Login
or
Register
Home
»
Trains Magazine
»
Forums
»
General Discussion
»
Coal Log Pipelines - The Answer to the perpetual PRB transport problems?
Edit post
Edit your reply below.
Post Body
Enter your post below.
dehusman - I consider the maintenance problems of the Orin line as endemic of capacity constraints. Even if BNSF has fixed the line by now, they are still projected to only provide 80% of the coal orders for the rest of the year, according to the story. <br /> <br />You could have one centrally located facility processing logs for/from each mine, so that specific blends can be maintained. If the mineheads are located close enough to the log processing facility, then such short transportation shouldn't be a problem. <br /> <br />Don't get me wrong on this. I would prefer more rail capacity to slurry or log pipelines. But the reality is the closed access rail system does not allow for rail capacity to be built for future demand, rather it is built incrementally (and reluctantly, if at all) as demand exceeds supply, so there is a constant congestion problem built into the system.
Tags (Optional)
Tags are keywords that get attached to your post. They are used to categorize your submission and make it easier to search for. To add tags to your post type a tag into the box below and click the "Add Tag" button.
Add Tag
Update Reply
Join our Community!
Our community is
FREE
to join. To participate you must either login or register for an account.
Login »
Register »
Search the Community
Newsletter Sign-Up
By signing up you may also receive occasional reader surveys and special offers from Trains magazine.Please view our
privacy policy
More great sites from Kalmbach Media
Terms Of Use
|
Privacy Policy
|
Copyright Policy