Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
Article on Euro-tunnels
Edit topic
Updated your discussion topic below.
Subject
Enter a subject for your topic. Maximum 150 characters.
Post Body
Enter your post below.
Thought some of you might find this interesting. Remember, all this occurs under what is essentially an open access rail system in Europe. What jumps out at me is the mention of having freight trains travelling at 100 mph. I wonder if that is a typo, e.g. perhaps the writer meant 100 kph. <br /> <br />Nov 21, 2004 <br /> <br />New Tunnels Under the Alps Augur a Traffic Revolution for Europe - Albeit a Delayed One <br />By Bradley S. Klapper <br />Associated Press Writer <br /> <br /> <br />GENEVA (AP) - In a few years train passengers will vanish into a tunnel just south of Zurich and emerge 30 minutes later blinking in southern European sunshine. They'll have missed the Alpine views but shortened their journey to Italy by half. <br />With mega-projects such as this one, the new, increasingly borderless Europe is knitting itself together by busting through ancient physical barriers - a tunnel from England to France, a Scandinavian bridge that makes it possible to drive from the Arctic Circle to the Mediterranean shore, and soon, running 36 miles under the Alps, the world's longest rail tunnel. <br /> <br />Not as soon as hoped, though. The drilling is going slower than forecast, meaning the tunnel under the St. Gotthard massif to Milan will only open in 2015 or 2016 - five or six years late - and will cost some $2 billion more than the $10.7 billion Swiss voters were told when they approved the dig in a 1992 referendum. <br /> <br />A second, shorter tunnel, the 21-mile Loetschberg, is being dug to link Bern, the capital, to Milan in northern Italy. It's on course for completion in 2007 as planned, the Transport Ministry says. <br /> <br />But for the Swiss, proud of their reputation for efficiently handling both time and money, the delay in drilling the Gotthard is a bit of an embarrassment. <br /> <br />"Geological difficulties are the main cause for the rising costs and delay," said Davide Demichele, a Transport Ministry spokesman. "It is normal with tunnel projects that you cannot always tell exactly where problems lie." <br /> <br />The Gotthard tunnel is even tougher because it has more mountain above it than any other in the world - a 7,500-foot-high mass of rock. Engineers have had to stop repeatedly because of fault lines as well as heat and dust churned up by the weight of mountain pressing down on drilling equipment. <br /> <br />Last year, for instance, engineers found an unexpected fault line near the tunnel's southern end. Steel arches were used to buttress the rock while drilling proceeded more slowly, and a planned maintenance point had to be moved to another area. <br /> <br />This problem alone set work back by a year. Attempts to speed the tunneling machines have so far failed to make up for lost time or cut costs. <br /> <br />"If there is a problem, then we have to solve it, but it is much more expensive when these come as surprises," said Demichele. <br /> <br />For the Swiss, the Gotthard and Loetschberg tunnels can't come soon enough. With the Iron Curtain gone and the European Union expanding, truck traffic across the Alps grew more than tenfold between 1980 and 1998, while rail freight rose just 37 percent, according to AlpTransit Gotthard AG, the company which is managing the whole project. <br /> <br />The Swiss, who aren't in the EU, have tired of traffic jams caused by big rigs and vacationers clogging their tunnels. The government has promised to halve the number of trucks on the highways, and the new rail tunnels, carrying trucks as well as passengers, look like the ideal solution. <br /> <br />The Gotthard will halve the present travel time between Zurich and Milan to two hours and 10 minutes. The Bern-Milan route through the Loetschberg tunnel will be shorter by an hour and take the same time as Zurich-Milan. <br /> <br />By running at low elevation, the tunnels are something like mouse holes at floor level, able to accommodate trains and cargo loads that cannot negotiate the long climb and switchbacks to existing tunnels nearly 2,000 feet higher. Freight trains will be able to more than double their speeds to over 100 mph, passenger trains to over 150 mph. <br /> <br />A grandiose plan still on the drawing boards is the Porta Alpina underground station, which would be the world's deepest. Halfway between Zurich and Milan, an elevator would lift passengers 2,600 feet up through Alpine rock to give them a view of the beautiful Surselva Valley, and return them underground to catch a later train. <br /> <br />But there's no money yet. A feasibility study put the cost at some $33 million to $42 million. "The construction is possible," said Alptransit spokesman Ruedi Suter. "But we need someone willing to order it and pay for it." <br /> <br />AP-ES-11-21-04 1244EST <br /> <br />This story can be found at: http://ap.tbo.com/ap/breaking/MGBADD5IT1E.html <br /> <br /> <br /> <br />
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
E-mail Subscribe
Check the box below if you want to receive e-mail notifications when replies are made to this thread.
Receive notifications
Update Discussion Topic
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy