Hi, Can anybody tell me how many switch towers are still active on the Long Island RR? I am assuming that JAY at Jamaica and HAROLD in Queens are still active? Any info anyone can give me is appreciated. Thanks!
I don't think there are any in the sense in which you ask. Divide and Babylon are open remote controlling interlockings and switchers and issuing track warrants, etc. but not the same as the old days of towers. Other tower locations are controlled by these two or from Jamaica.
RIDEWITHMEHENRY is the name for our almost monthly day of riding trains and transit in either the NYCity or Philadelphia areas including all commuter lines, Amtrak, subways, light rail and trolleys, bus and ferries when warranted. No fees, just let us know you want to join the ride and pay your fares. Ask to be on our email list or find us on FB as RIDEWITHMEHENRY (all caps) to get descriptions of each outing.
LION asked over at SubChat and came up with the following information:
JCC only controls JAY, HALL, and DUNTON at the moment. The towers are set up like this (with the bold tower controlling the non-boldface interlocking): QUEENS: GARDEN, HOLLIS, QUEENS NASSAU: LOCUST, NASSAU 1 through 4 DIVIDE: AMOTT, BETH, BRENT, CI, DIVIDE 1 through 6, DUKE 1 through 2, FARM 1 through 2, FOX 1 through 2, HUNT 1 through 3, JEFF, JS, KO 1 through 2, POST 1 through 2, STONY 1 through 2 VALLEY: VALLEY, WM, PORT, ROCKY BABYLON: AMITVILLE, BABYLON 1 through 4, JJD 1 through 2, PD, SK 1 through 2, WANTAGH, Y LEAD: LEAD BROOK: BROOK 1 through 2, ENY West Side Yard JCC: DUNTON, HALL, JAY Movement Bureau (Jamaica): BAY, NECK 1 through 3, SHEA, WOOD PSCC: A, C, EMPIRE, F, GATE, HAROLD, CP JERVIS, JO, KN, PELLHAM, CP POINT Q: Q, R DIVIDE controls the Main Line block limits, YA, MR, AH, LD, R, K, SD, GY. BABYLON control the Montauk Branch block limits, WH, ND, SN, BH, AG, MY. When the Speonk to Montauk Signalization project is complete BABYLON will also gain control over HB, SH, CP AGT, and CP MON interlockings. QUEENS and VALLEY recently received new stuff at their towers and interlockings, rumor has it DIVIDE and BABYLON are next up for some improvements. NASSAU tower stands in the way of the alleged third track, so that tower's days are numbered (if the NIMBYs ever loosen their grip). Eventually the goal is to get everything (except perhaps LEAD) controlled from JCC. However, the timeline for relocating all of the eggs to the one basket is "open-ended."
The Route of the Broadway Lion The Largest Subway Layout in North Dakota.
Here there be cats. LIONS with CAMERAS
Our community is FREE to join. To participate you must either login or register for an account.