Trains.com

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Tripple deckers?

3292 views
22 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    June 2006
  • From: Sweden
  • 1,808 posts
Tripple deckers?
Posted by Lillen on Thursday, March 27, 2008 1:49 PM

Hi,

 

As I've understood  it double decks are fairly common, I was thinking of doing one of those with a staging yard below the lower level. Now, my question is this. Are there many triple decks out there? Are they feasible? I was just considering today that it would be possible to make a layout with three decks, with the upper deck at 160 cm, middle at 120 and the lower at 80 cm.

 

Is that feasible or just a bad idea? I would use a Helix between decks.

 

Magnus

Unless otherwise mentioned it's HO and about the 50's. Magnus
  • Member since
    April 2007
  • From: Redneck Land(Little Rock), Arkansas
  • 919 posts
Posted by arkansasrailfan on Thursday, March 27, 2008 2:08 PM
feasible. there was a layout in the Great Model Railroads 2007 that was a triple decker, but the 3rd deck was still being built.
-Michael It's baaaacccckkkk!!!!!! www.youtube.com/user/wyomingrailfan
  • Member since
    February 2005
  • From: In the State of insanity!
  • 7,982 posts
Posted by pcarrell on Thursday, March 27, 2008 2:27 PM
My own layout currently under construction is a double decker with a staging deck under that.  I don't really classify it as a triple decker as the bottom level is only 6" under the one above it, it doesn't have any scenery (obviously), and it shares the same benchwork as the bottom sceniced level.  I don't need a helix to go from the staging deck to the bottom sceniced deck as they actually meet in height on the peninsula of my layout to form a live interchange between a class 1 RR (represented mostly by the staging) and a shortline RR (the main focus of the layout and the RR that's sceniced).  There will be a helix between the two sceniced decks.  I'm still building, but I've done a layout similar to this in the past, so I know it can be done.
Philip
  • Member since
    June 2006
  • From: Sweden
  • 1,808 posts
Posted by Lillen on Thursday, March 27, 2008 2:28 PM

 wyomingrailfan wrote:
feasible. there was a layout in the Great Model Railroads 2007 that was a triple decker, but the 3rd deck was still being built.

 

I like that one. It's one of my biggest inspirations.

 

Magnus

Unless otherwise mentioned it's HO and about the 50's. Magnus
  • Member since
    December 2002
  • 1,511 posts
Posted by pastorbob on Thursday, March 27, 2008 2:46 PM

Yes, mine is a triple decker, started in 1989.  It fills an area 28ft by 35 ft, uses a helix from top to middle, a long hidden grade from middle to bottom.  All three decks are visible and most of the bottom deck is sceniced.  You can check it out using my layout link.

Bob

forgot the link.  www.atsfmodelrailroads.com/

 

Bob Miller http://www.atsfmodelrailroads.com/
  • Member since
    June 2006
  • From: Sweden
  • 1,808 posts
Posted by Lillen on Thursday, March 27, 2008 2:47 PM
 pastorbob wrote:

  You can check it out using my layout link.

Bob

 

Where is that?

 

Magnus

Unless otherwise mentioned it's HO and about the 50's. Magnus
  • Member since
    January 2005
  • From: Mississippi
  • 194 posts
Posted by maandg on Thursday, March 27, 2008 5:05 PM
 Lillen wrote:

 wyomingrailfan wrote:
feasible. there was a layout in the Great Model Railroads 2007 that was a triple decker, but the 3rd deck was still being built.

 

I like that one. It's one of my biggest inspirations.

 

Magnus

 

That would be my Mississippi Alabama & Gulf layout.  I'm glad you enjoyed it!  I thought you might be interested in a photo of the layout before and after the third level was added.

Before:

After:

My deck heights are 30 inch staging, 40 inch lower and 57 inch upper.  I am currently adding a 16 inch lighted valance from the ceiling to give the "shadowbox" appearance to all three levels.  I began with conventional L-girder construction for the first two levels, but switched to a heavy-duty shelving system for the top.  If I were starting over, I would incorporate this system for all three levels.

My light valance will utilize the same low-watt fluorescent bulbs I used to light the middle level.  Egg crate diffuser sheets will eliminate the harshness of the overhead light to the viewer.  I should have construction completed and photos posted to my website in the next few weeks.

I encourage you to check into a multi-level layout.  In my case it increased the size of the layout from 206 square feet to 618!  This was well worth the 36 square foot space of the helix, which, btw, is not included in those figures.  Truth be told, if I had a 618 square foot space for a layout, I would still probably triple deck it to 1854!!

Unfortunately, that would also be my total living space after the divorce.  Big Smile [:D]

Cliff Powers

www.magnoliaroute.com

  • Member since
    April 2007
  • From: Redneck Land(Little Rock), Arkansas
  • 919 posts
Posted by arkansasrailfan on Thursday, March 27, 2008 5:09 PM
on the 3rd deck, on the left, is that a warehouse?
-Michael It's baaaacccckkkk!!!!!! www.youtube.com/user/wyomingrailfan
  • Member since
    January 2005
  • From: Mississippi
  • 194 posts
Posted by maandg on Thursday, March 27, 2008 5:19 PM

Yes, that was an early mock-up of the Napoleon Avenue Wharf warehouse on my New Orleans level.  The finished model was kitbashed from four Walthers rolling mill kits.  The roof, which is 8-feet long, is removable for access to the 5-track staging yard hidden in the building.  Here are some photos of it from my website.  There are more in the "third level progress" photo gallery if you are interested.

 

 

Cliff Powers

www.magnoliaroute.com

  • Member since
    June 2006
  • From: Sweden
  • 1,808 posts
Posted by Lillen on Thursday, March 27, 2008 5:23 PM

Cliff, thanks a LOT for showing that.

 

Ever since I read about your layout I've been fascinated by it. It's been a huge inspiration of mine since it contains so many features that I would like as well. I have another thread right now on the forum about proper boats since I want to include that and I also want a huge passenger station. So when I read your article it just hit me as pretty much perfect for what I was going for. The room I will rebuild to house railroad is slightly smaller. It's only 4*8,5 meters. But is should be enough. The Helix which I plan to use a 100 cm radius will be placed in a room next to that layout space so it doesn't interfere.

 

The basic idea of your track plan is the one that I keep changing when trying to fit it with what I got and want. For example I want a 36" minimum radius so the Blobs will have to be larger.

 

I will be going with a shadowbox as well since I really like the way it looks and saw some excellent ways of putting in lightning on Joe Fugates DVDs. I think it makes a model railroad looks more professional.

 

Thanks again for showing me. Any advice you would like to give me from problems that you came across?

 

Magnus  

Unless otherwise mentioned it's HO and about the 50's. Magnus
  • Member since
    April 2007
  • From: Redneck Land(Little Rock), Arkansas
  • 919 posts
Posted by arkansasrailfan on Thursday, March 27, 2008 5:31 PM
oooh, very realistic
-Michael It's baaaacccckkkk!!!!!! www.youtube.com/user/wyomingrailfan
  • Member since
    May 2005
  • From: Westcentral Pennsylvania (Johnstown)
  • 1,496 posts
Posted by tgindy on Thursday, March 27, 2008 5:31 PM
 Lillen wrote:

I would use a Helix between decks.

Be sure to check out the 4-page, "Construct a simple and reliable helix," in the April 2008 Model Railroader.  This helix is being used to connect a triple decker.  The benchwork pictures are a welcome addition to any collection of helix-how-to.

The rest of this month's issue is also makes it a very worthwhile purchase.

The best comprehensive helix primer article I have seen to date is the 6-page, "A primer on helix design," found in the 1997 Model Railroad Planning, or as a PDF Station download.

Conemaugh Road & Traction circa 1956

  • Member since
    May 2005
  • From: Westcentral Pennsylvania (Johnstown)
  • 1,496 posts
Posted by tgindy on Thursday, March 27, 2008 5:32 PM

 pcarrell wrote:

My own layout currently under construction is a double decker with a staging deck under that.  I don't really classify it as a triple decker as the bottom level is only 6" under the one above it, it doesn't have any scenery (obviously), and it shares the same benchwork as the bottom sceniced level.

Phil:

  • How many tracks do you have in your 'below deck' staging area?
  • Also, is there trackage access from one end, or both ends of the staging area?

This looks like a partial staging solution to add into my N Scale CR&T double deck planning for the PRR (Class I) layout portion whereas the short line, the traction layout portion in my case is mostly motive power with a some local freight delivery from a Pennsy interchange.

One of the advantages of taking your good 'ole time in layout design, room preparation, and a trackage/overhead practice module - is to be able to plan ahead while adding an idea like this one.

Conemaugh Road & Traction circa 1956

  • Member since
    June 2006
  • From: Sweden
  • 1,808 posts
Posted by Lillen on Thursday, March 27, 2008 5:36 PM
 tgindy wrote:
 Lillen wrote:

I would use a Helix between decks.

Be sure to check out the 4-page, "Construct a simple and reliable helix," in the April 2008 Model Railroader.  This helix is being used to connect a triple decker.  The benchwork pictures are a welcome addition to any collection of helix-how-to.

The rest of this month's issue is also makes it a very worthwhile purchase.

The best comprehensive helix primer article I have seen to date is the 6-page, "A primer on helix design," found in the 1997 Model Railroad Planning, or as a PDF Station download.

 

Thanks for the sugestions. I got both the articles. I back ordered every issue of Great model railroads and model railroad planning as inspiration when I plan my next layout. The Helix issue(1997) was very good.

 

Magnus

Unless otherwise mentioned it's HO and about the 50's. Magnus
  • Member since
    June 2006
  • From: Sweden
  • 1,808 posts
Posted by Lillen on Thursday, March 27, 2008 5:39 PM
 tgindy wrote:

One of the advantages of taking your good 'ole time in layout design, room preparation, and a trackage/overhead practice module - is to be able to plan ahead while adding an idea like this one.

 

I agree!  I'm not going to lay a piece of track for atleast half a year I think. First I have to insulate and renovate the room/house that the layout will be in. This gives me plenty of time to search books and the Internet for ideas. it also gives me plenty of time to ask stupid  questions. Big Smile [:D]

 

Magnus

Unless otherwise mentioned it's HO and about the 50's. Magnus
  • Member since
    February 2005
  • From: In the State of insanity!
  • 7,982 posts
Posted by pcarrell on Thursday, March 27, 2008 8:06 PM
 tgindy wrote:

 pcarrell wrote:

My own layout currently under construction is a double decker with a staging deck under that.  I don't really classify it as a triple decker as the bottom level is only 6" under the one above it, it doesn't have any scenery (obviously), and it shares the same benchwork as the bottom sceniced level.

Phil:

  • How many tracks do you have in your 'below deck' staging area?
  • Also, is there trackage access from one end, or both ends of the staging area?

This looks like a partial staging solution to add into my N Scale CR&T double deck planning for the PRR (Class I) layout portion whereas the short line, the traction layout portion in my case is mostly motive power with a some local freight delivery from a Pennsy interchange.

One of the advantages of taking your good 'ole time in layout design, room preparation, and a trackage/overhead practice module - is to be able to plan ahead while adding an idea like this one.

The staging area is mostly a foot wide shelf that runs a wall with 4 tracks one way and 1 the other, then it turns a corner to a turnback blob and where it turns the corner I added a cutoff to make it so the turnbck blob can also function as a reversing loop, and then I double tracked the loop for one more holding track.  I can basically hold 5 full length trains in staging, one to run and four waiting.  I could add a sixth train if I ran two in staged series.  Here's a shot video I shot when I was testing the track out.  (The close drop-offs have all been fixed since this time.  http://s83.photobucket.com/albums/j319/pcarrell/Autumns%20Ridge/?action=view&current=262699db.flv  The video starts with the train heading out of staging and into the sceniced live interchange, then back to staging.  You can tell what will one day be sceniced because I used Atlas code 80 track (this IS N scale you know) for the staging because it's cheap and bulletproof, and the sceniced parts are all Atlas code 55.  The first turnout on the code 55 is one of the newer #10 turnouts.  Pretty, ain't she?  As you can see, the sceniced level above is yt to be added, but I was thinking along ther lines of what Brunton did with his layout in this pic: http://www.railroad-line.com/forum/data/Brunton/2008316183015_08-03-16_Glenrock_Scenery_Foam_Carved.JPG (Hope you don't mind Mark). 

Philip
  • Member since
    April 2006
  • From: THE FAR, FAR REACHES OF THE WILD, WILD WEST!
  • 3,672 posts
Posted by R. T. POTEET on Friday, March 28, 2008 12:21 AM

Lillen, when I joined the forum almost two years ago now one of your fellow countrymen, forum member electrolove, was designing a TRIPLE deck layout. I was lead to believe by one of his recent posts that he has given up on a triple deck layout and, for one reason or another, has reverted to a double deck one.

I have never liked multi-deck layouts - I like layouts at near eye level and a 30 inch level ain't hardly at near eye level; at this moment, however, I am attempting to make contact with a model railroad organization called Multi-Level Anonymous. When you start thinking about multi-level layouts you contact these people and they send someone over to drink with you until sanity returns. 

From the far, far reaches of the wild, wild west I am: rtpoteet

  • Member since
    February 2005
  • From: In the State of insanity!
  • 7,982 posts
Posted by pcarrell on Friday, March 28, 2008 6:34 AM

R.T. Poteet,

My lower level is at eye level from my very comfortable office chair on wheels! Big Smile [:D]

Philip
  • Member since
    March 2007
  • From: College Station, TX
  • 675 posts
Posted by Arjay1969 on Friday, March 28, 2008 8:08 AM

Magnus,

QUITE feasible.  Our local club layout is a triple-decker, with the top two levels being visible mainline and the bottom level being "hidden" staging/storage. 

Robert Beaty

The Laughing Hippie

-----------------------------------------------------------------

The CF-7...a waste of a perfectly good F-unit!

-----------------------------------------------------------------

Then it comes to be that the soothing light at the

end of your tunnel, Was just a freight train coming

your way.          -Metallica, No Leaf Clover

-----------------------------------------------------------------

  • Member since
    May 2005
  • From: Westcentral Pennsylvania (Johnstown)
  • 1,496 posts
Posted by tgindy on Friday, March 28, 2008 8:56 PM
 pcarrell wrote:

Pretty, ain't she?

Yes-sir-ee-bob!  Good input.

Conemaugh Road & Traction circa 1956

  • Member since
    April 2006
  • From: THE FAR, FAR REACHES OF THE WILD, WILD WEST!
  • 3,672 posts
Posted by R. T. POTEET on Saturday, March 29, 2008 12:06 AM
 pcarrell wrote:

R.T. Poteet,

My lower level is at eye level from my very comfortable office chair on wheels! Big Smile [:D]



You most probably are not approaching sixty eight years of age with legs suffering from a reaction to ZOCOR either; I'm like the midget married to the Amazon and that's as far as I can go with it. When the lower lever is at eye level my upper level is going to be in the clouds; one level at a time thank you!!!

From the far, far reaches of the wild, wild west I am: rtpoteet

  • Member since
    February 2005
  • From: In the State of insanity!
  • 7,982 posts
Posted by pcarrell on Saturday, March 29, 2008 12:32 AM
 R. T. POTEET wrote:
 pcarrell wrote:

R.T. Poteet,

My lower level is at eye level from my very comfortable office chair on wheels! Big Smile [:D]



You most probably are not approaching sixty eight years of age with legs suffering from a reaction to ZOCOR either; I'm like the midget married to the Amazon and that's as far as I can go with it. When the lower lever is at eye level my upper level is going to be in the clouds; one level at a time thank you!!!

No, you got me there.  I'm in my mid 40's and quite flexible, despite my love handles.

Philip
  • Member since
    June 2006
  • From: Sweden
  • 1,808 posts
Posted by Lillen on Saturday, March 29, 2008 6:42 PM

I've been thinking real hard! I've come up with an idea. I'm not to sure it's plausible. It's more an idea then an actual plan so please. No name calling OK? Big Smile [:D]

 

Basically my idea is a version of a mushroom and a multideck. At the lowest level, 80 cm of the base floor, then the next 120, then 160 and then the last 200cm of the base floor.

Now, the lowest would only be accessible from the right side and the top one would only be accessible from the left side. This very detailed plan in  the picture depicts the peninsula. On the left side the floor would be 40 cm higher. That way the lowest shelf and the highest shelf would be at the same level. On the sides along the walls there would be no 200 cm shelf to the right and no 80 cm shelf to the left.

 The advantage that I see is that I could make the top and bottom penninsuala very wide. One of them, the top could have the passenger station, the bottom could have the ships and just a lot of water behind them to increase the depth of the scene.

Is this just to stupid to work? I know it's kind of weird but it's an interesting and probably unprobable thing to do but I would like some feed back.

 

 

Magnus

 

Unless otherwise mentioned it's HO and about the 50's. Magnus

Subscriber & Member Login

Login, or register today to interact in our online community, comment on articles, receive our newsletter, manage your account online and more!

Users Online

There are no community member online

Search the Community

ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT
Model Railroader Newsletter See all
Sign up for our FREE e-newsletter and get model railroad news in your inbox!