Login
or
Register
Home
»
Trains Magazine
»
Forums
»
Steam & Preservation
»
ATSF 3463 Rebuild Project
Edit post
Edit your reply below.
Post Body
Enter your post below.
<p>[quote user="Rikers Yard"] If they are going to make a new boiler and changes in the running and valve gear, why not start from the ground up? Wouldn't it be easer to build it the way it needs to be rather than fudge it together to fit with what you have? Not a design engineer, but it makes sense to me. And you wouldn't be destroying history for maybe nothing.</p> <div style="clear:both;"> Tim[/quote]</div> <p><span style="font-family:verdana,geneva;">It makes sense to me too. From reading their various news releases, this is what I gather they intend to do:</span></p> <p><span style="font-family:verdana,geneva;">Design and build a new boiler and steam delivery circuit. I suspect that might require a new throttle assembly, superheater, and at least some modification to the cylinder assembly.</span></p> <p><span style="font-family:verdana,geneva;">Design and build a gas producer firebox for the boiler. This would require a different grate system, steam cooling jets under the grate, and secondary combustion air inlets that penetrate both walls of the firebox, and let air in above the fire.</span></p> <p><span style="font-family:verdana,geneva;">Design and produce new drivers, rods, and counterbalancing design. </span></p> <p><span style="font-family:verdana,geneva;">Superinsulate the boiler, cylinders, and all steam piping. </span></p> <p><span style="font-family:verdana,geneva;">Design and build a new exhaust nozzel system.</span></p> <p><span style="font-family:verdana,geneva;">Possible modification of lead and trailing trucks, tender trucks, bearings, and all suspension systems including springs, equalizers, etc.</span></p> <p><span style="font-family:verdana,geneva;">Design and build an entirely new fuel delivery system.</span></p> <p><span style="font-family:verdana,geneva;">Design and build an automatic firing system that enables one-man operation. This would probably include completely new montioring and control system for fuel and water delivery.</span></p> <p><span style="font-family:verdana,geneva;">Design and build a streamlining shroud for the locomotive.</span></p> <p> </p> <p><span style="font-family:verdana,geneva;">They have estimated $3-million for this work.</span></p> <p> </p>
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy