Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
Modeling BNSF and Milwaukee Road in SW Wisconsin
Tom View my layout photos! http://s299.photobucket.com/albums/mm310/TWhite-014/Rio%20Grande%20Yuba%20River%20Sub One can NEVER have too many Articulateds!
QUOTE: Originally posted by twhite Additional Useless Information--the first 2-8-2, or Mikado, was built in 1895 by Baldwin for the Japanese National Railways, hence it's name.
QUOTE: Originally posted by twhite Mark--you're right. Sorry about that, I was quoting off the top of my head from a book I've got called THE LOCOMOTIVES THAT BALDWIN BUILT, and got the railway and the date wrong. Don't know why 1895 was stuck in my head-- Best, Tom