Posted by williamsb on Friday, June 17, 2022 1:19 PM

I just looked back on this discussion and noted I wrote on May 1, 2019 a quote from JJ Ruest Earnings call when asked about CN's OR that "CN was not a one trick pony about OR".

I was quite happy to hear that and I liked CN was spending a lot on capitol projects even through it raised the OR, CN was still making a lot of money.

Well a hedge fund did not like it and 3 years later JJ is gone, what do you think of that?

  • Member since
    April 2006
  • From: Mission BC Canada
  • 218 posts
Posted by williamsb on Wednesday, June 15, 2022 4:50 PM

Thanks Dude. Not double track but CN just opened an extended sidind at Ashcroft 16,105'.

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Wednesday, June 15, 2022 3:19 PM

Fallis is mile 51.8 (the switch is immediately west of the Main St crossing).  Gainford is mile 60.4 (previously the west end of the siding, and just east of the large steel Magnolia bridge over Highway 16).

There is a private crossing into a lakefront gated community approximately 9,000' west of Fallis, and most trains will not fit between it and the east end of the double track.  The time limits around blocking public crossings do not apply to private or farm crossings, so it will be interesting to see how popular we become with the local residents. 

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    April 2006
  • From: Mission BC Canada
  • 218 posts
Posted by williamsb on Wednesday, June 15, 2022 12:55 PM

 

Do you have mileages for this section of 2 tracks SD70 Dude?

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Tuesday, June 14, 2022 3:08 PM

The Fallis-Gainford section was finally cut in a few days ago, on the evening of Saturday June 11.  The controlled location at Fallis has been laid out to leave room for a full set of double crossovers, indicating that they plan/hope to extend it farther east. 

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Wednesday, December 22, 2021 11:12 PM

The section between Leaman and Chip Lake (the new station at mile 80) on the Edson Sub opened this week.  The other section between Fallis and Gainford is still under construction, we'll see if they keep at it through the winter.

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    September 2002
  • From: Sterling Heights, Michigan
  • 1,691 posts
Posted by SD60MAC9500 on Tuesday, June 22, 2021 10:38 PM
 

williamsb

CN is also working on double tracking from Abrahamson to Glen valley on the Yale Sub filling in a 3.6 mile piece between 2 double tracks.

A short piece of the New Westminster Sub was triple tracked earlier this year.

 

Any word of a replacement for the New Westminster Bridge over the Fraser River?

 
 
 
 
 
Rahhhhhhhhh!!!!
  • Member since
    April 2006
  • From: Mission BC Canada
  • 218 posts
Posted by williamsb on Tuesday, June 22, 2021 6:53 PM

CN is also working on double tracking from Abrahamson to Glen valley on the Yale Sub filling in a 3.6 mile piece between 2 double tracks.

A short piece of the New Westminster Sub was triple tracked earlier this year.

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Tuesday, June 22, 2021 6:09 PM

Reviving this thread, construction is well underway on two additional sections of double track on the Edson Sub.  

Leaman to mile 80 (not far west of Wildwood), and Gainford to Fallis.  It appears the 6400' Wildwood siding will be left as it is, despite having little utility in today's world of long trains.  VIA and the Cadomin rock train are about the only regular trains that fit there, the siding's usable length being further reduced by two public crossings.  

I've heard that the Gainford-Fallis section is not going all the way to the current end of double track at Wabamun because CN does not own a wide enough ROW through the village of Whitewood Sands, this was also the location of a derailment that dumped a large amount of heavy fuel oil and other 'goodies' into Wabamun lake (the lake coughed up tar balls for years afterward and may still).  

https://www.tsb.gc.ca/eng/rapports-reports/rail/2005/r05e0059/r05e0059.html

Whitewood Sands was also the site of an interesting battle between CN and a local resident.  Being rather well off this fellow had managed to acquire a choice piece of semi lakefront property, with only the track being between him and the lake.  He squeezed as large a house as possible into his lot, which is shoehorned in between the track and a public road, and built an equally large deck on the lakefront side.  

He was not amused by the oil spill beside his property, and proceeded to do his best to become a thorn in the railway's side.  CN responded by measuring where the ROW actually ended, and it turned out that most of his deck actually sat on railway property.  

CN quickly removed the offending portion with chainsaws and other power equipment.  

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Tuesday, October 20, 2020 3:00 PM

Except it doesn't go right from bridge to bridge.  The east switch is in the same place as when Entrance was a 6400' siding, there is still almost a mile from it to the Maskuta Creek bridge.  The west end is about 1000' east of the last straight stretch before the Athabasca River bridge.  

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    April 2006
  • From: Mission BC Canada
  • 218 posts
Posted by williamsb on Tuesday, October 20, 2020 1:13 PM

This is between 2 large bridges, Prairie Creek mile 187.5 near Hinton AB and the Athabasca River bridge at 193.7 so pretty hard to make it much longer.

  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Tuesday, October 20, 2020 8:12 AM

SD70Dude
The double track at Entrance, Alberta was finally cut in a few weeks ago.  The controlled location at the west end (mile 193 Edson Sub) is named "Athabasca River".  

It is just under 22,000' long, which means that in many cases only one train will fit there.

In today's PSR sized trains 4 or 5 miles of double track can't really be considered 'double track' but just a long siding.

When the B&O reconfigured its line from Philadelphia to Baltimore from double track to single track CTC in 1960 (or thereabouts) it was done with nominal 10K feet passing sidings about 10 miles apart the capacity study for that configuration was predicated on being able to 'double meet' trains in those 'long' sidings.  In that era, a 5k foot train was the big exception.  Today a 5K foot train or smaller is the exception.

Never too old to have a happy childhood!

              

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Monday, October 19, 2020 11:57 PM

The double track at Entrance, Alberta was finally cut in a few weeks ago.  The controlled location at the west end (mile 193 Edson Sub) is named "Athabasca River".  

It is just under 22,000' long, which means that in many cases only one train will fit there.

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    April 2006
  • From: Mission BC Canada
  • 218 posts
Posted by williamsb on Friday, July 3, 2020 6:27 PM

I had asked about the DT at Hawthorne WI, kgbw49 answered that it was double tracked in 2018 from Hawthorne north to the Amnicon River bridge. I have seen pictures of trains on this section of DT. It is still not in the CTG. My question is does anyone have the mileposts for this section? Thanks.

  • Member since
    September 2014
  • 71 posts
Posted by ADRIAN BALLAM on Friday, July 3, 2020 4:38 PM

Thank you. I will be sending them an e-mail.

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Thursday, July 2, 2020 5:48 PM

Deggesty
williamsb

Both eastbound

Thank you. That explains why EB trains stay on the Albreda Sub and WB use the Robson Sub. The passenger train from Prince Rupert goes directly from Taverna to Redpass.

Both the now nameless Skeena (originally CN No. 9 and No. 10, the 'Rupert Rocket', currently VIA No. 5 and No. 6) and the Canadian can use either line depending on daily operational requirements.  If there are no nearby freights in the opposing direction the Dispatcher may use this stretch to allow the passenger train to overtake several freights at once. 

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Thursday, July 2, 2020 5:43 PM

ADRIAN BALLAM

So those two sections, were they missed in the Trackside Guide then since they have been in operation for a year?

I don't have a copy of the current Trackside Guide, but if they are missing then yes, it is a mistake. 

Remember, the Trackside Guide is published by a volunteer group in Ottawa (Bytown Railway Society).  It is only as good as the information they receive, mostly from unofficial sources as CN and CP management probably wouldn't give them the time of day, and it does contain plenty of minor errors. 

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Thursday, July 2, 2020 8:00 AM

williamsb

Both eastbound

 

Thank you. That explains why EB trains stay on the Albreda Sub and WB use the Robson Sub. The passenger train from Prince Rupert goes directly from Taverna to Redpass.

Johnny

  • Member since
    April 2006
  • From: Mission BC Canada
  • 218 posts
Posted by williamsb on Thursday, July 2, 2020 12:16 AM

Both eastbound

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Wednesday, July 1, 2020 7:44 PM

williamsb

The first 20 miles of the Robson Sub is the original GTP to Prince Rupert Tete Jaune Sub. In the 1980's CN built a 9 mile connection to the Albreda Sub near Valemount, originaly the CNoR.

The grade on the GTP was approx 1% and the CNoR about 0.7%

 

Thank you. Is the 1% going east or going west? Is the 0.7% going east or west?

Johnny

  • Member since
    April 2006
  • From: Mission BC Canada
  • 218 posts
Posted by williamsb on Wednesday, July 1, 2020 6:26 PM

The first 20 miles of the Robson Sub is the original GTP to Prince Rupert Tete Jaune Sub. In the 1980's CN built a 9 mile connection to the Albreda Sub near Valemount, originaly the CNoR.

The grade on the GTP was approx 1% and the CNoR about 0.7%

  • Member since
    August 2005
  • From: At the Crossroads of the West
  • 11,013 posts
Posted by Deggesty on Wednesday, July 1, 2020 2:08 PM

Adrian, I have two questions concerning the Robson and the Albreda Subs--which is the original track, and how do the grades on the two compare? On the few trips I have taken through there, the train from Vancouver used only the Albreda Sub, and the train to Vancouver used the Robson sub; coming back from Prince Rupert, we went directly from Harvey to Redpass. 

Thank you.

Johnny

  • Member since
    September 2014
  • 71 posts
Posted by ADRIAN BALLAM on Wednesday, July 1, 2020 1:02 PM

So those two sections, were they missed in the Trackside Guide then since they have been in operation for a year?

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Wednesday, July 1, 2020 10:26 AM

ADRIAN BALLAM

Hello there,

I just got 2020 Canadian Trackside Guide and noticed that the section from Leaman to Niton on the Edson Sub was not listed. Also, the Biggar to Neola section is also not listed. Do you know if either of these sections have been completed by this point?

Both have been in service for nearly a year now.  Neola has been renamed Newton after a retiring superintendent.

The section at Entrance, AB is still under construction.  Tough going in rough, remote terrain and all this rain has not helped.

Brush has been cleared east of both Leaman and Gainford on the east end of the Edson Sub, but no construction has started and I'm not sure if much will happen this year due to pandemic-related budget cuts.  

Some grading was done last year between Kinsella and Irma on the west end of the Wainwright Sub, but this too may have been cancelled.  

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    September 2014
  • 71 posts
Posted by ADRIAN BALLAM on Tuesday, June 30, 2020 11:34 PM

Hello there,

I just got 2020 Canadian Trackside Guide and noticed that the section from Leaman to Niton on the Edson Sub was not listed. Also, the Biggar to Neola section is also not listed. Do you know if either of these sections have been completed by this point?

  • Member since
    March 2012
  • 34 posts
Posted by Gotrans on Thursday, November 21, 2019 3:45 PM

Thanks for the update on the status of construction projects. I will be curious to see what CN's expansion plan is, if any for 2020.

  • Member since
    April 2006
  • From: Mission BC Canada
  • 218 posts
Posted by williamsb on Saturday, November 16, 2019 5:47 PM

Thanks for that SD70Dude. Good luck on the labour negotiations.

Does anyone know about the 8 miles to be double tracked near Hawthorne WI this year?

  • Member since
    December 2017
  • From: I've been everywhere, man
  • 4,269 posts
Posted by SD70Dude on Friday, November 15, 2019 8:58 PM

williamsb

I have pictures of the Leaman to Niton section 12 miles that I took at the end of Aug. They were putting in a crossover at MacKay and a lot of work had been done.

I saw that the 5 miles between the bridges at Entrance was in progress.

I have seen pictures of Greenshields to Wainwright, might be done. Anyone know?

I have seen pictures of a new roadbed at Jarrow that was done, as far as I know this was not a section to be done.

Dufault to Clavet SK is reported done.

Atwater to Zeneta is reported done.

Exira to Deer in progress.

Biggar to Neola in progress.

Fenwood to Bailey just needs switches.

Bangor to Waldron was on the list. Any reports?

Greenshields to Wainwright East was cut in on Wednesday.

Niton to Leaman has been operational for about a month.  The new switch and signals at Leaman have been positioned to allow for a full set of double crossovers to be installed when that section is eventually extended farther east. 

Exira to Deer has been completed.  Exira no longer exists as a official station or control point.  There is a set off crossovers called "Elk Crossing" several miles west of its former location, these were installed several years ago during the first round of post-Hunter double tracking.

Atwater to Zeneta is indeed done, as is Fenwood to Bailey (this is immediately west of Melville, SK) and Dufault to Clavet (east of Saskatoon). 

The 5 miles west of Entrance are still in progress, construction on this section was set back by 2-3 months as the original contractor abruptly went bankrupt earlier this summer, and ceased all work.  This may not be completed before winter, but they are working very hard and materials are continuing to arrive.

Greetings from Alberta

-an Articulate Malcontent

  • Member since
    March 2012
  • 34 posts
Posted by Gotrans on Saturday, November 9, 2019 7:55 AM
Are all of 2019's capital expansion projects completed yet? As they say on Game of Thrones, "Winter is Coming".

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy