Trains.com

Moveable bridges some technical details

1164 views
3 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Moveable bridges some technical details
Posted by blue streak 1 on Wednesday, December 10, 2014 9:34 AM

Railway age article on how moveable bridges work.  This article applies to all RRs but posting in passenger forum as the higher speeds and electrification causes additioonal complications.  After reading is it any wonder that Amtrak wants to replace all?  As well MNRR?  Wonder if the Portal bridge failures are a good example.  Those bridges that are infrequently used may be more prone to failure such as the PATH bridge section of Dock Bridge last month?

 

http://www.railwayage.com/index.php/m_and_w/movable-bridge-best-practices.html?channel=5

 

 

 

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Wednesday, December 10, 2014 10:00 AM

Except for the catenary sled and items related to the overhead, most of the same features apply to movable bridges anywhere.  Infrequent movements may not be an issue in failures as the movable street bridges on the South Branch of the Chicago River work rather smoothly despite being raised only several times a year.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    May 2003
  • From: US
  • 25,292 posts
Posted by BaltACD on Wednesday, December 10, 2014 3:13 PM

Highway bridges only have to be in alignment on a single plane - the plane of the roadway and highway vehicles can easily withstand minor alignment errors.

Rail bridges have to be in EXACT alignment on all rail connections, both virtically and horizontally and locked in those positions for all the safety mechanisms to permit lining signals across the bridge.  Railroad operation does not permit the operation over the span with mismatches that would be allowable in highway use.

Never too old to have a happy childhood!

              

  • Member since
    September 2010
  • 339 posts
Posted by efftenxrfe on Wednesday, December 10, 2014 8:03 PM

BaltACD, knows what he's talkin' 'bout.

I don't know whether it's weeks or months of my 42 years, in engine service that I've been stopped while the maintainers tweaked the drawbridge and its signal circuits to allow me to cross the span.

Where I had rights to run included 10 moveable (draw-) bridges to cross. All of them got me....uh, OK, one didn't.

Yes, I'm part of the roster which put two engines, 5 locomotives, into the Napa River at the open drawbridges.

Something else: turntables are moveable bridges....right?

Exact alighnment? Santa Clara and Watsonville Jct's turntables required balancing the locomotive on the 'tables, so that the 'table's engine, compressed air from the engine's main reservoir powered it, wasn't stalled or didn't spin its drive wheels.

When your engine entered that 'bridge it climbed or descended a gap which permitted attaining the balance point. I doubt inches, but less than a couple of lateral feet. Try that with an FM Trainmaster, that was a big locomotive then.

 

 

 

 

 

 

 

 

 

 

 

 

 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy