MidlandMike SD60MAC9500 I'll add to the comments on Great Lakes container trade. Not only are draft restrictions an issue. If you'd were to operate any year round service it would require ice class vessels which are more expensive to build. The railroad carferries opperated year around. I think the problem is more with the locks. They would like to keep the Soo locks open longer, but the Army Corps of Engineers wants the 2 month winter shut down to do maintenance.
SD60MAC9500 I'll add to the comments on Great Lakes container trade. Not only are draft restrictions an issue. If you'd were to operate any year round service it would require ice class vessels which are more expensive to build.
I'll add to the comments on Great Lakes container trade. Not only are draft restrictions an issue. If you'd were to operate any year round service it would require ice class vessels which are more expensive to build.
The railroad carferries opperated year around. I think the problem is more with the locks. They would like to keep the Soo locks open longer, but the Army Corps of Engineers wants the 2 month winter shut down to do maintenance.
Yes, exactly. Ice-breaking ships don't mean much when the locks are closed and you can get in or out of the lakes.
Chris van der Heide
My Algoma Central Railway Modeling Blog
Ports are the most difficult place to plan for the logistics of shipping and receiving freight.
The shippers want to have their product (boxes) at the port so they are available for the scheduled departure of the ship that will haul them. Port areas have limited storage space to hold boxes for 'the next ship'. By the same token, 'the next ship' when it arrives has boxes to be unloaded before it can load new outbound boxes.
Back up 60 to 70 vessels and there are a whole lot of boxes to deal with.
Boxes in ground transportation arrive and depart both by truck and rail.
Never too old to have a happy childhood!
Murphy SidingIt's an economic issue. There are lots of doors produced domestically. There are a whole lot more doors produced overseas that cost a lot less, even after you cart them half way accross the earth.*
Before this mess a saying went: "Assume transportation costs approach zero." That has now changed.
Transportation costs for low valued commodities such as coal and wheat did make up a significant part of the delivered costs. But for more valuable things such as flat screen TVs and bycicles the shipping costs were insignificant for the individual item. A factory in Malaysia was "Virtually" in North America as far as shipping costs went.
Monday through Friday the Wall Street Journal carries a "Logistics Report." I believe they are doing a very good job covering this mess. These are from today:
"
Average number of days inbound containers waited on docks for transport from the ports of Los Angeles and Long Beach in September, up from 5.4 days in August to the highest level in records dating to 2016, according to the Pacific Merchant Shipping Association
The Port of Los Angeles resisted going to a 24/7 operation because the containers, if unloaded, will just sit there taking up space for a current average of almost six days.
This was also in today's report:
“On any given day, something is out of stock.”
It's a mess. And there are no words or edicts from the government that will clean it up.
BaltACD D.Carleton Murphy Siding At a meeting with a supplier last week, we were told that the cost to ship a container of doors from Malaysia to central Minnesota... By no means an expert, haven't spent a whole lot of time there but if there is anyplace that could manufacture their own doors it would be Minnesota. Suspect it is featured that the cost of labor in making doors in Minnesota would be too high in comparison to the foreign doors. Products are manufactured to meet a particular 'price point'.
D.Carleton Murphy Siding At a meeting with a supplier last week, we were told that the cost to ship a container of doors from Malaysia to central Minnesota... By no means an expert, haven't spent a whole lot of time there but if there is anyplace that could manufacture their own doors it would be Minnesota.
Murphy Siding At a meeting with a supplier last week, we were told that the cost to ship a container of doors from Malaysia to central Minnesota...
At a meeting with a supplier last week, we were told that the cost to ship a container of doors from Malaysia to central Minnesota...
By no means an expert, haven't spent a whole lot of time there but if there is anyplace that could manufacture their own doors it would be Minnesota.
Suspect it is featured that the cost of labor in making doors in Minnesota would be too high in comparison to the foreign doors. Products are manufactured to meet a particular 'price point'.
Thanks to Chris / CopCarSS for my avatar.
The real crisis looming is hyperinflation, and the blame will fall squarely on the hyper spending that we all will pay for. Those in charge of the spending do not want to be blamed for the hyperinflation; and simply denying it is not working.
So, it is telling that we should suddenly be served up a new crisis to take our minds off the 600-pound gorilla of hyperinflation. And so conveniently, this new crisis, named "Supply Chain," is said to be our fault for buying too much, and also a sign of how successful our economic recovery is; and thus a reason why we should feel good about Supply Chain Crisis.
A decent article on the supply chain.
https://slate.com/business/2021/10/supply-chain-shortages-retail-united-states-explained.html?fbclid=IwAR0uP3aHi3IoebUXjgAGJXsALhsRmPjQ5nRtRJJvIoDgWR5JVF9cYAytlBk
Editor Emeritus, This Week at Amtrak
Maersk Montana - operates in liner service between the USA and Europe
https://www.vesselfinder.com/vessels/MAERSK-MONTANA-IMO-9305312-MMSI-367759000
caldreamer The ports of Oakland, Tacoma and Seattle can be used to take some of the strain off the LA ports. NO ONE has mentioned any overload of traffic going into these ports. It is always the LA ports. Why not shift some of the traffic north, unload the ships and move them back to their next destination instead of saying "woe is me we have shipps waiting to unload".
The ports of Oakland, Tacoma and Seattle can be used to take some of the strain off the LA ports. NO ONE has mentioned any overload of traffic going into these ports. It is always the LA ports. Why not shift some of the traffic north, unload the ships and move them back to their next destination instead of saying "woe is me we have shipps waiting to unload".
I thought of that also, but then I remembered that the western railroads have built their system to funnel almost everything into their main hub of Chicago, where the actual nexis of the problem seems to be.
Even if alternative ports could be switched into action, there is the whole other side to consider. Those ships don't just dump their cargo and sail away empty. If nothing else, we cannot import anything without a container to ship it in. And if we don't return our empties, ther are not containers.
And if we are exporting grains or other agricultural goods, can we take them from the west coast and simply move them all to the east coast? Not reasonably.
Murphy Siding caldreamer The ports of Oakland, Tacoma and Seattle can be used to take some of the strain off the LA ports. NO ONE has mentioned any overload of traffic going into these ports. It is always the LA ports. Why not shift some of the traffic north, unload the ships and move them back to their next destination instead of saying "woe is me we have shipps waiting to unload". I wonder if it is that simple? Can a ship be diverted to a different port without major problems? Is there capacity there to unload, and railroad or truck capacity to forward the containers?
I wonder if it is that simple? Can a ship be diverted to a different port without major problems? Is there capacity there to unload, and railroad or truck capacity to forward the containers?
One thing to remember - most ships involved in the container business are on scheduled routes making port at a number of locations along their scheduled route. The ships unload and load containers at each port of call - changing ports of call would create additional logistic challenges in the the handling of containers for the vessel - even changing ports on the same coast would create a logistical nightmare for the company and ports involved.
Container ships do not operate in a get fully loaded at A and fully empty at Z type operation. While a ship may be able to hold 20K TEU's, it will rarely if ever have that may on board. Instead the vessel may leave Port A with 14K TEU on board, it goes to Port B and unloads 1K TEU and loads 2K TEU, it sails on to Port C and unloads 3K TEU and loads and so on an so forth around all the ports of call on both sides of the ponds.
n012944 https://www.news4jax.com/news/local/2021/10/14/can-florida-help-solve-national-shipping-delays/ https://miami.cbslocal.com/2021/10/15/ron-desantis-ports-supply-chain/
https://www.news4jax.com/news/local/2021/10/14/can-florida-help-solve-national-shipping-delays/
https://miami.cbslocal.com/2021/10/15/ron-desantis-ports-supply-chain/
Euclid I am reading all of the news opinions as to what is causing the supply chain problems. The news makes it seem like this problem exploded on the scene a couple weeks ago. Yet it has been around since about March 2020. Maybe it mitigated a bit toward fall 2020, but it was clearly back by last April, particularly with computer products. We have been told that inflation is growing worse and causing prices to rise. Now all of a sudden we are told that it is the supply chain shortages causing prices to rise. And we are also being told that our consumer demand is excessive and that is what is causing supply chain problems, and by extension, causing inflation. Yet up until a couple days ago, the explanation for rising prices was too much deficit spending; a classic cause for inflation. That is the classic cause of inflating the money supply by borrowing so we have too many dollars chasing too few goods. This link contains a quote that I do not understand: https://abcnews.go.com/Politics/whats-causing-americas-massive-supply-chain-disruptions/story?id=80587129 From the link: "Strengthening our supply chains will continue to be my team’s focus," said Biden. "If federal support is needed, I will direct all appropriate action, and if the private sector doesn’t step up, we’re going to call them out and ask them to act." What does the President mean by the last sentence in that quote? What does he expect the private sector to do? What does he mean by “Call them out”? That does not sound friendly. It sounds more like a thinly veiled threat. So what does he want the private sector to do when they step up after being called out by the Government?
We've had "supply chain" issues for years. Chassis shortages, low port efficiency due to the current tenant system, and lane imbalances. We create alot of empty boxes on this side of the world. The current situation just exacerbated lingering problems..
The government is the last participant you want in this situation..
Panama Canal Toll Calculator
https://www.wilhelmsen.com/tollcalculators/panama-toll-calculator/
Murphy Siding caldreamer The ports of Oakland, Tacoma and Seattle can be used to take some of the strain off the LA ports. NO ONE has mentioned any overload of traffic going into these ports. It is always the LA ports. Why not shift some of the traffic north, unload the ships and move them back to their next destination instead of saying "woe is me we have shipps waiting to unload " Can a ship be diverted to a different port without major problems? Is there capacity there to unload, and railroad or truck capacity to forward the containers? "
caldreamer
The ports of Oakland, Tacoma and Seattle can be used to take some of the strain off the LA ports. NO ONE has mentioned any overload of traffic going into these ports. It is always the LA ports. Why not shift some of the traffic north, unload the ships and move them back to their next destination instead of saying "woe is me we have shipps waiting to unload
" Can a ship be diverted to a different port without major problems? Is there capacity there to unload, and railroad or truck capacity to forward the containers? "
Norris: I think you may have hit on what might be the $64,000.00 Question..
So far the Forum members are mentioning Container traffic rerouted to Florida...Also possibly, might be Ports on the Gulf (Alabama?), and possibly New Orleans? The problem seem to be getting the ships from Pacific Ports, in California; and some of the other Left Coast Ports?? The major issue there would seem to be Transiting the Panama Canal....[Cost + per Ship??| My guess is mucho ++ expensive ?
There is another Port on the West side; Lorenzo Cardenas,Mx. Currently served directly by the KCSdeM (KCRRR) and possibly, beforer long by the "NEW" (?) Canadian Pacific owner of the Kansas City Southern RR ? Such a route would cut off the Panama Canal (Water Route) Transit Costs??
Which brings me to ask: (Since the KCSRR owns the parallel cross istmus Panama Canal RR.... Does Canadian Pacific get to own that also? Have seen that part of the KCS Railroad Deal, mentioned anywhere? )
An "expensive model collector"
Murphy SidingI wonder if it is that simple? Can a ship be diverted to a different port without major problems? Is there capacity there to unload, and railroad or truck capacity to forward the containers?
I would opine that physical port capabilities might be a problem. Draft could be a limiting factor. I'm sure much of that information is available - some one else can dig it out.
As mentioned, throughput could be an issue. Do the roads and the railroads have the capacity to handle a significant increase in traffic? Are the RR cars and truck chassis available? Does the railroad have crews and equipment available to run more trains, or if not more trains, then longer trains?
Running those ships to another port shouldn't be anything that can't be sorted out. Right now they're sitting around, waiting. A day or two in transit to another port wouldn't be an issue, I wouldn't think.
Larry Resident Microferroequinologist (at least at my house) Everyone goes home; Safety begins with you My Opinion. Standard Disclaimers Apply. No Expiration Date Come ride the rails with me! There's one thing about humility - the moment you think you've got it, you've lost it...
caldreamerThe ports of Oakland, Tacoma and Seattle can be used to take some of the strain off the LA ports. NO ONE has mentioned any overload of traffic going into these ports. It is always the LA ports. Why not shift some of the traffic north, unload the ships and move them back to their next destination instead of saying "woe is me we have shipps waiting to unload".
Did this jam up begin with the Ever Given ? Can these super max ships even go to other west coast terminals ? Are they so oversized that they cannot go thru the Panama canal to go to east coast terminals ?
Until recently, west coast ports were not working 24-hour days. Supposedly they have started. Perhaps that is what is meant as an example of "stepping up" to meet the crisis in logistics?
greyhounds... There is no silver bullet for this supply chain mess. The mess is starting to drag down the economy. And it’s helping create significant inflation as shortages proliferate.
There is no ONE fix that fixes the 'supply chain' and restores 'just in time inventory'. Organizations that view sustained operations as critical - will have to expand their warehousing inventory so that they are not as tied to the fluctuations of their own supply chain, with the understanding that THEIR supply chain can be adversely affected by problems in other people's supply chains.
Backlogged ports, be they US or foreign affect virtually ALL supply chains.
It is amazing what happenings can create major transportation nightmares in supply chains.
In the middle 70's the USSR had several years of harvest failures and began buying grain from the USA. Gulf and Atlantic ports soon became swamped with export grain for the USSR.
In the late 70's and early 80's the Export Coal market boomed. At one time there were reported to be over 100 vessels waiting to dock at the Chessie System's Curtis Bay Coal Pier. There were similar backlogs at Newport News on the C&O as well as Lamberts Point on the NS. In response additional coal handling facilities were built in Baltimore and Hampton/Newport News area. In Baltimore the Bayside and Consol facilities were built, in the Hampton/Newport News are the Dominion Terminal facility was built.
Additional container facilities will be constructed and additional handling infrastructure will be built and in several years world shipping will become fluid again.
tree68the St Lawrence locks are a bit smaller. Each lock is 233.5 metres long (766 feet), 24.4 metres wide (80 feet) and 9.1 metres deep (30 feet) over the sill. On the Welland Canal, max boat length is 740 feet, beam is 78 feet, and draft is 26.5 feet.
Yes, this is absolutely the limiting factor, so big international ships can't get past Montreal.
And you can't reach the Great Lakes via the Mississipi so if you wanted to get there it has to go all the way around the Canadian maritimes.
Our community is FREE to join. To participate you must either login or register for an account.