Trains.com

Amtrak critical work needed now

1731 views
8 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,824 posts
Amtrak critical work needed now
Posted by blue streak 1 on Wednesday, April 22, 2015 12:08 PM

Several articles on what Amtrak needs on the NEC and HSR is not first priority.

http://www.nationaljournal.com/congress/amtrak-obama-promise-bullet-trains-new-bridge-20150420

http://www.citylab.com/commute/2015/04/8-critical-rail-projects-that-amtrak-cant-afford/391038/

 IMO these projects are all needed to prevent a failure of the nEC that would end up being called a national crisis.  Then congress and the president will both be blamed.  It is not improving 125 MPH to 160 MPH speeds for 48 miles ( Newark - Trenton ) saving  ~  5 minutes over any of the listed projects will save 5 minutes or more with the additional importance of improving reliability.

 

 

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,824 posts
Posted by blue streak 1 on Wednesday, April 22, 2015 12:44 PM

IMO these projects are all needed to prevent a failure of the NEC that would end up being called a national crisis.  Then congress and the president will both be blamed.  It is not improving 125 MPH to 160 MPH speeds for 48 miles ( Newark - Trenton ) saving  ~  5 minutes over any of the listed projects that will save 5 minutes.  Rather the additional importance of improving reliability.

 New brunswick will save even less time of about ~ 4 minutes.  Both improvements would only be for Acelas since regionals and LD are or will be limited to 125 MPH.  Also no acceleration decelaration times have been noted which are ~ 1 minute both ways for each stop..  So 2 minutes and 3 minutes saved at the maximum for the legs.  Remove the slow sections  will save more time per dollar spent.

  

  • Member since
    September 2010
  • From: East Coast
  • 1,174 posts
Posted by D.Carleton on Wednesday, April 22, 2015 3:39 PM

Please bear in mind that most of the "improvements" are rectifications of past (in most cases long past) due maintenance. (The loop at Adams is for enhanced commuter operations.) The NEC is such a basket case that regular maintenance is no longer viable. The whole thing needs to be torn down and rebuilt from the catenary to the tunnels and everything in between. That said, since freight is all but banned from the Nothing Else Counts loosing it will not constitute a "crisis."

Editor Emeritus, This Week at Amtrak

  • Member since
    September 2011
  • 6,400 posts
Posted by MidlandMike on Wednesday, April 22, 2015 10:33 PM

D.Carleton

... That said, since freight is all but banned from the Nothing Else Counts loosing it will not constitute a "crisis."

 

The NEC is a major passenger carrier in its lane.  NY airports and I-95 are near capacity.  Congress' seeming concern for the NEC as the only really critical part of Amtrak, indicates that even they understand how its loss would be a crisis.

  • Member since
    September 2010
  • From: East Coast
  • 1,174 posts
Posted by D.Carleton on Thursday, April 23, 2015 2:03 AM

MidlandMike
 

The NEC is a major passenger carrier in its lane.  NY airports and I-95 are near capacity.  Congress' seeming concern for the NEC as the only really critical part of Amtrak, indicates that even they understand how its loss would be a crisis.

For those of us who have been astutely following the Nothing Else Counts for a while this just another case of "deja vu all over again." The NEC has been a basket case for the last half-century if not longer. The last time I looked the maintenance backlog was at least $1 million per mile and that was before the hurricane. And that does not include the replacement of tunnels under the Hudson River or Baltimore or any of the numerous bridges.

So what are we to do about this, eh? Write your congress critter? Write your governor? Write a letter to the editor, that is if your town still has a newspaper? Frankly, I have had it with wringing my hands raw. This is a can that has been kicked down the road so many times it has racked up frequent flier miles. When the worst comes to pass, one of the tubes into Penn Station suffers a catastrophic failure or a bridge collapses with or without fatalities, then those in authority will feign surprise and make a call to "action" in front of the cameras of a hastily called press conference. Remember, suffering and disaster is a chance for politicos to show they "care." Fingers will wag, hearings will be held and hot air will profligately spew with all of the righteous indignation they can muster between junkets. This is rerun I'm sick of watching and changed the channel long ago. Crisis? You mean it's real this time? Don't make me laugh.

Editor Emeritus, This Week at Amtrak

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,824 posts
Posted by blue streak 1 on Sunday, May 3, 2015 7:43 PM
  • Member since
    May 2003
  • From: US
  • 24,931 posts
Posted by BaltACD on Sunday, May 3, 2015 8:51 PM

 

I am amazed at how little money is projected for the B&P tunnel project - at 2 tracks and 30 MPH that is THE major bottleneck on the NEC.

Never too old to have a happy childhood!

              

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,824 posts
Posted by blue streak 1 on Sunday, May 3, 2015 9:18 PM

Balt:  As read the $310M is only for design and preliminary construction.

  • Member since
    May 2003
  • From: US
  • 24,931 posts
Posted by BaltACD on Sunday, May 3, 2015 9:21 PM

blue streak 1

Balt:  As read the $310M is only for design and preliminary construction.

 

So, in fact, $310M for no capital improvement.

Never too old to have a happy childhood!

              

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy