were projects just to improve existing mainlines, which often included filling existing trestles that were built as permanent structures when the track of first laid.  For this work, standard gage flat cars were often used to transport the fill soil because the track was in place as standard gage.  The flat cars were bridged between them with an iron sheet to make a continuous surface to hold the fill being carried.  Then to dump, a Lidgerwood unloader would be used to cable drag a big “V”-plow down the length of the train and cast the soil off of each side of the flatcars.   The Lidgerwood had a steam powered drum winch permanently mounted on a railcar, and taking piped steam from the locomotive handling the dump train to power the winch.
 
Here is a Lidgerwood Unloader illustration.  In this case the unloader plow is biased to cast fill material off just one side of the fill train.  Note that these cars flatcars have low sides to better contain the fill soil.  The plow apparently lifts the soil up and over the lows car sides.  Also, the low sides guide the plow so it can't accidentally run off of the side while being winched ahead.  You can see the Lidgerwood winch car next to the locomotive:
 
  • Member since
    January 2014
  • 8,221 posts
Posted by Euclid on Thursday, November 10, 2022 7:10 AM

Convicted One

Okay, I'll bite.  Why is it that anytime I propose using old railroad ties for landscaping forms, I'm reminded that without proper drainage, they'll rot. Yet here we have load bearing wooden trestles being buried intentionally? What am I missing? Sigh

The fill trestle has no purpose once it has been filled, so it is okay if it rots.  If the fill is in a previously unfilled area, the trestle is contructed  with low quality because it is only needed for the filling work.

However, the rotting will cause fill subsidence over time, which will require subsequent work in the future to raise the track by adding a little more fill.  

 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy