If everybody is thinking alike, then nobody is really thinking.
http://photobucket.com/tandarailroad/
It takes an iron man to play with a toy iron horse.
Take a Ride on the Reading with the: Reading Company Technical & Historical Society http://www.readingrailroad.org/
http://www.trainboard.com/railimages/showgallery.php?cat=500&ppuser=5959
If one could roll back the hands of time... They would be waiting for the next train into the future. A. H. Francey 1921-2007
Colorado Front Range Railroad: http://www.coloradofrontrangerr.com/
Modeling B&O- Chessie Bob K. www.ssmrc.org
--David
QUOTE: Originally posted by CanadianShield Thank you very much all of you for your responses. I think what I am going to go with is a culvert under the first four tracks, and as the 5th track is the mainline (but parallel to the yard) put a bridge there. I river I I I I I ----------------------- yard track 4 ----------------------- yard track 3 ----------------------- yard track 2 ----------------------- yard track 1 ============= Mainline with a bridge I I I I I river I Uh-yea like that...sort of[:p][:D][:0]