Modeling the Reading Railroad in the 1950's
Visit my web site at www.readingeastpenn.com for construction updates, DCC Info, and more.
Chip
Building the Rock Ridge Railroad with the slowest construction crew west of the Pecos.
QUOTE: Originally posted by rrinker (the yard will not have stationary decoders, a much cheaper circuit will be used, since there's no reason for a yard to be dispatcher controlled).
QUOTE: Individual sidings off the main is a toss-up - one button on each leg, with an indicator LED, or one button centered on the turnout with an LED on each leg?
QUOTE: And then there's the crossover. On the panel I built with toggles, there is an LED in the straight leg of each turnout, plus one centered in the crossover portion - total of 3 LEDs, either the 2 straight ones are on or the middle one is on, depending if the crossover is set for straight through or for crossing over.
QUOTE: The switch sits off to the side. To do this with pushbuttons - I COULD just put a pushbutton set to 'toggle' mode where the toggle switch was, OR put 2 or more pushbuttons..where?