CJtrainguy The Swedish X2000 trains are currently undergoing full rebuilds, changing out most of the interiors and much of the technology to make them fit for another 20-25 years of service. The calculation was that a rebuild is 1/3 of the cost of a new train set. Plus passenger comfort increases and realiability/availability of the trainsets will increase.
The Swedish X2000 trains are currently undergoing full rebuilds, changing out most of the interiors and much of the technology to make them fit for another 20-25 years of service. The calculation was that a rebuild is 1/3 of the cost of a new train set. Plus passenger comfort increases and realiability/availability of the trainsets will increase.
Editor Emeritus, This Week at Amtrak
It is tooo early to evenspeculate onwhat will happen with AX-1s. Too many factors could change how Amtrak will Do with the units once AX-2s pass initial testing and break in problem corrections.
One way probably have AX-2s start south of NYP filling one NYP <> WASH round trip. After 4 AX-1s are replaced maybe some AX_1s could be combined to provide for 2 power car retrenchments and more seats on other AX-1s trips?
Or immediately go for more Acela trips once 4 or more AX-2s proven?
What Acela ridership will be then is a wild card. If ridership fall, remains same, AX-2s absorb traffic, Acela demand swings wildly, Then if the train length problem at BOS is solved all these factors change. If 39 train limit raised ? If some regionals are converted to Acelas? The many possibilities are mind numbing ?
blue streak 1It is tooo early to evenspeculate onwhat will happen with AX-1s.
Amtrak Equipmet Asset Line Plan FY20-24 pg.8Acela Express equipment (20 trainsets totalling 160 active units plus one inspection car), built 1999-2001 by Alstom & Bombardier; these trainsets will be retired following the delivery of Alstom Avelia Liberty trainsets currently on order.
Actually how the AX-1s are utilized during transition from AX-1s to AX-2s will be subject to speculation. One factor is how the transition is handled depends on how reliable the =2s are when subject to the rouch track on the NEC compared to the pure trackage of Europe