Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
WATCO abandoning service on Washington State owned lines! (read: BNSF does it again!)
Edit post
Edit your reply below.
Post Body
Enter your post below.
Tom, it's real simple (regarding operations through Cascade Tunnel). An empty heading eastbound through the tunnel (the 1.7% upgrade direction) will not need as much horsepower as a fully loaded double stack, thus the engines are not working as hard, thus there is less emissions to be cleared out, thus the tunnel is ready in much less time for the next train. That's why the Quincy dedicated intermodal train would leave such a small footprinto on current BNSF operations via Stevens Pass. <br /> <br />For the record, most eastbounds are loads (usually double stacks of Asian imports), so if it takes a hour to clear the tunnel after each loaded double stack, adding more eastbound loads will be difficult. But westbounds, regardless of tonnage, are effectively just drifting downgrade, so the tunnel is usually available for the next train shortly thereafter. The only type of eastbound that wouldn't require the usual 40 minutes would be one that's not working so hard going upgrade, e.g. an empty.
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy