Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Bridge Question

983 views
7 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Bridge Question
Posted by BATMAN on Wednesday, March 4, 2009 2:57 PM
I am thinking of putting the Faller Bletschal bridge or a viaduct over this what will one day be a deep canyon on this section of my layout. It will go roughly between the two upright supports in this photo. (It is 60" between them) I will cut out the spline when the final bridge length is determined. What I want to know is can a bridge like this be put in and be made so it is removable or should it be installed permanently in place? I thought I would like to be able to remove it if I wanted to do some work behind it without the possibility of damaging it. Thanks Brent

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

  • Member since
    February 2005
  • From: Southwest US
  • 12,914 posts
Posted by tomikawaTT on Wednesday, March 4, 2009 3:06 PM

I see no reason why the bridge, and the slice of landscape it stands on/spans, can't be built as a removable domino, securely anchored to the main benchwork when installed, but able to be lifted out after removing a few screws or bolts.

I have already built two yard throats in similar manner, and am about to embark on building another.

Chuck (Modeling Central Japan in September, 1964)

  • Member since
    January 2005
  • From: Winnipeg Canada
  • 1,637 posts
Posted by Blind Bruce on Wednesday, March 4, 2009 4:13 PM

Is the Faller bridge really 60" long?

73

Bruce in the Peg

  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Posted by BATMAN on Wednesday, March 4, 2009 4:23 PM

Blind Bruce

Is the Faller bridge really 60" long?

 

 

I think it's about 44" long. I'll cut the appropriate amount of spline out once whatever structure I use is complete and ready to be inserted.

                                                                Brent

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

  • Member since
    July 2006
  • 63 posts
Posted by Beaver14 on Wednesday, March 4, 2009 4:37 PM
Brent, With a bridge gap of 44", you need to look very carefully at the supporting structure/benchwork. At issue is track alignment over time. Especially with wood bench-work, expansion/contraction and moisture absorption have a tendency to put the two ends of such a gap out of alignment. When I looked at the image of the bridge on the Walthers site, I immediately thought about a favorite long bridge trick: Keep much of the spline intact but apply the bridge girders (the "steel" that immediately supports the track) as cosmetic sheathing on the side of the spline. Then build the rest of the bridge structure to either be permanent or removable. Paint the top and bottom of the spline black, lay bridge track, and very few will ever notice that you can't see down through the ties. The alternative is very substantial bracing and benchwork structure to attempt to maintain alignment. Good Luck! Beaver Bill
  • Member since
    May 2004
  • 7,500 posts
Posted by 7j43k on Wednesday, March 4, 2009 5:27 PM
I endorse Bill's concept. It's the way to go if you don't mind the pseudo-invisible spine.

Ed
  • Member since
    July 2004
  • From: Weymouth, Ma.
  • 5,199 posts
Posted by bogp40 on Wednesday, March 4, 2009 10:46 PM

Beaver14
Brent, With a bridge gap of 44", you need to look very carefully at the supporting structure/benchwork. At issue is track alignment over time. Especially with wood bench-work, expansion/contraction and moisture absorption have a tendency to put the two ends of such a gap out of alignment. When I looked at the image of the bridge on the Walthers site, I immediately thought about a favorite long bridge trick: Keep much of the spline intact but apply the bridge girders (the "steel" that immediately supports the track) as cosmetic sheathing on the side of the spline. Then build the rest of the bridge structure to either be permanent or removable. Paint the top and bottom of the spline black, lay bridge track, and very few will ever notice that you can't see down through the ties. The alternative is very substantial bracing and benchwork structure to attempt to maintain alignment. Good Luck! Beaver Bill

 

A method to align rail, allow for expansion and also allow removal of the bridge, is to allow the rails of the bridge to extend a few inches beyond the abutments and anchor to the ties. If flextrack is used spikes can be used in predrilled holes. The method I use is to lay the rail on some wood tie,then transition to the flex. This stabilizes the bridge allowing excellent anchoring and allows for removal if ever needed.

These Central Valley bridge have the shoes resting on the abutments; the left is wood spline w/ handlaid, the right is flex on wood spline. The bridges are located by the method described above

This ME viaduct is also anchored the same. The ME bridge flex had ties removed to extend out beyond the abutments. This area is all Wather's/ Shinahara flex so I glue wood ties to the areas for spiking. The entire viaduct is removable if needed. These bridges have been installed for about 4 years now and there has never been any problems w/ expansion or any misalignment

The structural integridy must be maintained on the lower portion of the benchwork. If a deeper canyon is wanted, provisions to tie the sections together is critical.

 

Modeling B&O- Chessie  Bob K.  www.ssmrc.org

  • Member since
    July 2006
  • From: 4610 Metre's North of the Fortyninth on the left coast of Canada
  • 9,352 posts
Posted by BATMAN on Friday, March 6, 2009 10:41 AM

 Thanks for the input. I have though about dressing up the spline with girders and making it look like a viaduct, but I really like the idea of being able to look down through the iron work to see the creek below. Humidity is not a problem where I live and the room is always at a stable temperature. I think a steel arch bridge is the way I would like to go. One other question is how sturdy are these bridges when built? I am a little concerned about the visiting rug rats taking a poke at it.Shock Thanks.

 

                                             Brent

Brent

"All of the world's problems are the result of the difference between how we think and how the world works."

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!