Trains.com

DC Metro transformer fire and maintenance problems

2047 views
10 replies
1 rating 2 rating 3 rating 4 rating 5 rating
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Tuesday, November 10, 2015 11:22 AM

More maintenance problems.  This time lack of spare parts for 1000 cars and 7000 cars improper bolts.  Certainly seems like a slow house cleaning of personell due when competent replacements can be found.

https://www.washingtonpost.com/local/trafficandcommuting/design-flaws-slow-production-of-metros-high-tech-rail-cars-impacting-service/2015/11/09/a14e3b0c-8660-11e5-9a07-453018f9a0ec_story.html

 

 

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Wednesday, October 28, 2015 8:49 PM

One of the most direct letters ever published sent to Metro.  " It is not business as usual "  among other statements. 

http://www.fta.dot.gov/documents/WMATA_letter_re_FTA_Oversight_10-26-2015.pdf

 

 

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Tuesday, October 13, 2015 3:59 PM

Took just 2 weeks for Foxx to asign WMATA to the FTA after NTSB recommendation for WMATA to FRA.   Would sure like to have been a fly on wall for the back room maneuvering to keep it from the FRA.  Certainly the board did not protest anything.  Might have scared them for FRA to enter the game.  But FTA might borrow some FRA inspectors ?

http://www.rtands.com/index.php/safety-training/fta-to-take-over-wmata-rail-safety-oversight.html?channel=

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Friday, October 2, 2015 9:58 AM
  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Friday, October 2, 2015 6:48 AM

I tend to doubt it at this point.  The first FRA proposal may have been made in order to force the issue.  Since the FTA appears to be stepping up with a similar proposal, the FRA may choose not to add to its jurisdiction.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Thursday, October 1, 2015 5:40 PM

Now the FTA is proposing rail systems will have to meet  "state of good repair" standards.  Wonder if this is a quick reply to NTSB's call to put rail under FRA standards ?  Turf war coming up between FRA and FTA ?

  • Member since
    June 2002
  • 20,096 posts
Posted by daveklepper on Thursday, October 1, 2015 7:30 AM

When Boston's system was knocked out by the snow, New York's system loaned them two (?) portably substations.

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Wednesday, September 30, 2015 7:32 PM

Although it wil probably not happen NTSB is recommending Metro rail be transferred to FRA jurisdiction and oversight.  Will this be a wake up call for METRO ?  Only time will tell.  Now if congress gets involved ?

https://www.washingtonpost.com/local/trafficandcommuting/2015/09/30/269fd2f6-6781-11e5-8325-a42b5a459b1e_story.html

If it happens all other syems would not be far behind. 

 

  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
Posted by blue streak 1 on Monday, September 28, 2015 3:29 PM

CSS your are making a problem that is minor.  Place transformer(s) on low boy, drive to available site parking, and have local utility hook up high   voltage connections while transit hooks up connection to its grid.  Might not be necessay at failed station but another sub.  Certainly done in a week ?  better than 6 months. 

Believe that our local utility has one or more transformers available for their operations.

 The real question IMHO is why is METRO so screwed  up  ?  Makes NJT look good.

 

  • Member since
    March 2016
  • From: Burbank IL (near Clearing)
  • 13,540 posts
Posted by CSSHEGEWISCH on Monday, September 28, 2015 1:57 PM

A portable sub sounds like a good idea but you would still have to find a place to put it and the utility would have to have a location where it could be plugged in.

The daily commute is part of everyday life but I get two rides a day out of it. Paul
  • Member since
    December 2007
  • From: Georgia USA SW of Atlanta
  • 11,919 posts
DC Metro transformer fire and maintenance problems
Posted by blue streak 1 on Monday, September 28, 2015 12:59 PM

The saga never seems to end.  Now delays and by passing certain stations.  The question has to be why wasn't the system designed so the failure of a major substation could be taken over by adjaecent substations ?  Another question could be why hasn't Metro bought a portable substation that could be transported to a failed station ?

https://www.washingtonpost.com/blogs/dr-gridlock/wp/2015/09/28/metro-orange-silver-line-trains-will-bypass-stadium-armory-during-rush-hour-starting-tuesday/

https://www.washingtonpost.com/local/trafficandcommuting/six-months-of-rush-hour-slowdowns-coming-for-three-metro-subway-lines/2015/09/25/aa0a681c-63b3-11e5-8e9e-dce8a2a2a679_story.html

Now of course what have the other rail systems around the country done to avoid metro's problem ?   Maybe a fed loan to build a portable substation that could be used by any of several systems ?  Unit could be either  600V or 750V DC output. 

 

 

Join our Community!

Our community is FREE to join. To participate you must either login or register for an account.

Search the Community

Newsletter Sign-Up

By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our privacy policy