Need info on Wolf Creek trestle on Oregon (SP) Tillamook branch.
Tring to model a compressed version of the trestle. Can't find this information in any book except pictures in (Southern Pacific in Oregon).
1. Only have two pictures of the bridge. The bridge apears to have some bents with 6 piles and some that have 5 is this correct/normal?
2. what angles should the piles be at for the 5 or 6 pile bents?
3. What is the bent spacing?
4. The section over the river is it wood or steel?
5. What are the sections on the hand rail with angled planking near the fire buckets?
John
Go to http://spcascades.railfan.net/ and contact him. Ask nicely if he knows if he could point you in the right direction. Or contact Joe Fugate (often posting on this forum) and do the same. That would be my best bet. Both are very good people.